This document is a set of Questions and Answers related to the GAOA Building Improvements Creede federal contract opportunity. It addresses several technical questions about the project, including requests for CAD files, clarification on window specifications, electrical requirements, lighting fixtures, and existing building conditions such as insulation, asbestos, and lead-based paint. The key details are:
The contract opportunity is for GAOA Building Improvements in Creede, CO, with the solicitation number 1240LT24Q0013. Questions must be submitted by March 20, 2024. The document provides responses to 20 questions related to the project drawings, specifications, and existing building conditions. Clarifications are provided on window quantities, electrical panel requirements, lighting fixtures, insulation, asbestos, and lead-based paint. The building was constructed in 1939.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 1240LT24Q0013 - A04 - Building Improvements Creede.pdf | ||
| Atch 09 Conduit Photos.zip | ZIP file | |
| Atch 06 Question and Answer Photos.pdf | ||
| Atch 10 Site Visit Photos.zip | ZIP file | |
| 1240LT24Q0013-A03 GAOA Building Improvments Creede.pdf | ||
| Atch 08 CAD Drawings Creede.zip | ZIP file | |
| Atch 07 Site Visit Sign-in.pdf | ||
| Amendment 2 1240LT24Q0013 GAOA Building Improvements Creede.pdf | ||
| 1240LT24Q0013-0001 Site Visit.pdf | ||
| Attachment 3 - GAOA Building Improvements Drawings.pdf | ||
| Attachment 1 - GAOA Building Improvements Creede Schedule of Items.xlsx | XLSX spreadsheet | |
| Attachment 2 - GAOA Building Improvements Creede Specifications.pdf | ||
| Attachment 4 - WD CO20240001 20240105.pdf | ||
| 1240LT24Q0013 GAOA Building Improvements Creede.pdf |
Show all 14
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
QUESTIONS AND ANSWERS
GAOA BUILDING IMPROVEMENTS CREEDE
10 April 2024
1. Dwg Sheet 2 of 12, Project Note 5: Does the government have BIM / CAD files available for this project and if so, would you provide those files?
a. The files are attached as a zip file.
2. Dwg Sheet 4 of 12, “Window No. 6” is not shown in the Window Schedule can you provide the
“#” (quantity), type, and dimensions for this window? Note One (1) “Window No. 6” appears to be shown on Dwg Sheet 7 of 12, “East Elevation”.
a. Window size is 14”H x 21”W (see photo), quantity 1, type casement, non-operable.
3. Dwg Sheet 7 of 12, West Elevation: Should the first-floor window between the doors be considered a “Window No. 2” as shown in the Window Schedules on Dwg Sheet 4 of 12? If so, should the “#” (quantity) of “Window No. 2” be changed from 7 to 8?
a. The contractor is correct the quantity of “Window No. 2” should be changed from 7 to 8.
4. Dwg Sheet 7 of 12, East Elevation: Two (2) windows are shown on the East Elevation, first-floor, that do not indicate any work – are those windows to remain as is? If so, can you provide the window manufacturer’s name and the model number for each?
a. No work required, we do not have window manufacture names and/or models.
5. Dwg Sheet 8 of 12, North Elevation: Four (4) windows are shown on the North Elevation, first-floor, that do not indicate any work – are those windows to remain as is? If so, can you provide the window manufacturer’s name and the model number for each?
a. No work required, we do not have window manufacture names and/or models.
6. Dwg Sheet 8 of 12, South Elevation: Three (3) windows are shown on the North Elevation [one
(1) first-floor and two (2) basement] that do not indicate any work – are those windows to remain as is? If so, can you provide the window manufacturer’s name and the model number for each?
a. No work required, we do not have window manufacture names and/or models.
7. If the offer intends to rely upon paragraph (d) of FAR 52.204-8 (page 19 of the Solicitation) does the offer only need to provide completed copies of pages 19, 22, and 23 to comply with the “L.2, 2), a) Price Proposal, iii) Section K requirement? (see page 26 of the Solicitation)
a. Yes, it is okay to return only the pages that require fill ins from the contactor.
8. Should the performance period noted on page 6 of the Solicitation, FAR 52.211-10, be changed to reflect a performance period of 120 days after notice to proceed?
a. Yes, that will be corrected in an amendment.
