RaineySOW.pdf

PDF 231 KB Posted

Attached to
Laminated Wood Bridge Kits Federal contract opportunity
Solicitation number
1240LS24Q0010
Issued by
Department of Agriculture Forest Service

About this file

This statement of work and related federal contract opportunity seek the purchase of five prefabricated glulam timber trail bridges for the Rainey Creek Trail Bridge project. The bridges will be used by stock and require an 84-inch clear width and four stringers as detailed in the included standard trail plans. Each bridge must be delivered unassembled with all specified materials packaged and labeled for ease of assembly. All timber, hardware, and structural steel must meet the standards outlined in the plans. Delivery of the bridges to the Rainey Creek Trailhead is required by June 14, 2024 to allow installation during the 2024 field season. The USDA Forest Service solicitation requests base pricing plus four options depending on available funds.

View the file

Other files for this federal contract opportunity

Other files attached to Laminated Wood Bridge Kits, newest first.
File Type Posted
RaineySOW updated.pdf PDF
RaineyGLULAM_FINAL_REV1.pdf PDF
Sol_1240LS24Q0010_Amd_0001.pdf PDF
Sol_1240LS24Q0010.pdf PDF
RaineyGLULAM_drw_spec.pdf PDF
RaineyCreekSOI.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Statement of Work Rainey Creek Trail Bridges

Caribou-Targhee National Forest

General Informa�on This requisition seeks the purchase of five prefabricated glulam timber trail bridges for the Rainey Creek Trail Bridge project, to be delivered in time for Forest Crews to install them during the 2024 field season.

Specifica�ons Details of the bridges are found on the Rainey Creek Trail bridge Standard Trail Plans included with this requisition. As indicated on the plans, these bridges will be used by stock (horses and pack animals) which require an 84 ½ inch clear width and 4 stringers (main support beams).

Each prefabricated bridge shall be delivered unassembled with all materials required for assembly as specified on the plans. These materials shall be packaged and clearly labeled for each bridge. All timber shall be cut to length, holes bored, and treated. All hardware and structural steel shall be supplied in accordance with the plans.

Schedule To ensure delivery before the funding expires and to allow sufficient time to install the bridges during the 2024 field season the Forest requests delivery by June 14th, 2024.

Delivery Delivery location is the Rainey Creek Trailhead (43.4727, -111.2408) located near Swann Valley Idaho. The Forest can perform the off-load if the supplier provides at least a 7 day notice prior to delivery.

Funding The Forest has funds committed to the purchase of these glue-laminated timber trail bridges.

General Information
Specifications
Schedule
Delivery
Funding

File details come from the government source that posted it. Updated .