This document is a Schedule of Items for a water and wastewater system repair project at Flamingo Gorge National Recreation Area in the Ashley National Forest, solicited under contract number 1240LT25R0019. The comprehensive schedule details base and optional items for infrastructure improvements, including pipeline installations (HDPE pipes ranging from 1" to 4"), utility boxes, curb valves, hydrants, excavation, and site preparation. The base items include 30 line items covering mobilization, structure removal, pipeline work, utility installations, and site restoration, while 14 optional items provide additional flexibility for potential expanded scope.

The project is funded through the Great American Outdoors Act (GAOA) and involves detailed technical specifications for water system infrastructure repair. The schedule provides precise measurements and quantities for each item, with units ranging from linear feet (LF) to each (EA) and lump sum (LS), indicating a comprehensive approach to infrastructure rehabilitation. The Department of Agriculture Forest Service is the contracting agency, with the work focused on replacing and improving water and wastewater systems in the Flamingo Gorge National Recreation Area of the Ashley National Forest.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SCHEDULE OF ITEMS

GAOA FLAMINGO GORGE NRA WATER AND WASTEWATER SYSTEM REPAIR

ITEM NUMBER
DESCRIPTION
UNIT
METH of MEAS
QTY
PRICE
TOTAL

BASE ITEMS

0001
011900-1
Mobilization
LS
LSQ
1
0002
024102-1
Removal and Disposal of Existing Structures
LS
LSQ
1
0003
033530
Curb and Gutter Repair - 18" Width
LF
DQ
20
0004
033540
Sidewalk Repair - 4" Thick
SF
DQ
150
0005
133405-1
Utility Box - CMP, 48" Dia. w/ PRV
EA
AQ
2
0006
133405-2
Utility Box - CMP, 48" Dia. w/ Air-Vacuum Relief Valve
EA
AQ
1
0007
133405-3
Utility Box - CMP, 48" Dia. w/ Both PRV and Air-Vacuum Relief Valve
EA
AQ
2
0008
133405-4
Utility Box - CMP, 48" Dia. w/ Meter
EA
AQ
1
0009
221100-1
Pipeline - 1" HDPE, 250 PSI with Heat Fusion Joints, Including Trench
LF
DQ
20
0010
221100-2
Pipeline - 1.5" HDPE, 250 PSI with Heat Fusion Joints, Including Trench
LF
DQ
10
0011
221100-3
Pipeline - 3" HDPE, 250 PSI with Heat Fusion Joints, Including Trench
LF
DQ
95
0012
221100-4
Pipeline - 4" HDPE, 250 PSI with Heat Fusion Joints, Including Trench
LF
DQ
7000
0013
221100-5
Pipe Sleeve - 8" PVC
LF
DQ
40
0014
221100-6
Daylight Drain - 1" Screened
LF
DQ
2
0015
221100-7
Daylight Drain - 1.5" Screened
EA
AQ
1
0016
221100-8
Daylight Drain 2” Screened
EA
AQ
1
0017
221102-1
Curb Valve and Box - 1" Poly
EA
AQ
2
0018
221102-2
Curb Valve and Box - 1.5" Poly
EA
AQ
2
0019
221102-3
Curb Valve and Box - 2" Poly
EA
AQ
1
0020
221102-4
Curb Valve and Box - 3" Poly
EA
AQ
1
0021
221102-5
Curb Valve and Box - 4" Poly
EA
AQ
4
0022
221105-1
Hydrant - Type B Post w/ Concrete Pad
EA
AQ
1
0023
221105-2
Hydrant - Frostproof w/ Grate
EA
AQ
1
0024
312000-1
Special Bedding - Imported (Commercial Source)
CY
SQ
50
0025
312000-2
Exploratory Excavation and Backfill
HR
AQ
16
0026
312010-1
Select Borrow
CY
AQ
90
0027
312100-1
Project Site Preparation and Grading
LS
LSQ
1
0028
321200
Hot-Mix Asphalt Pavement Patch
SY
DQ
485
0029
321204
Crushed Aggregate Base Course - Grading E (Commercial Source)
CY
DQ
80
0030
330530-1
Locating System Access Point - Water, Grounded
EA
AQ
10

BASE ITEMS TOTAL

ITEM NUMBER
DESCRIPTION
UNIT
QUANTITY
PRICE
TOTAL

OPTIONAL ITEMS 1

1001
011900-2
Mobilization
LS
LSQ
1
1002
024102-2
Removal and Disposal of Existing Structures
LS
LSQ
1
1003
133405-5
Utility Box - CMP, 48" Dia. w/ PRV
EA
AQ
1
1004
221100-9
Pipeline-1.5’ HDPE 250 PSI with Heat Fusion Joints, Including Trench
LF
DQ
5
1005
221100-11
Pipeline-3” HDPE, 250 PSI with Heat Fusion Joints, Including Trench
LF
DQ
5
1006
22100-12
Pipeline-4” HDPE, 250 PSI with Heat Fusion Joints Including Trench
LF
DQ
935
1007
221100-13
Pipeline- 4” GSP, Schedule 40, Including Trench
LF
DQ
110
1008
221100-14
Daylight Drain- 1.5” Screened
EA
AQ
1
1009
221102-6
Curb Valve and Box- 1.5” Poly
EA
AQ
1
1010
221102-7
Curb Valve and Box- 3” Poly
EA
AQ
1
1011
221102-8
Curb Valve and Box- 4” Poly
EA
AQ
2
1012
312010-2
Select Borrow
CY
AQ
10
1013
312100-2
Project Site Preparation and Grading
LS
LSQ
1
1014
330530-2
Locating System Access Point -Water Grounded
EA
AQ
3

BASE ITEM TOTAL

OPTIONAL ITEMS TOTAL

BASE ITEM AND OPTIONAL ITEMS TOTAL