1240LU24Q0010 Attachment 2 Statement of Work Bridger Bangtail Trail Facility Renovation CGNF.docx
DOCX document 58 KB Posted
- Solicitation number
- 1240LU24Q0010
- Issued by
-
Department of Agriculture Forest Service
About this file
This statement of work outlines trail maintenance services required by the USDA Forest Service on the Bozeman Ranger District of the Custer Gallatin National Forest in Montana. The contractor will provide equipment and operators to restore approximately 21 miles of single-track motorcycle and ATV trails to their original templates through clearing, grading, drainage repair, and removing debris. Additional tasks include constructing 3,000 square feet of rock retaining walls, installing signage and bulletin boards, and operating a mini excavator for 25 hours to complete miscellaneous work. The period of performance is from June 15, 2024 to September 1, 2024, with work taking place Monday through Saturday from 7:00 a.m. to 6:00 p.m. as weather permits. The contractor must follow all safety requirements including posting signage when machinery is in use and barricading unfinished work. Payments will be made on a per-item, per-mile, and hourly basis according to quality inspection thresholds outlined in the deliverables section.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
US Department of Agriculture (USDA)
Statement of Work
Contents
| Project | 3 | |
| General Information | 3 | |
| 1.0 | Scope of Work | 3 |
| 2.0 Background | 3 | |
| Contractor Requirements | 4 | |
| 3.0 Technical Requirements / Tasks | 4 | |
| 4.0 Government Furnished | 5 | |
| 5.0 Deliverables / Schedule | 5 | |
| 6.0 Travel | 6 | |
| 7.0 Contractor’s Key Personnel | 6 | |
| 8.0 Safety Requirements | 7 | |
| 8.0 Soil Moisture | 7 | |
| 9.0 Period of Performance | 7 |
Project GAOA Bridger and Bangtail Trail Facility Renovation-Custer Gallatin National Forest
General Information
1.0 Scope of Work
This contract is to provide services for trail maintenance work on the Bozeman Ranger District, Custer Gallatin National Forest, near Bozeman, Montana.
This contract requires furnishing equipment on a fully operated basis, in good mechanical and operating condition and operated by competent operators, experienced in performing work of the nature required by this contract. The Contractor will provide all equipment, operating supplies, operators, supervision, and support functions necessary to perform the required work on an hourly, per item, and per mile basis.
The work is located on numerous single track motorcycle trails on the Bozeman Ranger District, Custer Gallatin National Forest, near Bozeman, Montana.
2.0 Background
The work to be accomplished is associated with trail restoration, repair, and heavy maintenance, which shall include but is not limited to, restoring trail to the original trail template, including clearing, grading, blading, removing slough and berm, borrow, filling ruts and troughs, reshaping trail tread, restoring and cleaning drainage structures, removing protruding rocks, roots, and stumps, widening pullouts, restoring and reshaping switchbacks, repairing tread failure, constructing and repairing and constructing rock retaining wall, and removal of rock and material from landslides and backslope collapse.
Other work may include the installation of road and trail signposts and bulletin boards, including post hole excavation, setting posts and bulletin boards, and filling post holes after installation. Additional work may include excavation for culvert installation and a pit for a toilet.
Some trails specified for maintenance in this contract are considered single-track width and are open to motorcycles and all non-motorized use. Others are considered ATV width and are open to ATV’s less than 50” in width, motorcycles, and all non-motorized use.
The work is located on numerous single track motorcycle trails, and ATV trails within the Bridger and Bangtail Mountain ranges on the Bozeman Ranger District, Custer Gallatin National Forest, near Bozeman, Montana. The following is a list of work anticipated, to maintain trails under the contract:
1. Custer Gallatin. 9 lineal miles single track trail restoration.
2. Custer Gallatin. 32 switchbacks restored on single track trail.
3. Custer Gallatin. 12 lineal miles atv trail restoration.
4. Custer Gallatin. 3000 square feet rock wall construction,
5. Custer Gallatin. 25 hours mini excavator rental with operator.
| Trail No. | Name | Total Miles | Miles of Restoration Required | ||
| 534 | Bridger Foothills | 20.1 | 5.5 | ||
| 535 | Truman Gulch | 2.7 | 1.5 | ||
| 526 | Upper Bracket Creek | 3.6 | 2.0 | ||
| 502 | Jackson Creek | 10.6 | 10.0 | ||
| 503 | Willow Creek South | 2.5 | 2.0 |
TOTAL 39.5 21.0
Contractor Requirements
3.0 Technical Requirements / Tasks
Trail machinery furnished under this contract shall meet the following minimum specifications and equipment requirements.
Item #1 - Mini Compact Trail Excavator:
Restore single track trail to original trail template, including clearing, grading, blading, removing slough, berm, rocks, roots, and stumps from trail tread and backslope, filling ruts and troughs, reshaping trail tread, and restoring, reshaping and cleaning drainage structures.
(a) Maximum track width: 30”
(b) Tracks.
(c) Front dozer blade.
Item #2 – Mini Compact Trail Excavator:
Restore existing single-track switchbacks to original template, including clearing, blading, grading, removing slough, berm, rocks, and roots from tread and backslope, filling ruts and troughs, reshaping and widening trail tread and backslope.
(a) Maximum track width: 30”
(b) Tracks.
(c) Front dozer blade.
Item #3 – Mini Compact Trail Dozer:
Restore ATV width trail to original trail template, including clearing, blading, grading, removing slough, berm, rocks, and roots from tread and backslope, filling ruts and troughs, reshaping trail tread and backslope, and restoring, reshaping and cleaning drainage structures.
