This is a Solicitation, Offer, and Award document (Standard Form 1442) for a commercial construction project issued by the USDA Forest Service.
The solicitation solicits pricing for replacement of three roofing systems plus one optional roofing system for the Bitterroot National Forest in Montana. The work includes removal and disposal of existing roofing systems, inspection of roof decking, installation of underlayment and flashing, installation of new roofing materials, installation of ridge caps and closures, weatherproofing around penetrations, and final cleanup. Specific projects include: Stevensville Garage Shop (asphalt shingles replacement with architectural shingles), WF Bunkhouse (metal roofing replacement with standing seam and cupola), WF Laundry Facility (metal roofing replacement with standing seam), and optional Darby Visitor Center (cedar shingles for historic building). The contractor must commence work within 10 calendar days of notice to proceed and complete all work within 45 calendar days. The notice to proceed will be issued after April 15, 2027. Quotations are due December 4, 2026, at 1700 hours Mountain Time and must be submitted to PPS.Proposals@usda.gov. One firm-fixed-price award is anticipated. The government will evaluate quotations using lowest price technically acceptable criteria, considering price, technical acceptability, and past performance. Offerors must submit pricing for all base and option items to be considered responsive. Technical proposals must include detailed explanations of construction capabilities, key personnel qualifications with contingent letters, and identification of any PWS requirements that cannot be accomplished. A 90-calendar-day offer acceptance period applies. Applicable clauses include construction wage rate requirements, buy American construction materials, payment by electronic funds transfer, and warranty of construction provisions.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLICITATION, OFFER,
AND AWARD
2. TYPE OF SOLICITATION
6. PROJECT NO. 4. CONTRACT NO. 5. REQUISITION/PURCHASE REQUEST NO.
PAGE OF PAGES
7. ISSUED BY CODE 8. ADDRESS OFFER TO
SOLICITATION
(Construction, Alteration, or Repair)
1. SOLICITATION NO. 3. DATE ISSUED
IMPORTANT -- The "offer" section on the reverse must be fully completed by offeror.
9.
INFORMATION CALL
a. NAME b. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder."
FOR
SEALED BID (IFB)
NEGOTIATED (RFP)
1166737
USDA-FS CSA INTERMOUNTAIN 8
324 25TH ST
OGDEN UT 84401-2310
40LT
PPS.Proposals@usda.gov
MARY BOSCH 802-345-9284
111/18/2026
1240LT27Q0015
INVITATION FOR BID
REQUEST FOR PROPOSAL
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date)
1240LT27Q0015 and all attachments:
Attachment 1 FS-Schedule of Items Template BRF FY26 Roofing Projects 20260629
Attachment 2 Statement of Work BRF FY26 Roofing Project 20260628
Attachment 3 Project Manual for BRF FY26 Roofing Projects
Attachment 4 Stevi Garage Shop Drawings
Attachment 5 West Fork Crew Quarters Blueprints
Attachment 6 General Decision Number MT20260060 05-18-2026 Ravalli MT
11. The Contractor shall begin performance within
12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
award, notice to proceed. The performance period is mandatory negotiable. (See ________________________________________________.)
13. ADDITIONAL SOLICITATION REQUIREMENTS:
a. Sealed offers in original and is not required.is, b. An offer guarantee
c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
d. Offers providing less than
12b. CALENDAR DAYSYES NO
(If "YES", indicate within how many calendar days after award in Item 12b.)
10 45 calendar days and complete it within ________________ ________________ calendar days after receiving
____12/04/2026
NSN 7540-01-155-3212
x x x x copies to perform the work required are due at the place specified in Item 8 by _____________ ___________________ (hour) local time calendar days for Government acceptance after the date offers are due will not be considered and will be rejected . _________________
STANDARD FORM 1442 (Rev. 12/2022)
Prescribed by GSA
FAR(48 CFR) 53.236-1(d)
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within ____________________ calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in item 13d. Failure to insert any number means the offeror accepts the minimum in item 13d.)
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NO. (Include area code)
16. REMITTANCE ADDRESS (Include only if different than item 14.)
CODE FACILITY CODE
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGEMENT OF AMENDMENTS
OFFER (Must be fully completed by offeror)
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE.
