This document is a solicitation amendment for a federal contract opportunity to replace wildfire-damaged fencing in the Ruby Mountains of Nevada. The purpose of the amendment is to provide details from a pre-proposal site visit, including a roster of attendees, answers to questions, and revised plans that will replace the existing plans.
The project, titled "Wildcat Burned Fence BAR", involves replacing approximately 33 miles of barbwire fence line damaged by the 2022 Wildcat Fire. The project location is accessible from Wells, NV and the total contract value is estimated between $250,000 and $500,000. The period of performance is from July 8, 2024 to November 5, 2024. Proposals are due by June 17, 2024 and should be submitted electronically to the contracting officers. A bid bond may be required for proposals exceeding $150,000.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
1240LT24R0035
x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
40LT
OGDEN UT 84401-2310
324 25TH ST
USDA-FS CSA INTERMOUNTAIN 8
05/30/20240002
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
05/01/2024
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
AMENDMENT 0002 - The purpose of this amendment is to document the site visit, provide a roster of attendees, provide answers to questions asked and attach additional information that will help contractors better prepare their proposals. Revised plans are also attached and will replace existing plans. The offer due date remains 06/17/2024.
AMENDMENT 0001 - The purpose of this amendment is to change the site visit time from 10 AM to 9 AM. The date remains 05/22/2024. Note that access to the site is difficult with standard vehicles. Note from COR: "We would also like to mention that most of the travel way is on highway or well-maintained gravel road ¿ but the last 3 miles are on a dirt road passible with a 4 wheel drive high clearance truck. If interested contractors would like to ride the fence line with an ATV, that would be allowable." No other changes. Offer due date
Continued ...
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
WESTLEY M. BISSON
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
2 11CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
1240LT24R0035/0002
is not extended.
PROJECT NAME: WILDCAT BURNED FENCE BAR
PROJECT DESCRIPTION: The intent of this project is to replace wildfire-impacted barbwire fence line damaged by the 2022 Wildcat Fire in the Ruby
Mountains, Mountain City, Jarbidge Ranger
District.
PROJECT LOCATION: From Wells, NV head north on
US-93 for 40.9 miles. Turn left onto Oneil Basin
Road and continue for 33 miles to reach the wildcat fire. The fence lines to be replaced are on the northwest perimeter of the fire. Total drivetime is about 2 hours and 18 minutes from
Wells, NV.
PRE-PROPOSAL SITE VISIT SCHEDULED? YES, SEE
SECTION L.
SUBMIT PROPOSALS TO WESTLEY.BISSON@USDA.GOV AND
LONNIE.ROOT@USDA.GOV. DO NOT MAIL PROPOSALS. BID
BOND MAY BE SENT WITH PROPOSAL BUT MUST ALSO BE
SENT VIA MAIL PER SECTION L.
Period of Performance: 07/08/2024 to 11/05/2024
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
1240LT24R0035.0002 – WILDCAT BURNED FENCE BAR 05/31/2024
Q: Do contractors need a “bid bond”?
Bid bonds are only required for proposals that exceed $150,000. A payment bond applies between $35,000 and $150,000 and a performance bond applies after $150,000. Bid bonds must be submitted before the offer due date both digitally and via mail per the instructions in Section L.
Q: Are wire gates going next to cattle guards Yes, wire let-down gates will go in next to cattleguards. See amended plans.
Q: Can timeframe be extended?
Yes, this is up to the COR and the needs of the District, but generally we can extend contracts if additional time is justifiably needed to complete the project.
Q: Do posts need to be drilled into rock?
Yes- posts will need to be drilled into rock.
FP14 Section 619.03 (b) (1) states Where solid rock is encountered without overburden, drill line post holes at least 14 inches (350 millimeters) deep. Drill end, corner, gate, and pull posts at least 20 inches (500 millimeters) deep in the solid rock. Make the hole width or diameter at least 1 inch (25 millimeters) greater than the post width or diameter. Cut the post to the required length before installation or drill the hole deep enough to set the post at the required height. Set and plumb the post and fill the hole with grout. Thoroughly work the neat hydraulic cement grout into the hole to eliminate voids. Crown the grout to drain water away from the post.
