The file's text, extracted by GovTribe without its formatting.
US Department of Agriculture (USDA)
Quality Assurance Surveillance Plan
Contents
| Project Name | 3 | |
| Solicitation / Contract Number | 3 | |
| Section 1: Introduction | 3 | |
| 1.1 | Purpose | 3 |
1.2
| QASP Relation to the Contract | 3 |
| 1.2.1 | QASP Revisions | 3 |
| 1.2.2 | Surveillance of Performance Progression | 3 |
| 1.3 | QASP Relation to the Quality Control Plan (QCP) | 3 |
| Section 2: Performance Description | 3 | |
| 2.1 | Performance Standards and Acceptable Quality Levels (AQLs) | 4 |
| 2.1.1 | Allowable Deviation | 4 |
| 2.1.2 | Substantially Complete | 4 |
| 2.2 | Non-Performance | 4 |
| 2.2.1 | Documentation | 4 |
| 2.2.2 | Remedial Actions | 5 |
| Section 3: Contractor and Government Responsibilities | 5 | |
| 3.1 | Contractor Responsibility | 5 |
| 3.2 | Government Responsibility | 5 |
| 3.2.1 | Contracting Officer (CO) | 5 |
| 3.2.2 | Contracting Officer Representative (COR) | 5 |
| Section 4: Surveillance Methods to Perform Quality Assurance | 6 | |
| 4.1 | Surveillance Methods | 6 |
| 4.1.1 Payments, Reductions & Re-Inspection Costs | 8 | |
| 4.2 | Analysis and Results | 8 |
| 4.2.1 | Outstanding Performance | 9 |
| 4.2.2 | Deficient Performance | 9 |
| Appendix A: Performance Requirements and Inspection Forms | 11 | |
| Appendix B: Discrepancy Report | 26 | |
| Appendix C: Complaint Investigation | 27 | |
2023 Rio Grande National Forest CSE Contract
Solicitation / Contract Number
RFQ 1240LQ23Q0095
Section 1: Introduction This Quality Assurance Surveillance Plan (QASP) is pursuant to the requirements listed in the performance work statement (PWS) entitled 2023 Rio Grande National Forest CSE Contract. This plan sets forth the procedures and guidelines that the USDA, Rio Grande National Forest will use in ensuring the required performance standards or services levels are achieved by the Contractor.
1.1 Purpose
The purpose of the QASP is to describe the systematic methods used to measure performance and to identify the reports required and the resources to be employed. The QASP provides a means for evaluating whether the Contractor is meeting the performance standards identified in the PWS. This QASP is designed to define roles and responsibilities, identify the performance objectives, define the methodologies used to monitor and evaluate the Contractor’s performance, describe quality assurance reporting, and describe the analysis of quality assurance monitoring results.
1.2 QASP Relation to the Contract
1.2.1 QASP Revisions
The Contracting Officer Representative (COR) may make revisions or changes to the QASP procedures and surveillance methods or increase or decrease the degree of surveillance methods at any time during the contract performance period. Changes to the Metric must be incorporated into the PWS, Performance Requirement Summary (PRS) and QASP by a bilateral modification to contract that is issued by the Contracting Officer (CO). A copy of the QASP is provided to the Contractor to enable the Contractor to enhance its Quality Control (QC) program to perform in accordance with its Quality Control Plan (QCP).
1.2.2 Surveillance of Performance Progression
As the performance period progresses, the levels of surveillance may be altered for service areas where performance is either consistently excellent or unsatisfactory. If consistently good performance, then the amount of surveillance may be reduced. If observations reveal consistent deficiencies, increased surveillance may be implemented.
1.3 QASP Relation to the Quality Control Plan (QCP)
The QCP is a required element of contract and the Contractor shall adhere to its established quality control processes and procedures in managing and performing work as described in the contract. While the QCP represents the way in which the Contractor will ensure its quality and timeliness of services, as defined in the PWS, the QASP represents the way in which the Government personnel specified in Section 3: Contractor and Government Responsibilities, Paragraph 3.2, Government Responsibilities will evaluate the Contractor’s performance. The Contractor’s QC program and the residual organization’s QASP should be complementary programs that ensure successful Contractor performance.