20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print) 20b. SIGNATURE 20c. OFFER DATE
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO THE UNITED STATES CODE AT
26. ADMINISTERED BY CODE 27. PAYMENT WILL BE MADE BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this document solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.
30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print) 31a. NAME OF CONTRACTING OFFICER (Type or print)
30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. DATE
BY
2PAGE OF
USDA-FS CSA INTERMOUNTAIN 8
324 25TH ST
OGDEN UT 84401-2310
40LT
VERONICA L. BECK
28. NEGOTIATED AGREEMENT 29. AWARD
and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations,certifications, and specifications incorporated by reference in or attached to this contract.
copies to issuing office.) Contractor agrees to furnish
10 U.S.C. 3204(a) 41 U.S.C. 3304(a)
STANDARD FORM 1442 (REV. 12/2022) BACK
Continued...
and return
(Contractor is not required to sign this document.) Your offer on this
ITEM NO.
(A)
SUPPLIES/SERVICES
(B)
QUANTITY
(C)
UNIT
(D)
UNIT PRICE
(E)
AMOUNT
(F)
NAME OF OFFEROR OR CONTRACTOR
3 3
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
1240LT27Q0015
0001 BRF FY26 Quarters GAOA BRF Roofing Project
Bitterroot National Forest
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
GAOA BRF Roof Project
Bitterroot NF
1240LT27Q0015
pg. 4
Statement of Requirement This requirement consists of replacement of 3 roofs plus one Option Item roof for the Bitterroot National Forest. See locations below.
The work includes:
1) Removal and disposal of existing roofing system and associated fasteners, underlayment, applicable trim, flashing, and drip edge.
2) Inspection of roof decking and identification of damaged decking
3) Installation of underlayment, moisture barriers, flashing, and trim components.
4) Installation of new roofing meeting performance criteria outlines in this SOW,
5) Installation of replacement ridge caps, closures, and sealants,
6) Ensuring proper weatherproofing around penetrations, vents, and mechanical equipment
7) Final cleanup and disposal of all construction debris.
The roofing systems to be replaced are as follows:
Stevensville Garage Shop: Asphalt Shingles (existing 3-Tab shingles, new architectural shingles)
WF Bunkhouse: Metal Roofing (existing “delta rib”, new standing seam), includes cupola
WF Laundry Facility: Metal Roofing (existing “delta rib”, new standing seam)
Optional Item – Darby Visitor Center: Cedar shingles (Historic Building)
• See Attachment 2 Statement of Work BRF FY26 Roofing Project 20260628 and
Attachment 3 Project Manual for BRF FY26 Roofing Projects
Schedule of Items
See Attachment 1 FS-Schedule of Items BRF FY26 Roofing Projects 20260629
Technical Data -
Technical data and supporting documentation associated with this solicitation are available through the following sources:
2. Solicitation Attachments
The following documents are included as attachments to this solicitation and can be accessed via the “Attachments/Links” section of the posting.
• Attachment 1 FS-Schedule of Items Template BRF FY26 Roofing Projects 20260629
• Attachment 2 Statement of Work BRF FY26 Roofing Project 20260628
• Attachment 3 Project Manual for BRF FY26 Roofing Projects
• Attachment 4 Stevi Garage Shop Drawings
• Attachment 5 West Fork Crew Quarters Blueprints
• Attachment 6 General Decision Number MT20260060 05-18-2026 Ravalli MT
1240LT27Q0015
pg. 5
Project Location
Project locations are listed in:
Attachment 2 Statement of Work BRF FY26 Roofing Project 20260628
Definitization of Equitable Adjustments for Change Orders
Pursuant to FAR 36.101-4(b), information regarding USDA’s definitization of equitable adjustments for change orders under construction contracts may be found at Contracting with USDA under
“Federal Acquisition Regulation 36.101-4”. USDA’s procedures that apply to the definitization of equitable adjustments for change orders under construction contracts may be found in AGAR
443.304 -70.
Federal Acquisition Regulation (FAR) and United States Department of Agriculture
Acquisition Regulation (AGAR) Clauses and Provisions
The clauses and provisions contained herein are applicable to any order awarded as a result of this solicitation. The terms and conditions set forth herein supersede all other terms and conditions.
Acceptance of the order in accordance with (IAW) FAR 12.201-1(b)(2) constitutes acceptance of all terms and conditions contained herein.