(a) Maximum track width: 48”
(b) Tracks.
(c) Front dozer blade.
Item #4 – Custer Gallatin National Forest Trails
Construct 3000 square feet of stacked rock retaining wall across numerous talus and scree fields on steep hillsides. Rock wall will average 1-1.5 feet wide and 2-4 feet high.
Item #5 – Custer Gallatin National Forest Trails
Install road and trail signposts and bulletin boards, including post hole excavation, setting posts and bulletin board, and filling post holes after installation. Excavation for culvert installation. Misc. excavator work.
(a) Maximum track width: 48”
(b) Tracks.
(c) Front dozer blade
4.0 Government Furnished
The US Forest Service will provide the trail signposts and bulletin boards to be installed by the Contractor.
5.0 Deliverables / Schedule
Existing Trail Restoration Work consists of restoring the original trail template, including clearing, grading, blading, removing slough and berm, borrow, filling ruts and troughs, reshaping trail tread, restoring and cleaning drainage structures, removing protruding rocks, roots, and stumps, widening pullouts, repairing tread failure, and removal of rock and material from landslides and backslope collapse.
95%
| Random Sampling |
| Poor |
Performance Evaluation = Reduced Payment or Re-work.
Good Performance Rating = Full Payment & No Re-work.
Reshaping and Finishing Trail bed Provide a firm and uniformly.
finished trail bed in accordance with cross section shown in the drawings.
95% Random Sampling Poor Performance = Reduced Payment or Re-work.
Good Performance = Full Payment & No Rework.
Rock & Root Removal Uniformly scatter the removed rocks and roots below the trailway and distribute to ensure no blockage of water courses or creation of a windrow. Fill holes with suitable material and compact.
95% Random Sampling Poor Performance Evaluation = Reduced Payment or Re-work.
Good Performance Rating = Full Payment and No Rework.
Slough & Berm Removal
| Remove all slough material from trailway. Remove berm from the trail bed when daylight can be obtained, do not obstruct drainage of out sloped tread |
| 95% |
| Random |
Sampling Poor Performance Evaluation = Reduced Payment or Re-work.
Good Performance Rating = Full Payment and No Rework.
| Drainage |
| Restore and clean out drainage dips to reestablish drainage as shown in the drawings, by removing obstructions such as rocks, roots and sticks. |
Directing water from the trail where washing of the trail bed is or has been occurring.
95%
Random Sampling
Poor Performance Evaluation = Reduced Payment or Re-work.
Good Performance Rating = Full Payment and No Rework.
| Rock Wall |
| Construct stacked rock retaining walls, including excavation, placing borrow, backfilling, and trail bed and slope finishing. Stager vertical joints horizontally. |
Stabilize each rock on the course that supports it. Use rocks of a general rectangle shape.
95%
Random Sampling
Poor Performance Evaluation = Reduced Payment or Rework.
Good Performance Rating = Full Payment and No Rework.
6.0 Travel
Travel expenses are not authorized for this project.
7.0 Contractor’s Key Personnel
(a) The Contractor shall assign to this contract the following key personnel: On-site supervisor
(b) During the first ninety (90) days of performance, the Contractor shall make no substitutions of key personnel unless the substitution is necessitated by illness, death, or termination of employment. The Contractor shall notify the Contracting Officer within 15 calendar days after the occurrence of any of these events and provide the information required by paragraph (c) below. After the initial 90-day period, the Contractor shall submit the information required by paragraph (c) to the Contracting Officer at least 15 days prior to making any permanent substitutions.
(c) The Contractor shall provide a detailed explanation of the circumstances necessitating the proposed substitutions, complete resumes for the proposed substitutes, and any additional information requested by the Contracting Officer. Proposed substitutes should have comparable qualifications to those of the persons being replaced. The Contracting Officer will notify the Contractor within 15 calendar days after receipt of all required information of the decision on substitutions. The contract will be modified to reflect any approved changes of key personnel.
8.0 Safety Requirements
(a) Contractor shall provide two signs stating "Machinery Ahead" with stands. Signs shall be a minimum of 36" x 36" in size with 6" black lettering on an orange background, reflectorized. Signs shall be in good condition and lettering shall be legible. Signs shall conform to U.S. Department of Transportation "Manual of Uniform Traffic Control Devices" (MUTCD), sign W21-3. (See Exhibit A). Signs shall be posted at the beginning and end of the daily work area or trail section before work begins.
(b) If a berm is left in a roadway overnight or weekends due to weather conditions or equipment breakdowns, the Contractor shall place a Type I barricade with an operable Type B illuminated warning light at each end of the berm and at maximum spacing intervals of 1000 feet. These devices shall conform to MUTCD (see Exhibit A). If it is necessary to leave a berm in place over a weekend, the Contractor shall notify the COR or inspector within 3 hours of the cause.
8.0 Soil Moisture
Equipment use may be suspended when soil moisture conditions are not favorable for obtaining a satisfactory result, as determined by the COR or Inspector.
9.0 Period of Performance
The estimated Period of Performance for this project is 06/15/2024-09/01/2024.
Days and Hours of Work. The work is to be accomplished approximately ten hours per day, with no restrictions to the days of the week. The workday shall be between the hours of 7:00 a.m. and 6:00 p.m. Workdays may be inconsistent to accommodate weather, soil moisture, or emergency repairs. This schedule may be altered by mutual agreement during the contract period. Contractor shall notify the COR in advance of any request for any significant alteration.