Section 2: Performance Description Performance of the Contractor will be monitored through the surveillance methods described in Section 4: Surveillance Methods to Perform Quality Assurance to assess the Contractor’s performance against PWS requirements.
2.1 Performance Standards and Acceptable Quality Levels (AQLs) For selected activities in the PWS, the PRS provides a performance standard and an AQL. A performance standard is the expected level of Contractor performance. An AQL defines the level of performance that is satisfactory. Depending on the service evaluated and the evaluation method selected, performance standards and AQLs may be stated as a number of occurrences or as a percentage. Performance standards and AQLs for random sampling and 100 percent inspection are generally stated as percentages. For periodic inspections, performance standards may be stated as either percentages or as absolute numbers.
The contract requires the Contractor to perform all work as specified. Any inaccuracies or omissions in services or products are referred to as “defects” on the part of the Contractor. The Contractor shall be responsible for all identified defects and may be required to perform the work at no cost to the government. The AQLs take into account that in some instances an allowable level of deficiencies (deviations) is possible while overall performance continues to meet the government’s desired level of service.
2.1.1 Allowable Deviation
The AQLs define the level or number of performance deficiencies the Contractor is permitted to reach under this contract. AQLs take into account the difference between an occasional defect and a gross number of defects. AQLs can be expressed as a percentage of or as an absolute number (e.g., three per month). There may be instances where 100 percent compliance is required, and no deviation is acceptable (e.g., where safety is involved).
2.1.2 Substantially Complete
In some cases, service outputs are evaluated using subjective values (e.g., excellent, satisfactory, unsatisfactory). The criteria for acceptable performance and for defects must be defined for these service outputs. The concept of “substantially complete” should be the basis for inspections based on subjective scales. Work is considered “substantially complete” where there has been no significant departure from the terms of the contract and no omission of essential work. In addition, the Contractor has performed the work required to the best of its ability and the only variance consists of minor omissions or deficiencies.
2.2 Non-Performance
Non-performance occurs when the Contractor’s performance does not meet the AQL for a given requirement. Requirements may contain multiple performance elements, and therefore, deficiencies may occur in one or more aspects of performance (e.g., timeliness, accuracy, completeness, etc.) or subject areas of effort.
When surveillance indicates that the Contractor's service output is not in compliance with the contract requirements, the Contracting Officer’s Representative (COR) must determine whether the Contractor or the Government caused the deficiency. If the cause of the defect rests with the Government, corrective action must be taken through Government channels. If the cause of the defect is due to action or inaction by the Contractor, the Contractor is responsible for correction of the problem at no additional expense to the Government.
2.2.1 Documentation
Documentation of work non-performed or unacceptable work is essential for tracking Contractor performance. The COR will document deficient work by compiling facts describing the inspection methods and results and to substantiate nonconformance with the contract. A sample documentation reporting form is provided in Appendix B: CSE Inspection Forms. The documentation, with any recommendations, will be forwarded to the CO. In the case of the Contractor, the COR will decide whether to elevate the problem to the CO for corrective action.
2.2.2 Remedial Actions
The Federal Acquisition Regulation allows for penalties in the event that the Contractor fails to perform the required services. Penalties are defined as those actions taken under the direction of the CO against the Contractor within the general provisions of the contract for nonconformance to the PWS and PRS.
Section 3: Contractor and Government Responsibilities
3.1 Contractor Responsibility
The Contractor is responsible for: 1) delivering products or services in accordance with the contract; 2) Implementing its QCP, which describes the Contractor’s methods for ensuring all products and services under the contract meet established performance standards and AQLs; 3) Maintaining, and providing for audit, quality control records and reports and all records associated with the investigation and complaint resolutions; 4) Appointing a single quality control point-of-contact to act as a central recipient of communication from the COR or CO.
3.2 Government Responsibility
3.2.1 Contracting Officer (CO)
The CO is responsible for administering and monitoring contract compliance, contract administration, and cost control and for resolving any differences between the observations documented by COR and the Contractor’s performance. The CO may delegate various day-to-day contract administration duties to an Administering ACO (ACO) and/or the COR for performance management and administrative actions such as invoice approval and issuance of Contract Discrepancy Reports may be, and normally are, delegated by the CO to the COR. The CO shall approve any revisions to the QASP processes or standards.