As part of the Revolutionary FAR Overhaul (RFO), system updates may lag policy updates. The
System for Award Management (SAM) may continue to require entities to complete representations based on provisions that are not included in this solicitation. Contracting officers will rely on representations from offers based on provisions in the solicitation. Entities are not required to, nor are they able to, update their entity registration to remove these representations in SAM.
52.252-2 Clauses Incorporated by Reference Feb 1998
This solicitation incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also the full text of the clause may be accessed electronically at Internet address https://www.acquisition.gov/far-overhaul/far-part-deviation-guide/far-overhaul-part-52
52.212-4 Terms and Conditions—Commercial Products and Commercial Services (Nov 2025)
☐ Alternate I (Nov 2025) of 52.212-4
This is a commercial construction acquisition. FAR 52.212-4 is amended as follows:
(b) Inspection/Acceptance. Inspection and Acceptance will be conducted in accordance with FAR 52.246-12, Inspection of Construction (Aug 1996).
(d) Changes. Changes will be handled in accordance with the following FAR clause(s):
☐ FAR 52.243-4, Changes (Nov 2025)
☒ FAR 52.243-5, Changes and Changed Conditions (Nov 2025) https://www.usda.gov/about-usda/general-information/staff-offices/departmental-administration/office-contracting-and-procurement-ocp/policies-regulations https://www.acquisition.gov/far-overhaul/far-part-deviation-guide/far-overhaul-part-52
1240LT27Q0015
pg. 6
(o) Warranty. FAR 52.246-21, Warranty of Construction is applicable to this contract.
52.203-17 Contractor Employee Whistleblower Rights (Nov 2023)
52.203-19 Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements
(Jan 2017)
52.222-50 Combating Trafficking in Persons (Nov 2025)
☐ Alternate I (Nov 2025) of 52.222-50
52.226-8 Encouraging Contractor Policies to Ban Text Messaging While Driving (May 2024)
52.232-39 Unenforceability of Unauthorized Obligations (Jun 2013)
52.232-40 Providing Accelerated Payments to Small Business Subcontractors (Mar 2023)
52.233-3 Protest After Award (Sep 2025)
52.233-4 Applicable Law for Breach of Contract Claim (Sep 2025)
52.240-91 Security Prohibitions and Exclusions (Nov 2025)
☐ Alternate I (Nov 2025) of 52.240-91
52.244-6 Subcontracts for Commercial Products and Commercial Services (Nov 2025)
The following clauses are applicable if checked:
☐ 52.203-6 Restrictions on Subcontractor Sales to the Government (Jun 2020) with Alternate I
(Nov 2021) of 52.203-6
☐ 52.203-13 Contractor Code of Business Ethics and Conduct (Nov 2021)
☒ 52.204-9 Personal Identity Verification of Contractor Personnel Jan 2011
☒ 52.204-13 System for Award Management—Maintenance (Nov 2025)
☐ 52.204-91 Contractor identification (Nov 2025)
☒ 52.209-6 Protecting the Government’s Interest When Subcontracting with
Contractors Debarred, Suspended, or Proposed for Debarment (Sep 2025)
☐ 52.209-9 Updates of Publicly Available Information Regarding Responsibility
Matters (Sep 2025)
☒ 52.209-10 Prohibition on Contracting with Inverted Domestic Corporations (Sep 2025)
☐ 52.219-4 Notice of Price Evaluation Preference for HUBZone Small Business Concerns (Nov
2025)
☒ 52.219-6 Notice of Total Small Business Aside (Nov 2025)
☐ Alternate I (Mar 2020).
☐ 52.219-8 Utilization of Small Business Concerns (Nov 2025)
☐ 52.219-9 Small Business Subcontracting Plan (Nov 2025)
☐ Alternate III (Nov 2025) of 52.219-9.