Where solid rock is covered with soil or loose rock overburden, set posts to the plan depth or to the minimum depth into the solid rock as specified above, whichever is less. When solid rock is encountered before the plan depth, grout the portion of the post in solid rock and backfill the post hole from the solid rock to the top of the ground with concrete.
Page S-1 of the plans state “Proposed wire cribs/ rock jacks are negotiable upon approval of design by COR”
Below is an acceptable wire crib design.
Q: Do braces need to be welded or clamped?
Page S-1 of the plans states “Bracing shall be attached to posts using connections manufactured for this purpose”
If the contractor can show proposed welded or clamped connections are manufactured for attaching braces to posts either method would be acceptable.
Q: Where are the gate locations?
Gates will be located next to each cattle-guard, and across any roads that do not have a cattleguard.
Q: Do caps need to be metal or is plastic suitable?
Plastic is suitable.
Name Company Email Phone Jimmie & Denise Dowton
Jackalope Hydro dowton7@hotmail.com 307-359-8578
Kenny Haworth New Frontier Construction LLC newfrontierfence1@gmail.com 208-254-0307
Pedro Villasena Infinity Fence LLC sales@infinityfencenv.com N/A Tomas Becerra Land I Fence N/A 775-761-6476
SITE VISIT MEETING ROSTER
REVISED
REVISED PLANS 05/30/2024 WITH
CLARIFICATION ON SHEET D1 TO
INSTALL GATE AT ROADS WITH OR
WITHOUT EXISTING CATTLEGUARDS
DRAWN
DESIGNER
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DRAWING SHEET NO.
DATENO.
REVISION / ISSUE
OFSHEET
United States Department of Agriculture Forest Service
5/3 0/2
4 1 3:
A
LU
ST
Y C:
\U
SE
RS
\A
LU
ST
Y\
BO
X\
HT
E
NG
IN
EE
RI
NG
A
CT
IV
E
PR
OJ
EC
TS
\R
MM
CJ
\20
.W
IL
DC
AT
FI
RE
FE
NC
ER
EB
UI
LD
\D
ES
IG
NW
OR
K\
NE
W _W
IL
DC
AT
FE
NC
IN
G.
DW
G;
R4
INTERMOUNTAIN REGION
WILDCAT
BURNED FENCE
REPLACEMENT
(BAR)
HUMBOLDT-TOIYABE
NATIONAL FOREST
RUBY MOUNTAINS, MOUNTAIN CITY,
JARBIDGE DISTRICT
DETAILS: FENCE LINE
LOCATION
11/13/2023
C.DEDMORE
C.DEDMORE
T.JORGENSON
D-1 3 6
NOTES:
- REMOVE EXISTING FENCE LINE
(BURNED AND UNBURNED) ALONG
SHOWN FENCE LINE)
- INSTALL WIRE GATES AT ALL ROADS
CROSSING FENCELINE. IF A
CATTLEGUARD IS PRESENT,
CONSTRUCT GATE NEXT TO THE
CATTLE GUARD
* (ESTIMATED 4 TOTAL GATES)
- RUN AND ANCHOR EACH STRETCH OF
NEW FENCE LINE TO THE NEAREST
UNBURNED BRACE
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
AutoCAD SHX Text E
| 1240LT24R0035 (4).pdf |
| Amend2PreBidQuestionsAnswersWildcat.pdf |
| WildcatRevisedPlans053024.pdf |
| signedCoverPage |
| plans |
| Revised053024b_WildcatFencing-D1.pdf |
| Sheets and Views |
| NEW_WildcatFencing-D1 |
File details come from the government source that posted it. Updated .