R4 Seed Project Site Visit Schedule 241003.pdf

PDF 88 KB Posted

Attached to
UNITED STATES FOREST SERVICE, INTERMOUNTAIN REGION 4, ROAD AND BRIDGE CONSTRUCTION SERVICES MATOC
Solicitation number
1240LU24R0012
Issued by

About this file

This document appears to be a site visit schedule for five seed projects that will be part of a forthcoming Request for Proposal (RFP) for an Indefinite Delivery-Indefinite Quantity (IDIQ), Multiple Award Task Order Contract (MATOC) for road and bridge construction services in the United States Forest Service (USFS) Intermountain Region 4.

The five seed projects include work such as replacing a bridge and installing a culvert, road reconditioning and culvert replacement, reconstructing and surfacing a parking lot, replacing a culvert, and road reroutes, decommissioning, reconditioning, and aggregate surfacing. The site visits will occur between October 9-17, 2024, with project locations in Nevada, Wyoming, Utah, and Idaho. Interested parties must register in the System for Award Management (SAM) and submit questions to the Contracting Officer. The forthcoming MATOC solicitation will be issued as a total small business set-aside, with a minimum of ten individual MATOC contracts awarded for a base two-year period and three one-year option periods.

View the file

Other files

File Type Posted
Causey Reservoir Parking Lot_Plans.pdf PDF
Upper Green River_Plans.pdf PDF
Upper Green River_FSSS.pdf PDF
CoveMountain_Plans.pdf PDF
Charleston Jabridge_Plans.pdf PDF
CoveMountain_FSSS.pdf PDF
Charleston Jabridge_FSSS.pdf PDF
North Fritz_FSSS.pdf PDF
North Fritz_Plans.pdf PDF
R4 Seed Projects Site Visit Schedule.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

10/03/2024

Intermountain Region 4 - Road and Bridge MATOC Site Visit Information

There are five seed projects that will be solicited within the Forest Service Region 4 Road and Bridge multiple award task order contract (MATOC). The MATOC seed project site visit details are listed below.

Project site visits will occur at the project coordinates, dates and times listed below. Please see contact information below for site visit coordination.

Charleston Jarbidge

The project consists of removing the existing Charleston-Jarbidge Road Bridge and installing a 128” x 83” corrugated metal pipe-arch culvert in the same location. Public vehicle access must be maintained during the entire project, so a rock ford and road approaches shall be constructed and maintained just upstream of the existing bridge prior to the bridge removal.

Location: Charleston, NV

Project Coordinates: 41.7038, -115.483787

Site Visit Date and Time: 10/9/24 at 12:00 pm (PT)

Contact: Coby Cubic Email: Coby.Cubic@usda.gov Phone: 702- 468-3982

Upper Green River Corridor

The project consists of road reconditioning, culvert replacement and placement of government furnished aggregate surfacing on 3 miles road.

Location: Cora, WY

Project Coordinates: 43.22171, -110.008137

Site Visit Date and Time: 10/10/24 at 1:00 pm (MT)

Contact: Katy Bilisoly Email: katy.bilisoly@usda.gov Phone: 307-368-0719

Causey Reservoir Overflow Parking Lot

The project consists of reconstructing and surfacing a parking lot with aggregate base coarse.

Location: Huntsville, UT

Project Coordinates: 41.29705, -111.584918

Site Visit Date and Time: 10/15/24 at 1:00 pm (MT)

Contact: Michael Bender Email: Michael.Bender@usda.gov Phone: 801- 657-1545 mailto:Coby.Cubic@usda.gov mailto:katy.bilisoly@usda.gov mailto:Michael.Bender@usda.gov

10/03/2024

North Fritz Creek Culver Replacement

The project consists of removing a 4’ diameter corrugated metal pipe and replacing it with 16’- 4” span bottomless box culvert.

Location: Dubois, ID

Project Coordinates: 44.4134, -112.7376

Site Visit Date and Time: 10/16/24 at 10:00 am MT

Contact: Jonathan Wheeler Email: Jonathan.Wheeler2@usda.gov Phone: 208-541-1114

Cove Mountain Reroute and Reconstruction

The project consists of two road reroutes, road decommissioning, road reconditioning, constructing rolling dips, placement of aggregate surface coarse and a culvert installation.

Location: Pinto, UT

Project Coordinates: 37.5547, -113.52722

Site Visit Date and Time: 10/17/24 at 1:00 pm (MT)

Contact: Steven O’Neil Email: Steven.Oneil1@usda.gov Phone: 435-691-3753 mailto:Jonathan.Wheeler2@usda.gov mailto:Steven.Oneil1@usda.gov

File details come from the government source that posted it. Updated .