☐ Alternate IV (Nov 2025) of 52.219-9
☐ 52.219-14 Limitations on Subcontracting (Nov 2025)
☐ 52.219-16 Liquidated Damages—Subcontracting Plan (Nov 2025)
☐ 52.219-33 Nonmanufacturer Rule (Nov 2025)
☒ 52.222-3 Convict Labor (June 2003)
☐ 52.222-19 Child Labor—Cooperation with Authorities and Remedies (Nov 2025)
1240LT27Q0015
pg. 7
☐ 52.222-35 Equal Opportunity for Veterans (Nov 2025)
☐ Alternate I (Jul 2014) of 52.222-35
☒ 52.222-36 Equal Opportunity for Workers with Disabilities (Nov 2025)
☐ Alternate I (Jul 2014) of 52.222-36
☐ 52.222-37 Employment Reports on Veterans (Nov 2025)
☐ 52.222-40 Notification of Employee Rights Under the National Labor Relations Act (Dec 2010)
☐ 52.222-41 Service Contract Labor Standards (Aug 2018)
☐ 52.222-42 Statement of Equivalent Rates for Federal Hires (May 2014)
This Statement is for Information Only:
It is not a Wage Determination
Employee Class Monetary Wage -- Fringe Benefits
☐ 52.222-43 Fair Labor Standards Act and Service Contract Labor Standards -- Price Adjustment
(Multiple Year and Option Contracts) (Aug 2018)
☐ 52.222-44 Fair Labor Standards Act and Service Contract Labor Standards -- Price Adjustment
(May 2014)
☐ 52.222-51 Exemption from Application of the Service Contract Labor Standards to Contracts for
Maintenance, Calibration, or Repair of Certain Equipment-Requirements (May 2014)
☐ 52.222-53 Exemption from Application of the Service Contract Labor Standards to Contracts for
Certain Services-Requirements (Nov 2025)
☐ 52.222-54 Employment Eligibility Verification (Nov 2025)
☒ 52.222-62 Paid Sick Leave Under Executive Order 13706 (Jan 2022)
☒ 52.222-90 Addressing DEI Discrimination by Federal Contractors (Apr 2026)
☐ 52.223-2 Reporting of Biobased Products Under Service and Construction Contracts (Nov
2025)
☐ 52.223-9 Estimate of Percentage of Recovered Material Content for EPA-Designated Items
(May 2008)
☐ Alternate I (May 2008) of 52.223-9
☐ 52.223-11 Ozone-Depleting Substances and High Global Warming Potential
Hydrofluorocarbons (Nov 2025)
☐ 52.223-12 Maintenance, Service, Repair, or Disposal of Refrigeration Equipment and Air
Conditioners (Nov 2025)
☒ 52.223-23 Sustainable Products and Services (Nov 2025)
☐ 52.224-3 Privacy Training (Jan 2017)
☐ Alternate I (Jan 2017) of 52.224-3
☐ 52.225-1 Buy American-Supplies (Nov 2025)
☐ Alternate I (Oct 2022) of 52.225-1
☐ 52.225-3 Buy American--Free Trade Agreements--Israeli Trade Act (Nov 2025)
1240LT27Q0015
pg. 8
☐ Alternate II (Nov 2025) of 52.225-3.
☐ Alternate III (Nov 2025) of 52.225-3.
☐ Alternate IV (Oct 2022) of 52.225-3
☐ 52.225-5 Trade Agreements (Nov 2023)
☐ 52.225-19 Contractor Personnel in a Designated Operational Area or Supporting a Diplomatic or Consular Mission outside the United States (May 2020)
☐ 52.225-26 Contractors Performing Private Security Functions Outside the United States (Oct
2016)
☐ 52.226-4 Notice of Disaster or Emergency Area Set-Aside (Nov 2007)
☐ 52.226-5 Restrictions on Subcontracting Outside Disaster or Emergency Area (Aug 2025)
☐ 52.229-12 Tax on Certain Foreign Procurements
☒ 52.232-18 Availability of Funds (April 1984)
☐ 52.232-29 Terms for Financing of Purchases of Commercial Products and Commercial Services
☐ 52.232-30 Installment Payments for Commercial Products and Commercial Services
(Nov 2021)
☒ 52.232-33 Payment by Electronic Funds Transfer— System for Award Management (Oct 2018)
☐ 52.232-34 Payment by Electronic Funds Transfer—Other Than System for Award Management
(Jul 2013)
☐ 52.232-36 Payment by Third Party (Nov 2025)
☐ 52.240-92 Security Requirements (Nov 2025)
☐ Alternate II (Nov 2025) of 52.240-92
☐ 52.240-93 Basic Safeguarding of Covered Contractor Information Systems (Nov 2025)
☐ 52.242-13 Bankruptcy (July 1995)
☒ 52.246-21 Warranty of Construction (Mar 1994)
☐ 52.247-64 Preference for Privately Owned U.S.-Flag Commercial Vessels (Nov 2025)
☐ Alternate I (Apr 2023) of 52.247-64.
