22R0007 A00003.pdf

PDF 750 KB Posted

Attached to
Slip & Slide Dam Decommissioning & Restoration. Custer Gallatin NF
Solicitation number
1240LU22R0007
Issued by

About this file

This document contains questions and answers related to a federal solicitation for the Slip & Slide Dam Decommissioning & Restoration project with the USDA Forest Service. The solicitation involves decommissioning three dams and restoring the Slip N Slide drainage area to a native wetland habitat. The project will be conducted in two phases over two years, with both phases potentially being awarded in the first year depending on available funding. Phase one includes all earthwork and rockwork such as salvage, delivery and placement, as well as primary herbicide treatment. Phase two covers the remaining restoration work items and follow-up herbicide spot treatment. The document provides additional details on tree and plant quantities to be installed, size parameters for various plant materials, warranty requirements, and clarification on excavation quantities versus what is shown in amended contract documents.

View the file

Other files

File Type Posted
Updated FSSS_Construction_.pdf PDF
Updated Schedule of Items.pdf PDF
Updated Construction Plan Set.pdf PDF
22R0007 A00002.pdf PDF
22R0007 A00001.pdf PDF
DB WD.pdf PDF
SlipnSlide100centFinalDesignPackage.pdf PDF
1240LU22R0007 RFP.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1. CONTRACT ID

PAGE OF PAGES CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1

I

2. AMENDMENT/MODIFICATION NO. 13.EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 15. PROJECT NUMBER (if applicable) A00003 Same as block 16C 1055941

6. ISSUED BY: CODE: 7. ADMINISTERED BY (If other than 6.): CODE:

Contracting Officer USDA, lntermountain Zone, CSA 9

3232 W. Nursery Rd Coeur D'Alene, ID 83815 Raymond Gar1eb 619 520 3187 Raymond.garleb@usda.gov

8. NAME AND ADDRESS OF CONTRACTOR 9A. AMENDMENT OF SOLICITATION NUMBER

X 1240LU22R0007

9B. DATED (see item 11) 08/2212022

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

CODE I FACILITY

10B. DATED (see item 13)

11. THIS ITEM APPLIES ONLY TO AMENDMENTS OF SOLICITATIONS

[x] The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers [] is extended, [x] is not extended. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing Items 8 and 15, and returning _ 1 _ copy(s) of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c} By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amend-ment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received orior to the opening hour and date specified.-

12. ACCOUNTING AND APPROPRIATION DATA (if applicable)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

[] A. THIS CHANGE ORDER IS PURSUANT TO: (specify authority)

[] B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in oavina office, aoorooriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

[] C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF: FAR Part 13

[] D. OTHER (specify type of modification and authority)

E. Contractor [] ~. [] is not required to siqn this document and return oriainal copy(s) to the issuinq office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, includino solicitation/contract subiect matter where feasible).

The purpose of this Amendment is to publish Asked and Answered RFI questions. Please see attached sheet of questions and answers.

Questions will not be accepted after the 10th of September 2022. Please see attached documents. There will be three (3) attachments, they will start with the word " UPDATED". The Bid opening date remains Sep 19th @ 12:00PM PT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 1 0A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or prin~ 16A. NAME ANO TITLE OF CONTRACTING OFFICER (Type or prin~

Raymond Garleb, Contracting Officer

158. CONTRACTOR/OFFEROR 15C. DATE SIGNED

16:/Nk~ -~T~~ES ~ ;JER~A~

16C. DATE SIGNED

7-1~ i:t (Sianature of authorized person) ~ ianature of Contractina Officer)

Q. Bid item 62601 Nursery Stock Trees & Planting - Could the government provide a list of total plant quantities (aspen, cottonwood, willows) to be placed on the project?

A. Refer to Sheet 11 Detail 14 regarding the number of trees to be planted per area. Estimated totals:

Quaking Aspens: 1853 Cottonwoods: 1494 Willows: 718 Total: 4065 trees

Q. Please note that the published plan set and schedule of items, including dam excavation quantities, is different than the quantities shown on 9/7 /22 Amendment. Could you clarify.

A. Please see attached updated contract documents.

Q. What size parameters are you looking for on the willows, cottonwoods and aspens. Is there a certain height or caliper you are looking for? Is there a certain amount of the root ball or container size you are looking for on the salvaged woody plants?

A. Tree farm seedling stock with minimum of 1-inch diameters ranging from 4 to 5 feet tall.

Q. What is the warranty on the salvaged plant material, if any? There will be a certain amount of die off and even though the plants are fenced in, the animals will probably still be able to get in there somehow. You just don't know the amount of die off you will get. Is the contractor responsible for replacing any dead material? Can there be an allowance added to the bid schedule for any dead material?

A. Forest Service expects a minimum 70% survival rate. The contractor is responsible for replacing dead material. No allowance may be added to the bid for dead plant material.