This document contains a series of 13 questions and answers related to an HVAC system project. Key details include: one superintendent can fulfill supervision, safety, and QAQC roles; contractors are not required to issue contract-specific QA/QC or Safety Plans; the project is not tax exempt. The existing mechanical plans from 2004 are accurate for valve box and bypass valve quantities. There is currently no remote Building Automation System (BAS), and a new 600 VAC - 200A disconnect is not required.
The project involves HVAC system upgrades with specific requirements: all VVT boxes and bypass dampers are operational, though VVT box communication should be verified; the new HVAC system is the only required component for the BAS, with additional equipment integration considered a bonus. No existing As-Built Drawings are available, and alternative HVAC equipment models to Carrier will be accepted if they meet similar specifications. The responses suggest this is a preliminary information gathering document for potential contractors to understand project parameters and conditions.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 1240LT25Q0064 A0001.pdf | ||
| 1240LT25Q0064.pdf | ||
| Attachment 4 Wage Determination.pdf | ||
| Attachment 1 SOI.pdf | ||
| 1240LT25Q0064.pdf | ||
| Attachment 3 Drawings.pdf | ||
| Attachment 2 SOW.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1. In executing this project, can one superintendent fulfill the supervision, safety, and QAQC roles?
Yes
2. Are contractors required to issue a contract specific QA/QC Plan?
No
3. Are contractors required to issue a contract specific Safety Plan?
No
4. Is this project tax exempt?
No
5. Are the 2004 mechanical plan's accurate on valve box and bypass valves quantities?
Yes
6. Is there an existing BAS, if so what platform?
There is currently no remote BAS.
7. Will a new 600 VAC - 200A disconnect be required?
No
8. Are all the VVT boxes operational?
Yes, but verification of operation and communication capability should be verified.
9. Are all the bypass dampers operational?
Yes
10. Is the new HVAC system the only thing required to be on a BAS?
Yes
11. Will any other equipment, or lighting be integrated into the BAS?
Capability to do so would be a bonus, but not required.
12. Can existing As-Built Drawings be provided if available?
They are not available.
13. Would you accept a model other than Carrier with similar Specs?