☐ Alternate II (Nov 2021) of 52.247-64
The Contractor shall comply with the following FAR Clauses for Commercial Construction.
52.222-6 Construction Wage Rate Requirements (Nov 2025)
52.222-7 Withholding of Funds (Nov 2025)
52.222-8 Payrolls and Basic Records (Nov 2025)
52.222-9 Apprentices and Trainees (Nov 2025)
52.222-10 Compliance with Copeland Act Requirements (Nov 2025)
52.222-11 Subcontracts (Labor Standards) (Nov 2025)
52.222-12 Contract Termination-Debarment (May 2014)
52.222-13 Compliance with Construction Wage Rate Requirements and Related Regulations.
(May 2014)
52.222-14 Disputes Concerning Labor Standards (Nov 2025)
1240LT27Q0015
pg. 9
52.222-15 Certificate of Eligibility (May 2014)
52.236-5 Material and Workmanship (Jul 2025)
The following clauses are applicable when checked:
☐ 52.222-30 Construction Wage Rate Requirements-Price Adjustment (None or Separately
Specified Pricing Method (Aug 2018)
☐ 52.222-31 Construction Wage Rate Requirements-Price Adjustment (Percentage Method) (Aug
2018)
☐ 52.222-32 Construction Wage Rate Requirements-Price Adjustment (Actual Method) (Nov
2025)
☒ 52.225-9 Buy American-Construction Materials (Nov 2025)
☐ Alternate I (Oct 2022) of 52.25-9
☐ 52.225-11 Notice of Buy American Requirement-Construction Materials under Trade
Agreements (Nov 2025)
☐ Alternate I (Nov 2025) (of 52.225-11
☐ Alternate II (Oct 2022) of 52.225-11
☐ 52.228-2 Additional Bond Security (Oct 1997)
☐ 52.228-5 Insurance-Work on Government Installation (Jan 1997)
☐ 52.228-11 Individual Surety-Pledge of Assets (Feb 2021)
☐ 52.228-13 Alternative Payment Protections (Jul 2020)
☐ 52.228-14 Irrevocable Letter of Credit (Nov 2014)
☐ 52.228-15 Performance and Payment Bonds-Construction (Jun 2020)
☐ 52.228-17 Individual Surety-Pledge of Assets (Bid Guarantee) (Feb 2021)
☒ 52.236-2 Differing Site Conditions (Jul 2025)
☒ 52.236-3 Site Investigation and Conditions Affecting the Work (Jul 2025)
☒ 52.236-6 Superintendent by the Contractor (Jul 2025)
☒ 52.236-7 Permits and Responsibilities (Jul 2025)
☒ 52.236-8 Other Contracts (Jul 2025)
☒ 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and
Improvements (Jul 2025)
☒ 52.236-10 Operations and Storage Areas (Jul 2025)
☒ 52.236-11 Use and Possession Prior to Completion (Jul 2025)
☒ 52.236-12 Cleaning Up (Jul 2025)
☒ 52.236-13 Accident Prevention (Jul 2025)
☐ Alternate I (Nov 1991) of 52.236-13
☒ 52.236-14 Availability and Use of Utility Services (Jul 2025)
☐ 52.236-15 Schedules for Construction Contracts (Jul 2025)
☐ 52.236-16 Quantity Surveys (Jul 2025)
☐ Alternate I (Apr 1984) of 52.236-16
☒ 52.236-17 Layout of Work (Jul 2025)
1240LT27Q0015
pg. 10
☒ 52.236-21 Specifications and Drawings for Construction (Jul 2025)
☐ Alternate I (Apr 1984) of 52.236-21
☐ Alternate II (Apr 1984) of 52.236-21
☒ 52.242-14 Suspension of Work (Apr 1984)
☐ 52.248-3 Value Engineering (Oct 2025)
☐ Alternate I (Apr 1984) of 52.248-3
Other Applicable Clauses
52.232-90 Fast Payment Procedures (Nov 2025)
AGAR Clauses
This solicitation incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of the clause may be accessed electronically at Internet address https://www.usda.gov/guidance-documents/acquisition-policy/ocp/usda-agar30-sept-26pdf
AGAR 452.203-70 Unenforceable Supplier Terms (Sep 2026)
AGAR 452.204–70 Modification for Contract Closeout (Apr 2026)
AGAR 452.204‑71 Personal Identity Verification and Workforce Integrity of Contractor
Employees (Apr 2026)
AGAR 452.232-71 Progress Payments for Commercial Construction Contracts (May 2026)
AGAR 452.236-70 Electronic Submission of Payment Requests (Sep 2026)
Solicitation Information
Award Type
It is anticipated that a Firm-Fixed-Price Purchase Order will be awarded as a result of a base item plus one Option Item will be awarded as a result of this synopsis/solicitation.