3.2.2 Contracting Officer Representative (COR)
The COR is designated in writing by the CO. The COR will ensure that the QA function is properly executed, plays a key role in contract administration, and performs the contract surveillance and monitoring. Some key contract administration duties include, but are not limited to: 1) performs surveillance as required by this QASP; 2) make recommendations to the CO for issuance of Contract Discrepancy Reports or letters of commendation and acceptance or rejection of completed work and for administrative actions based on unsatisfactory or non-performed work, and revisions or changes to the QASP; and 3) assists the CO in identifying necessary contract modifications and preparing reports of Contractor performance and cost.
The COR may use the form(s) included in the Appendices to perform the inspection or other forms as approved by the CO. The Contractor overall guidance is also provided by FAR clause; see following table:
Table 1. FAR clauses applicable to this contract.
FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1) CLAUSES
Clause Number
Title
Date
PERTAINING TO ALL ITEMS
| 52.236-13 |
| Accident Prevention |
| (NOV 1991) |
| 52.246-4 |
| Inspection of Services-Fixed Price |
| (AUG 1996) |
| 452.236-72 |
| Use of Premises |
| (NOV 1996) |
PERTAINING TO SERVICE ITEMS
52.246-4
Inspection of Services—Fixed Price
(Aug 1996)
52.246-20
Warranty of Services
(May 2001)
Section 4: Surveillance Methods to Perform Quality Assurance
4.1 Surveillance Methods
The surveillance methods used in the QA process are the Government’s tools to monitor the Contractor’s products and services. The best means of determining whether the Contractor has met all contract requirements is to inspect the Contractor’s service products and analyze the results. Further, documented inspection results are an effective tool in contract administration that can confirm the successful achievement of all performance requirements or highlight areas where defects exist and improvements are necessary.
PERFORMANCE REQUIREMENTS
| WORK DESCRIPTION |
| PERFORMANCE STANDARD |
| ACCEPTABLE QUALITY LEVEL (AQL) |
| MONITORING METHOD |
| Plot Data Collection |
| Locate and collect all data identified in the descriptions; PWS 3.0. |
| 90%, unless otherwise permitted by contract specifications |
| · Review Contractor’s written record of Plot Inspections |
· Setting inspection – inspect a minimum of 10% of the settings submitted in each inspection block. Ensure that all required fields are completed. Verify that data meet accuracy standards established in Appendix M of the Common Stand Exam Field Guide (Region 2).
· Plot inspection—inspect a minimum of 10% of plots submitted in each inspection block. Ensure that all required fields are completed. Verify that data meet accuracy standards established in Appendix M of the Common Stand Exam Field Guide (Region 2).
· Utilize inspection forms (Appendix A) to calculate performance scores.
| R2 FSVeg Spatial Polygon Vegetation Form |
| Locate and collect all data identified in the descriptions; PWS 3.0. |
| 90%, unless otherwise permitted by contract specifications |
| · Review Contractor’s written record of Walkthrough polygon attribute inspection. |
· Polygon walkthrough inspection – inspect a minimum of 10% of the settings submitted in the inspection block. Ensure that all required fields are completed. Verify that data meets requirements established in the R2 Supplement to the FSVeg Spatial User Guide.
· Utilize inspection form (Appendix A) to calculate performance scores.
| Prevention of Damage to Physical Improvements, and Resources to Protect |
| Any damage to physical improvements is repaired to meet Government Standards. |
| 100% Unless otherwise permitted by contract requirements |
| · Visual inspection |
· Written documentation of visual inspection, Appendix C.
4.1.1 Payments, Reductions & Re-Inspection Costs
Method of Payment Payment will be made for completed task(s) meeting or exceeding the Acceptable Quality Level (AQL). Upon acceptance, payment will be determined on the service less any deductions for any nonconforming or unacceptable performance as noted below.
Reductions Payments at 90% AQL or above The minimum 90% AQL is required to achieve a satisfactory performance rating. Full payment will be made for final work meeting at least 90% AQL and above.
Payments at 81 to 89% AQL If the plots cannot/will not be reworked to achieve the minimum required 90% AQL, payment of 90% of the plot price will be made for AQL falling between 80 to 89% AQL.