9. Sheet E1.0 & E1.1 can the new exit signs be installed utilizing surface mounted painted EMT or concealed NM or MC Cable or does it have to be in EMT conduit concealed above ceilings and in walls.
a. Per E1.0 and E1.1, General Note 3, conceal/‘RECESS INFRASTRUCTURE AND COMPONENTS, WHERE POSSIBLE.’ Wiring to be per the latest edition of the NEC (2020), based on the existing wood-frame Type V-B construction and ‘B’ occupancy. Per E1.0 and E1.1 General Note 4, ‘WHERE INFRASTRUCTURE IS SURFACE-
MOUNTED OR EXPOSED, SUCH AS CONDUIT, PAINT TO MATCH ADJACENT
FIELD OF (E) MATERIAL/FINISH, TYP.’11.
b. Sheet E1.1 keynote 4 calls for a 60A-2P Panel with 12 space, Specification 260500 (page 4), para. 2.8 lists NEMA PB1, Type 1. NEMA PB1, Type 1 panelboards are not available in 12 space panels. Would a load center be acceptable? If not, please provide additional guidance. (Existing electrical panels throughout the building are load center type).
a. Provide per E1.1, Keynote 4 direction. Configuration and installation to be per the latest edition of the NEC (2020).
10. Sheet E1.0 shows one 2x4 light fixture in one office and keynote 4 says to replace with new type A or AX fixture at the same location, is this correct? Does the new fixture need to be 2x4 or does the government intend to change the match the other new type A fixtures in this office? Neither the lighting schedule nor the specifications identify a 2x4 light fixture.
a. Assuming the existing 2’x4’ fixture is not within an existing ceiling grid, replacing w/ a Type AX fixture as noted on E1.0 should be sufficient.
11. Does the existing attic and wall circuit wiring concealed in the walls run in conduit to the existing switches? Are the light fixtures and wall switches in the attic and walls mounted in metal electric boxes with conduits? If not what method is existing?
a. In the attic there are metal electric boxes with conduits. In the walls there are metal boxes and it looks like there is conduit to it, but cannot be sure if coming from attic or basement.
12. Sheet E1.0 Hallway shows a LX light fixture there are no “X” Emergency battery type light fixtures available in that type of keyless light fixture. The light schedule does not specify an “LX” light fixture. Please clarify fixture type.
a. The Contractor appears correct that the specified fixture doesn’t have a battery backup version. As such, contractor to provide fixture type ‘GX’, in lieu of ‘LX’ fixture type at hall indicated on E1.0.
13. What type of insulation is in the attic -- blown, batt or none? What is the depth?
a. Blown-in, 2-inch average.
14. Is there attic access to the entire attic?
a. There are (2) attic access points. One located in sales room 104 and the other we believe is inaccessible and located in closet across from the office 112 (see photos). We are still looking to see if there is another access point.
15. Sheet E1.1, Keynote 8, can the existing exterior pole light fixture arm be reused for the new light fixture? It appears the metal pole was made to match the mounting bracket the exterior light arm.
a. We assume that the existing exterior light pole was problematic in some fashion that prompted to call-out its removal and replacement with a building-mounted solution.
16. In the description for the exterior paint the solicitation states "STRIP (E) PAINT FROM BUILDING" in keynote 6. Are you wanting the paint removed from the entire exterior siding of the building prior to painting or just the areas that are flaking?
a. The Solicitation states what we require for preparing the build to be painted. Located in Section 090190.52 “Remove existing paint to the degree required for each substrate and surface condition of existing paint.” and Section 099113 “Verify suitability of substrates, including surface conditions and compatibility with existing finishes and primers.
17. How old is the building?
a. The building was built in 1939.
18. Is lead based paint present?
a. The exterior paint was tested in 2019 and all test came back less than method of reporting.
19. Concerns of asbestos in an older building.
a. According to records asbestos was tested in the past and has been remediated, however, samples have been taken of the popcorn ceiling for testing. Results are forthcoming.
20. Are the conduits for the lights in the attic?
a. The conduits contained in the attic are electrical. Please see attached conduit photos.