Rev2 Drawing Addendum_4.25.24.docx
DOCX document 17 KB Posted
- Solicitation number
- 1240LT24R0028
- Issued by
-
Department of Agriculture Forest Service
About this file
This document is an addendum to the engineering drawing set for the Eleven Mile Canyon Road 96 Bridges and Guardrail Rehabilitation project. The addendum updates the following items: replacing the guardrail standard details with the latest CDOT standard, adjusting the guardrail height to 31 inches to meet new CDOT and FHWA standards, adjusting the wooden block thickness from 8 inches to 12 inches to meet new standards, and including a transition from the new guardrail installation height to marry up with the existing bridge rail elevation.
The related federal contract opportunity is a pre-solicitation for the South Park Eleven Mile Bridge - Railing Rehabilitation project, with a competitive range of $300,000 to $500,000. The scope of work includes the rehabilitation of five road bridges and the installation of approach guardrails. The period of performance is under a strict timeframe of September to October 2024. The pre-solicitation is open from 03/20/24 to 04/04/24, and the solicitation begins on 04/05/24 with bids due by May 3rd, 2024 at 1700 MST. Quotes and proposals will be accepted through email only to the Contracting Officer Representative, Caitlin Woods, once the solicitation is in effect.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Rev2 CDOT_m-606-1-mgs-type3-w-beam-31-in.pdf | ||
| co6 Park County Highway Wage Determination.txt | TXT text file | |
| 02_Supplemental Specs_6.28.23.pdf | ||
| 05_Submittal Register_1.3.24.xlsx | XLSX spreadsheet | |
| Master Solicitation.pdf | ||
| 06_SOI_1.3.24 PDF.pdf | ||
| 07_Davis-Bacon Act WD_CO20240008.pdf | ||
| 04_Fire Control Plan.pdf | ||
| 01_Scope of Work.pdf | ||
| 03_Drawings.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ELEVEN MILE CANYON ROAD 96 BRIDGES AND GUARDRAIL REHABILITATION
ADDENDUM TO THE DRAWINGS - 4/23/24
This addendum to the engineering drawing set updates the following items:
· Replace guardrail standard details with latest CDOT standard M-606-1 dated 03/05/20, as attached.
· Adjust guardrail height to 31” to meet new CDOT and FHWA standards for Midwest Guardrail Systems.
· Adjust wooden block from 8” to 12” thickness to meet new CDOT and FHWA standards for Midwest Guardrail Systems.
· Include transition from new guardrail installation height to marry up with existing bridge rail elevation.
File details come from the government source that posted it. Updated .