1240LR24Q0050 Attachment C - 2024 Trail Maintenance Report.pdf
PDF 144 KB Posted
- Solicitation number
- 1240LR24Q0050
- Issued by
-
Department of Agriculture Forest Service
About this file
This document is a 2024 Trail Maintenance Information Report for a National Forest trail in the McCall Ranger District. The report details the trail conditions, maintenance activities, and observations made during the 2024 maintenance season, including the trail length, number of downfall cleared, brush work, tread work, water bars maintained and installed, visitor encounters, and wildlife sightings. The report also includes a severity rating and description of trail maintenance problems such as noxious weeds, downfall, overgrowth, erosion, and boggy areas, along with recommendations for trail management and signage. The report requires the inclusion of before and after photos of each section of trail where maintenance occurred.
The related federal contract opportunity is Solicitation Number 1240LR24Q0050 for the French Creek Bear Pete Ridge Reroutes project near McCall, ID on Payette National Forest, McCall Ranger District. This is a Total Small Business Set-Aside contract opportunity, but no other details about the required products or services, response dates, award dates, or pricing terms are provided in the information given.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
2024 TRAIL MAINTENANCE INFORMATION REPORT
ORGANIZATION/GROUP: ____________________ DATE:
NATIONAL FOREST: RANGER DISTRICT:
TRAIL #: BEGINNING JCT ROAD/TRAIL:
TRAIL NAME:
Trail length (miles): Trail length cleared (miles):
# of downfall encountered: #of downfall cleared:
Debris & Rocks removed: Brush work:
None Some Large (# of ft) _________
Tread Work (# of ft.):
Reroute trail (# of ft.):
Water bars (# maintained): # water bars installed:
Visitors Encountered (#): Type(s):
Wildlife Seen (# and type):
Describe trail conditions over distance. Use the general conditions listed below.
Excellent miles Fair miles Good miles Poor miles Abandoned miles
Estimated average tread width: inches Estimated average right of way clearance: Width ft. Height ft.
Describe trail maintenance problems using the severity ratings listed below (extreme, moderate, light). List length and location of the problem.
Noxious Weeds:
Downfall:
Overgrowth:
Cutting Switchbacks:
Tight Switchbacks:
False Trails:
Erosion:
Side by Side Trails:
Ruts:
Boggy Areas:
Dangerous Sidehills:
Describe route maintenance problems. Include your recommendations concerning management of the route, signing, etc.
2024 TRAIL MAINTENANCE INFORMATION REPORT
Miscellaneous comments:
Photos: For each week of work, take and last one before and after photo of each section of trail where maintenance occurs.
Complete this form and e-mail form to savannah.steele@usda.gov or send by regular mail to
McCall Ranger District C/O Savannah Steele
102 West Lake St
McCall, ID 83638
File details come from the government source that posted it. Updated .