Payments below 80% AQL If the plots cannot/will not be reworked to achieve the minimum required 90% AQL, payment of 90% of the plot price times the actual AQL received will be made for AQL falling below 80% AQL.
Example - 75% AQL is achieved. Plot price is $75.00 $75 x 90% = $67.50 x 75% = $50.63 price to be paid for plot.
Re-Inspection Costs If the original government inspection results are not acceptable to the Contractor, a re-inspection may be requested, in writing, up to seven (7) days after receiving notification of unacceptable work. If the original inspection results in failure due to an unacceptable Form Score or Total Score, but re-inspection results in fully passing score, then the Government assumes the cost of re-inspection. If the re-inspection confirms the results of the original inspection, the Contractor shall reimburse the Government for actual costs incurred for performing re-inspection.
If rework of task(s) is required, the Contractor will be assessed the costs incurred by the Government in performing such activities. The table below lists charge rates for Government re-inspection of work.
| Government wages (per employee performing re-inspection) |
| $36.00/hour |
| *Government mileage |
| $0.655/mile |
*Mileage reimbursement rate in effect January 1, 2023 is $0.655 per mile. Mileage rates change periodically and the most current mileage rates for assessed damages at the time will be used. Most current mileage rates can be found at the General Services Administration website https://www.gsa.gov/travel/plan-book/transportation-airfare-pov-etc/privately-owned-vehicle-pov-mileage-reimbursement-rates.
4.2 Analysis and Results
When the inspections have been completed, the COR will perform an analysis of the Contractor’s performance. The purpose of the analysis is to ensure Government is receiving high-quality products and services from the Contractor. The COR will review the results, rate the Contractor’s compliance with the performance standards and AQLs, and characterize the Contractor’s overall performance. Analysis of all types of contract monitoring will result in one of the following outcomes:
4.2.1 Outstanding Performance
Outstanding performance is the result of the Contractor substantially exceeding the performance standards with significant achievements and no significant deficiencies. The Government may reduce its level of surveillance when the COR determines that the Contractor provides sustained performance that significantly exceeds the requirements with no significant deficiencies.
4.2.2 Deficient Performance
Disincentives for failure to meet the above standards may be as follows:
a. Rework will be completed at Contractor’s expense.
b. If rework is not physically possible, payment deductions will be made for work falling below AQL (Payment Reductions).
c. Damage to the residual stand or infrastructure will be assessed against the Contractor.
d. Government re-inspection charges.
e. Poor performance rating will be given.
[THIS PAGE IS FOR INFORMATIONAL PURPOSES]
The Contacting Officer must include as attachments or exhibits the appropriate performance requirement summary, forms, checklists, etc. in the QASP that will be used during surveillance / monitoring for the applicable contract.
Appendix A: Performance Requirements and Inspection Forms The following forms will be used to surveil performance and inform payment calculations.
CSE Inspection Forms and Accuracy Standards:
R2 FSVEG SPATIAL POLYGON VEGETATION ATTRIBUTES -- INSPECTION FORM
| FIELD NUM |
| NAME |
