Updated Schedule of Items.pdf

PDF 252 KB Posted

Attached to
Slip & Slide Dam Decommissioning & Restoration. Custer Gallatin NF
Solicitation number
1240LU22R0007
Issued by

About this file

This document includes a schedule of items for the Slip & Slide Dam Decommissioning & Restoration project for the Custer Gallatin National Forest. The project involves decommissioning three dams and restoring the Slip & Slide drainage area to a native wetland habitat. It will be conducted in two phases over two years.

Phase 1 (Year 1) includes all earthwork, rockwork such as salvage, delivery and placement, and primary herbicide treatment. Phase 2 (Year 2) includes remaining restoration work including seeding, planting, fencing, sod salvaging and placing, spot herbicide treatment, and installing beaver dam analogs. The schedule provides estimated quantities, units, unit prices and totals for over 50 line items across both phases. The Forest Service is the contracting agency. The total base bid for Phase 1 is listed, along with the total for Phase 2, and for both phases combined.

View the file

Other files

File Type Posted
Updated FSSS_Construction_.pdf PDF
22R0007 A00003.pdf PDF
Updated Construction Plan Set.pdf PDF
22R0007 A00002.pdf PDF
22R0007 A00001.pdf PDF
DB WD.pdf PDF
SlipnSlide100centFinalDesignPackage.pdf PDF
1240LU22R0007 RFP.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SLIP N SLIDE DAMS DECOMMISSIONING AND RESTORATION

SCHEDULE OF ITEMS

April 12, 2022 Construction Documents Submittal

Project

Custer Gallatin National Forest Gardiner Ranger District U.S. Forest Service

(YEAR 1) BASE BID:

Item No.

Description Method of

Measure

Est.

Quantity

Unit Unit Price

Total Amount

15101 Mobilization and Demobilization

LSQ 1 LS $ $

15102 Access Road Improvements LSQ 1 LS $ $

15201 Construction Survey and Staking

LSQ 1 LS $ $

20101 Clearing and Grubbing of Upper Pond

CQ 8,434 SY $ $

20102 Clearing and Grubbing of Middle Pond

CQ 869 SY $ $

20103 Clearing and Grubbing of Lower Pond

CQ 1,833 SY $ $

20104 Clearing and Grubbing Between Middle and Lower Ponds

CQ 1,095 SY $ $

20301

Removal and Disposal of Existing Outlet Structures/Pipes/Valves and Selected Irrigation Equipment

LSQ 1 LS $ $

20401 Dam Removal Excavation at Upper Pond CQ 23,043 CY $ $

20402 Dam Removal Excavation at Middle Pond

CQ 3,065 CY $ $

20403 Dam Removal Excavation at Lower Pond

CQ 6,437 CY $ $

20404 Stream Restoration Excavation

- Between Middle Pond and Lower Pond

CQ 50 CY $ $

20421 Select Soil Borrow for Upper Pond Wetlands Restoration CQ 9,875 CY $ $

20422 Select Soil Borrow for Middle Pond Wetlands Restoration CQ 1,902 CY $ $

20423 Select Soil Borrow for Lower Pond Wetlands Restoration CQ 1,190 CY $ $

20424 Select Soil Borrow for Embankments Between Middle Pond and Lower Pond

CQ 8,544 CY $ $

20425 Select Soil Borrow for Embankments Downstream of Lower Pond

CQ 10,084 CY $ $

21101 Roadway Obliteration and Salvage Gravel LSQ 1 LS $ $

25101 Placed Riprap Class 4 (100% On-Site Salvage Rock) CQ 722 CY $ $

25102 Placed Riprap Class 6 (100% Import) CQ 186 CY $ $

25103

6-Inch-Minus Pitrun Gravel for Upper Pond Outlet and Riprap Class 6 Bedding (100% Import)

CQ 512 CY $ $

25104 Salvage Rock for Additional Upper Pond Outlet Armor CQ 40 CY $ $

62401 Topsoil Stripping, Stockpiling, and Replacement – Upper Pond CQ 1,235 CY $ $

62402 Topsoil Stripping, Stockpiling, and Replacement – Middle Pond

CQ 313 CY $ $

62403 Topsoil Stripping, Stockpiling, and Replacement – Between Middle and Lower Pond

CQ 515 CY $ $

62404 Topsoil Stripping, Stockpiling, and Replacement – Lower Pond CQ 311 CY $ $

62801 Noxious Weed Containment and Eradication - Primary Treatment

LSQ 1 LS $ $

63001 Control of Water

LSQ 1 LS $ $

Option 1 (Year 1) Base Bid Total: $

OPTION 1 (YEAR 2) BASE BID:

Item No.

Description Method of

Measure

Est.

Quantity

Unit Unit Price

Total Amount

15101 Mobilization and Demobilization

LSQ 1 LS $ $

62501 Upland and Wetland Seed Mixes, USFS Coeur D’Alene Nursery

LSQ 1 LS $ $

62502 Apply Fertilizer and Seed Mix, Broadcast Method - Zone 1 Wetland Mix

CQ 0.2 AC $ $

62503 Apply Fertilizer and Seed Mix, Broadcast Method – Zones 2-4 Upland Seed Mix

CQ 11.8 AC $ $

62601 Nursery Stock Trees and Planting LSQ 1 LS $ $

62602 Temporary Wildlife Fencing for Planted Areas CQ 11,720 LF

62701 Wetland Sod Salvaging, Cutting, and Placing AQ 4,397 SY $ $

62801 Noxious Weed Containment and Eradication - Spot Treatment

LSQ 1 LS $ $

62901 Coir Mat for 2H:1V Fill Slopes CQ 3200 SY $ $

63101 Install Beaver Dam Analogs

LSQ 1 LS $ $

Option 2 (Year 2) Base Bid Total: $

CQ = Contract Quantity; AQ = Actual Quantity; LSQ = Lump Sum Quantity

TOTAL BASE BID, OPTION 1 (YEAR 1):

AND /100 DOLLARS ($ ).

TOTAL BASE BID, OPTION 2 (YEAR 2):

AND /100 DOLLARS ($ ).

GRAND TOTAL BASE BID, OPTION 1 PLUS OPTION 2:

AND /100 DOLLARS ($ ).

Note: Guidance regarding how a given pay unit is measured and/or paid is found within the Standard Specifications FP-14, Section 109.02 Measurement Terms and Definitions for each given unit and within the specific specifications for the Item described.

File details come from the government source that posted it. Updated .