The Government intends to make one award from this solicitation. Therefore, to be considered responsive, contractors must submit pricing for all items.
Period of Performance
The Contractor is required to commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed and the entire work ready for use not later than 45 calendar days after notice to proceed. The time stated for completion shall include final cleanup of the premises.
https://www.usda.gov/guidance-documents/acquisition-policy/ocp/usda-agar30-sept-26pdf
1240LT27Q0015
pg. 11
The notice to proceed will be issued after April 15, 2027.
Organized Site Visit
A Site visit has not been scheduled. Contractors are encouraged to visit the sites to ensure they have a thorough knowledge of the work required.
Evaluation and Basis for Award
Evaluation-Commercial Items
The provision at Federal Acquisition Regulation (FAR) 52.212-2 Evaluation of Commercial Items is not applicable to this solicitation. In lieu of this provision, quotes will be evaluated in accordance with FAR 12.203 based on the criteria listed below. Award will be made to the offeror representing the best value to the Government.
Price:
Any quantity price discounts and discounts for prompt payment should be included in this section.
The offeror shall provide pricing as requested in the attached spreadsheet titled “Attachment 1 FS-
Schedule of Items Template BRF FY26 Roofing Projects 20260629. Total price evaluation will be for the base items, and option item. Failure to propose pricing for the base items and option item on individual line items may result in a quotation being excluded from further consideration. The offeror’s quotation will be evaluated in accordance with FAR 12.204, to determine if it is fair and reasonable.
Technical Acceptability:
Technical Acceptability will be evaluated to receive an overall rating of "acceptable" or
"unacceptable." This will be based on the offeror's ability to provide a sound and compliant approach that meets all requirements and shows a thorough understanding of them. It is the contractor's responsibility to ensure their quotation clearly demonstrates their capability to meet these requirements. All offerors must provide the following minimum information and documentation with their quotations to be considered responsive and have their offers evaluated:
• Detailed explanation of the offeror’s ability to perform the required Construction work. A simple statement of capabilities will not suffice. The offeror must address how they will accomplish the requirements of Scope of the Work.
• Detailed explanation of any requirement listed in the PWS that cannot be successfully accomplished by the offeror. Offerors are advised that the USDA intends to award without discussions so any exceptions may cause the quotation to be found technically unacceptable.
1240LT27Q0015
pg. 12
• Provide background information for proposed key personnel in the proposal. The Project
Manager is the only key personnel for the services being performed. The key personnel information shall, at a minimum, demonstrate that the individual meets the educational and experience qualifications to perform the work. For all personnel proposed to be hired and/or permanently relocated, include a signed contingent letter by that person indicating willingness to be hired/relocated if the contract is awarded to the offeror.
• If the offeror is unable to obtain contingent letters from key personnel, the offeror shall submit a written statement to this effect and detail their efforts to obtain contingent letters. In lieu of contingent letters, the offeror can submit a staffing plan, which shall include proof of the Contractor’s demonstrated ability to handle personnel issues, hire and maintain a highly qualified staff to fill immediate requirements, and provide staff with all the necessary support and oversight. The staffing plan shall also include a recruitment and selection process for all staff under this project.
