1240LU24Q0010 Attachment 4 Drawings Bridger Bangtails Trail Renovation CGNF.pdf
PDF 352 KB Posted
- Solicitation number
- 1240LU24Q0010
- Issued by
-
Department of Agriculture Forest Service
About this file
This document contains drawings and specifications for a federal contract solicitation for trail renovation work. The solicitation is for the GAOA Bridger and Bangtail Trail Facility Renovation project located on the Custer Gallatin National Forest. The work involves clearing, constructing typical trail cross sections, installing drainage features such as drain dips and switchbacks, constructing culverts with headwalls, and installing signs and rock retaining walls. The drawings provide illustrations and specifications for the terms, clearing limits, typical trail cross sections, trailbed and slope finish, drainage features, switchbacks, culvert installations, and signage that is required as part of the renovation work. The solicitation number is 1240LU24Q0010 and is being issued by the US Department of Agriculture Forest Service.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
GAOA BRIDGER BANGTAIL
No.
900-1
911-1
912-1
912-2
912-5
913-1
914-1
915-1
921-1
952-1
935-1
Trail Facility Renovation Phase 2 IDX
Bozeman Ranger District
Custer Gallatin National Forest
Standard Drawings
OCT 2023
Drawing Description
ILLUSTRATION OF TERMS
CLEARING LIMITS
TYPICAL TRAIL CROSS SECTIONS
TRAILBED AND SLOPE FINISH
DRAIN DIP
SWITCHBACK - TYPE I
TRAIL RESTORATION
CULVERT WITH HEADWALLS
SIGNS & POSTS
ROCK RETAINING WALL
| 900_00_gnf_Cover |
| 900_01_gnf_Terms |
| 911_01_gnf_Clearing |
| 912_01_gnf_TypTrail |
| 912_02_gnf_Trailbed |
| 912_05_gnf_DrainDip |
| 913_02_gnf_TurnpikeII |
| 914_01_gnf_Switchback-I |
| 915_01_gnf_Restoration |
| 921_01_gnf_CulvertHW |
| 952_01_gnf_Sign&Post |
| 954_01_gnf_Obliteration |