This is a Statement of Work (SOW) for the 2025 SCNF Culvert Supply contract with the Salmon-Challis National Forest. The contractor must furnish and deliver corrugated steel pipes (CSP) and coupling bands for disaster recovery efforts from the Moose Creek Fire. All deliverables must conform to FP-14 707.02 specifications and the Federal Highway Administration's Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects, 2014 (FP-14), using U.S. Customary units.

The scope includes twelve line items totaling 3,360 linear feet of galvanized helical CSP in various diameters (18, 24, 30, 36, 48, and 72 inches) and gauges (16 and 18 gage), along with associated coupling bands. Specific quantities include 80 linear feet of 72-inch diameter CSP with 5-inch by 1-inch corrugation, 1,000 linear feet of 18-inch diameter CSP, 640 linear feet of 24-inch diameter CSP, 360 linear feet of 30-inch diameter CSP, 200 linear feet of 36-inch diameter CSP, and 160 linear feet of 48-inch diameter CSP, with corresponding coupling bands for each size. Deliverables must be split equally between two locations: Challis Admin Yard in Challis, Idaho, and Jesse Creek Admin Yard in Salmon, Idaho. The contractor is responsible for unloading using vendor-provided equipment and coordinating with the Contract Officer's Representative. Material certifications must include either production or commercial certification per FP-14 106.03 (a) or (b) and FP-14 707.02.

View the file

Other files for this federal contract opportunity

Other files attached to SCNF Culvert Supply, newest first.
File Type Posted
1240LR26Q0014 SF 30 Amendment 0001.pdf PDF
1240LR26Q0014.pdf PDF
Attachment 3- MAPS - Culverts Delivery.pdf PDF
Attachment 1 - Solicitation Terms and Conditions.pdf PDF
Attachment 2 - SOW - Culverts.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Section C - Statement of Work - 1

SECTION C – STATEMENT OF WORK

C-1 Scope of Project Project: 2025 SCNF Culvert Supply

This requisition is to provide corrugated steel pipes (CSP) to the Salmon-Challis National Forest for its disaster recovery efforts from the effects of the Moose Creek Fire.

C-2 Technical Requirements/Tasks The Contractor will furnish and deliver corrugated steel pipes (CSP) and coupling bands as detailed in this document. Deliverables will conform to FP-14 707.02.

Deliverables (corresponds to Schedule of Items):

Line item

Details

1 4 pieces of 20 foot long, 72-inch diameter, 16 gage helical galvanized CSP with 5 inch by 1 inch corrugation (80 linear feet in total)

2 2 sets of: 2-piece 16 gage, 24-inch wide galvanized bands for 72-inch diameter CSP

3 1000 linear feet of 18-inch diameter, 16 gage standard helical galvanized CSP

4 25 of: 18 gage, 12-inch wide galvanized bands for 18-inch diameter CSP

5 640 linear feet of 24-inch diameter, 16 gage standard helical galvanized CSP

6 16 of: 18 gage, 12-inch wide galvanized bands for 24-inch diameter CSP

7 360 linear feet of 30-inch diameter, 16 gage standard helical galvanized CSP

8 9 of: 18 gage, 12-inch wide galvanized bands for 30-inch diameter CSP

9 200 linear feet of 36-inch diameter, 16 gage standard helical galvanized CSP

10 5 of: 18 gage, 12-inch wide galvanized bands for 36-inch diameter CSP

11 160 linear feet of 48-inch diameter, 16 gage standard helical galvanized CSP

12 4 of: 18 gage, 12-inch wide galvanized bands for 48-inch diameter CSP

C-3 Delivery Location The project deliverables will be delivered to the Challis Admin Yard in Challis, ID (see attachment J1) and Jesse Creek Admin Yard in Salmon, ID (see attachment J2).

Section C - Statement of Work - 2

Delivery will be split in half for each pay item to each location. Coordinate with Contract Officer’s Representative (COR).

C-3.1 Unloading by the vendor will be required with vendor provided equipment.

C-4 Contractor’s Key Personnel Point of contact(s) for coordination in delivery and all inquiries.

C-5 Standard Specifications The Federal Highway Administration’s Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects, 2014 applies as the Parent specifications for the project.

These specifications are referred to as “FP-14.” Units of measure for the project are U.S. Customary units.

The FP-14 can be found online at: https://highways.dot.gov/federal-lands/specs

C-6 Material Certifications and Testing Reports

Title Relevant Specification No.

Production or Commercial certification FP-14 106.03 (a) or (b); FP-14 707.02 https://highways.dot.gov/federal-lands/specs

SECTION C – STATEMENT OF WORK
C-1 Scope of Project
C-2 Technical Requirements/Tasks
C-3 Delivery Location
C-3.1
C-4 Contractor’s Key Personnel
C-5 Standard Specifications
C-6 Material Certifications and Testing Reports

File details come from the government source that posted it. Updated .