Past Performance:
The Government may utilize any references provided by the Contractor, along with information available from past contracts/orders with the USDA and any information found using sources such as Federal Government sources or the Contractor Performance Assessment Reporting System
(CPARS) to determine if the Contractor has acceptable or neutral Past Performance. Past
Performance will be evaluated using the following rating system:
• Acceptable: The contractor shows a demonstrated ability to meet contract requirements in prior or current contracts, including quality of work, timeliness, cost control, business relations, and adherence to contract terms.
• Neutral: Offeror does not have a past performance record.
• Unacceptable: The contractor has a documented history of failing to meet contract requirements, including poor quality, missed deadlines, cost overruns, lack of responsiveness, or unethical behavior.
Evaluation Method
The Government will evaluate quotations based on the lowest price technically acceptable criteria.
Only the lowest priced offer will be evaluated for Technical Acceptability. Should the lowest priced offer not receive an acceptable technical or past performance rating, the process will continue in order of lowest priced offer until the lowest price, technically acceptable offer with acceptable or neutral past performance is identified.
52.252-1 Solicitation Provisions Incorporated by Reference Feb 1998
This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision
1240LT27Q0015
pg. 13 may be accessed electronically at this/these address(es): https://www.acquisition.gov/far-overhaul/far-part-deviation-guide/far-overhaul-part-52
52.212-1 Instructions to Offerors - Commercial Products and Commercial Services (Nov
2025)
FAR 52.212-1 is amended as follows:
Period for acceptance of offers.
The Offeror agrees to hold the prices in its offer firm for 90 calendar days from the date specified for receipt of offers.
Questions
Questions shall be submitted via email to Mary.Bosch@usda.gov and are due no later than
November 27, 2025, at 12:00 PM Mountain Time. This will ensure enough time to respond before the solicitation period ends. Please include the solicitation name and number as the subject line of the email.
Required Proposal Submission Documents:
• Completed, Signed Offer SF1442 (Section A.): Complete block Fill-ins, 14, 15, 16, 17, 19 (if amendments are issued, acknowledgment of all amendments must be submitted in block 19), 20a, 20b, and 20c signed by authorized person to bind firm on SF 1442.
• Price Proposal, Schedule of Items: Must price all Items including Option Item.
• Technical Proposal:
• Technical Approach answering bullet statements in Evaluation-Commercial Items above.
• Past Performance
• The four (4) documents detailed within “Required Proposal Submission Documents” shall be submitted as separate Adobe PDF documents. It is the offeror’s responsibility to ensure delivery of all required documents by the date and time set for receipt of quotes.
52.203-18 Prohibition on Contracting with Entities that Require Certain Internal Confidentiality
Agreements or Statements-Representation (Jan 2017)
52.209-2 Prohibition on Contracting with Inverted Domestic Corporations - Representation
(Sep 2025)
52.209-11 Representation by Corporations Regarding Delinquent Tax Liability or a Felony
Conviction under any Federal Law (Sep 2025)
52.240-90 Security Prohibitions and Exclusions Representations and Certifications (Nov 2025) https://www.acquisition.gov/far-overhaul/far-part-deviation-guide/far-overhaul-part-52 https://www.acquisition.gov/far-overhaul/far-part-deviation-guide/far-overhaul-part-52 mailto:Mary.Bosch@usda.gov
1240LT27Q0015
pg. 14
The following provisions are applicable if checked:
☐ 52.203-11 Certification and Disclosure Regarding Payments to Influence Certain Federal
Transactions (Sep 2024)
☒ 52.204-7 System for Award Management—Registration (Nov 2025)
☐ Alternate I (Nov 2025) to 52.204-7
☐ 52.204-90 Offeror Identification (Nov 2025)
☐ 52.207-6 Solicitation of Offers from Small Business Concerns and Small Business Teaming
Arrangements or Joint Ventures (Multiple-Award Contracts) (Aug 2024)
☐ 52.209-12 Certification Regarding Tax Matters (Oct 2025)
☐ 52.219-2 Equal Low Bids (Nov 2025)
☒ 52.222-5 Construction Wage Requirements, Secondary Site of the Work (Nov 2025)
☐ 52.222-18 Certification Regarding Knowledge of Child Labor for Listed End Products (Feb
2021)
☐ 52.222-48 Exemption from Application of the Service Contract Labor Standards for
Maintenance, Calibration, or Repair of Certain Equipment–Certification (Nov 2025)
