1240LT22Q0153-0001 - Bessey Nursery Garage Door Replacement.pdf
PDF 156 KB Posted
- Attached to
- Bessey Nursery Garage Door Replacement
- Solicitation number
- 1240LT22Q0153
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
1240LT22Q0153
x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
40LT
OGDEN UT 84401-2310
324 25TH ST
USDA-FS CSA INTERMOUNTAIN 8
09/07/20220001
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
09/07/2022
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PROJECT NAME: Bessey Nursery Garage Door Replacement
AMENDMENT 0001 is issued for the purpose of documenting the pre-proposal meeting/site visit held on September 14, 2022 and answering questions received in regards to the site visit.
The due date for receipt of quotes remains September 21, 2022.
Contractor is required to acknowledge this amendment by signing one copy and returning with quotation to issuing office.
Period of Performance: 10/03/2022 to 12/05/2022
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
LONNIE D. ROOT
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
1240LT22Q0153 – AMENDMENT 0001 09/19/2022
Bessey Nursery Garage Door Replacement Page 2 of 2
(RFI RECEIVED 09/14/22)
The pre-proposal site visit was held on September 14th, 2022. No questions were asked at the site visit. The following questions were asked via email sent the same day.
Q1. Will the contractor remove the existing wood doors?
A1. Yes. Specification 01010, 1.1, A. requires removal of existing wooden doors.
Q2. Will the contractor be required to perform any framing or furring out of the door opening?
A2. Yes. See Specification 08361, 2.2, D. The contractor needs to provide a door to fit the opening, which may require minor framing or furring out of the opening if required based on the size limitations of the door. (The existing garage doors are not standard sizes.)
Q3. Will the contractor have to paint the framing/furring?
A3. No. The Forest Service will handle painting of the minor framing/furring, since the Forest Service has the correct paint on site.
Q4. What are the style and color of the proposed doors?
A4. The answer is found in Specification 08361, 2.2, A & B.
CHANGES AS A RESULT OF THIS AMENDMENT: NONE
| 1240LT22Q0153 (6).pdf |
| 1240LT22Q0153-0001 - Bessey Nursery Garage Doors Q&A Amendment 1.pdf |
File details come from the government source that posted it. Updated .