☐ 52.222-52 Exemption from Application of the Service Contract Labor Standards for Certain
Services-Certification (Nov 2025)
☐ 52.222-56 Certification Regarding Trafficking in Persons Compliance Plan (Oct 2020)
☐ 52.223-4 Recovered Material Certification (May 2008)
☐ 52.225-2 Buy American Certificate (Oct 2022)
☐ 52.225-4 Buy American-Free Trade Agreements-Israeli Trade Act Certificate (Nov 2025)
☐ 52.225-6 Trade Agreements-Certificate (Feb 2021)
☐ 52.225-10 Notice of Buy American Requirement- Construction Materials (May 2014)
☐ Alternate I (May 2014) of 52.225-10
☐ 52.225-12 Notice of Buy American Requirement-Construction Materials under Trade
Agreements (May 2014)
☐ Alternate I (May 2014) of 52.225-12
☐ Alternate II (Nov 2023) of 52.225-12
☐ 52.226-3 Disaster or Emergency Area Representation (Nov 2007)
☐ 52.228-1 Bid Guarantee (Sep 1996)
☐ 52.229-11 Tax on Certain Foreign Procurements—Notice and Representation (Jul 2025)
Other Applicable FAR Provisions
52.217-5 Evaluation of Options (Nov 2025)
1240LT27Q0015
pg. 15
AGAR Provisions
This solicitation incorporates one or more provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of the clause may be accessed electronically at Internet address
NOTICE FOR FILING AGENCY PROTESTS
United States Department of Agriculture (USDA) Protest Procedures
The United States Department of Agriculture (USDA) is committed to fair, transparent, and efficient acquisitions. Interested parties with concerns about this solicitation are encouraged to seek resolution through the following USDA procedures.
Tier 1: Contracting Officer Concern Resolution
Submission: Interested parties with concerns about either the solicitation or subsequent award should first submit their concern directly to the Contracting Officer, providing sufficient detail to allow the Contracting Officer to understand and assess the issue.
Process: The Contracting Officer will review the concern, seek clarification as needed, and engage with the interested party to attempt prompt resolution.
Review Timeline: The Contracting Officer will make every effort to provide a response or resolution within 10 business days of receiving the concern.
Effect on Award or Performance: Tier 1 engagement is not considered an official notification of filing an agency protest and does not pause solicitation deadlines, delay award decisions, or suspend contract performance.
Next Steps: If the matter cannot be resolved at Tier 1, the interested party may file a written agency protest under Tier 2. USDA encourages all parties to seek resolution with the Contracting Officer before filing an agency protest.
Tier 2: Agency Protest
If concerns cannot be resolved at Tier 1, an interested party may file a written agency protest with either the Contracting Officer or the USDA Independent Review Authority. The decision by the
USDA Independent Review Authority is an alternative to a decision by the Contracting Officer. The
USDA Independent Review Authority will not consider an appeal of the Contracting Officer’s decision on an agency protest.
1240LT27Q0015
pg. 16
The protest must state whether the protester elects review by the Contracting Officer, by the UDSA
Independent Review Authority. If no election is stated, the Contracting Officer will decide the protest.
Required Information: Protests shall include the information set forth in FAR 33.104-4 (a)(3).
Failure to submit the required information may result in a delay or dismissal of the protest.
Submission: Agency protests should be submitted electronically to SPE.inquiry@usda.gov and the
Contracting Officer.
Timeliness: Protests must be filed within the timeframes specified in FAR 33.104.
Effect on Award or Performance: Contract awards or performance will be suspended during the protest period unless justified in writing for urgent and compelling reasons or determined to be in the best interest of the Government.
Review Timeline: USDA strives to resolve agency-level protests within 35 business days of receipt.
Election of Forum: By filing a protest with USDA, the protesters agree not to file a protest on the same matter with the Government Accountability Office (GAO) or any other external forum while the agency protest is pending. If such a protest is filed externally, the USDA agency protest will be dismissed.
Questions: Questions regarding this notice or protest procedures should be directed to the
Contracting Officer identified in this solicitation.
Quotations Due: Quotations are due on the date and time specified on the SF1442. Quotes will be submitted to PPS.Proposals@usda.gov Attn: Mary Bosch and Solicitation No. on the subject line.
mailto:SPE.inquiry@usda.gov mailto:PPS.Proposals@usda.gov