| ACCURACY STANDARD |
| POINT VALUE |
| # OF ERRORS |
| DEDUCTION (A X B) |
| 1 |
| Region-Forest-District |
| no errors |
| unacceptable |
| 2 |
| Location |
| no errors |
| unacceptable |
| 3 |
| Polygon ID |
| no errors |
| unacceptable |
| 4 |
| Species Survey Method |
| no errors |
| 10 |
| 5 |
| Sample Recorder |
| no errors |
| 3 |
| 6 |
| Sample Date |
| no errors |
| 6 |
| 7 |
| Purpose Code |
| no errors |
| 10 |
| 8 |
| Stocking Flag |
| no errors |
| 6 |
| 9 |
| Regen EV Code |
| no errors |
| 10 |
| 10 |
| Horizontal Diversity |
| no errors |
| 10 |
| 11 |
| Tree Crown Condition |
| no errors |
| 10 |
| 12 |
| Canopy Closure Trees |
| +/- 10% |
| 10 |
| 13 |
| Photo Project ID |
| no errors |
| 3 |
| 14 |
| Photo Date |
| no errors |
| 3 |
| 15 |
| Habitat Structural Stage |
| no errors |
| 10 |
| 16 |
| Change Category |
| no errors |
| 6 |
| 17 |
| Change Date |
| no errors |
| 6 |
| 18 |
| Lifeform/GSC |
| no errors |
| 10 |
| 21 |
| Tree Size Class |
| no errors |
| 10 |
| 22 |
| Shrub Size Class |
| no errors |
| 10 |
| 23 |
| Plant Cover |
| +/- 10% 1) |
| 6 |
Total Deductions (sum of column 'C')
D
Number of Stands Inspected
E
Field Verification Form Score (D / E)
F
COMMON STAND EXAM INSPECTION FORM
side 1
| PROJECT NAME --- CONTRACT NUMBER |
| FOREST / UNIT |
DATE BLOCK RECEIVED
| DATE BLOCK INSPECTED |
| INSPECTORS |
| NUMBER OF SETTINGS: |
| NUMBER OF SETTINGS INSPECTED: |
| L.T. TREE RECORDS INSPECTED: |
S.T. TREE RECORDS INSPECTED:
GSC RECORDS INSPECTED:
VEG. RECORDS INSPECTED:
DOWN WOODY RECORDS INSPECTED:
| NUMBER OF PLOTS: |
| NUMBER OF PLOTS INSPECTED: |
OFFICE INSPECTION
| ACCEPTABLE |
| UNACCEPTABLE |
| N/A |
ALL REQUIRED MATERIALS RETURNED IN GOOD CONDITION
CORRECT NUMBER OF PLOTS COMPLETED IN EACH STAND
ALL REQUIRED FORMS AND FIELDS COMPLETED AND LEGIBLE
MIN. NO. OF SITE/GROWTH TREES COLLECTED FOR EACH SETTING
ALL SETTINGS MEET MINIMUM TREE PER PLOT AVERAGES
ELECTRONIC DATA COMPLETE AND ACCEPTABLE
FIELD INSPECTION
| ACCEPTABLE |
| UNACCEPTABLE |
| N/A |
ALL REFERENCE POINTS AND PLOT CENTERS RELOCATABLE
ALL PLOT LOCATIONS CORRECT AND UNBIASED
ALL STANDS HAVE A PLOT DISTRIBUTION THAT EQUALLY SAMPLES ALL PORTIONS OF THE ENTIRE STAND
SUFFICIENT ERRORS ACCUMULATE TO INDICATE A DISCREPANCY TREND
ALL INFORMATION ON SAMPLE DESIGN FORMS COMPLETE AND CORRECT
ALL SETTINGS AND PLOTS HAVE CORRECT SETTING ID
TOTAL FORM SCORE CALCULATION
Field Verification Polygon Data Form Score
Setting Form Score
Sample Design Form Score
Plot Form Score
Total Tree Form Score
Ground Surface Cover Form Score
Vegetation Composition Form Score
Downed Woody Form Score
TOTAL SCORE (sum of all scores)
OFFICE AND FIELD INSPECTION
-- ANY UNACCEPTABLE ITEM FAILS INSPECTION BLOCK
INSPECTION BLOCK
TOTAL FORM SCORE CALCULATION
| All form scores < 5.0 and Total Score < 10.0 |
| = pass (full payment) |
PASS
| Any Form >= 5.0 |
| = rework forms that fail for entire inspection unit |
| Total Score >= 10.0 |
| = rework entire inspection unit |
FAIL
Errors in any field that has a Point Value of "unacceptable" will fail the block
INSPECTION CREW SIGNATURES:
DATE
DATE
COMMENTS AND FOLLOW-UP ACTION on side 2
COMMON STAND EXAM INSPECTION FORM
side 2
POINTS INSPECTED
| LOCATION/WATERSHED ALIAS) |
| STAND |
| PLOT NUMBERS |
COMMENTS -- OFFICE EDIT:
COMMENTS -- FIELD INSPECTIONS:
FOLLOW-UP ACTION:
SETTING INSPECTION FORM
| FIELD NUM |
| NAME |
| ACCURACY STANDARD |
| POINT VALUE |
| # OF ERRORS |
| DEDUCTION (A X B) |
| 1 |
| Region |
| no errors |
| unacceptable |
| 2 |
| Proclaimed Forest |
| no errors |
| unacceptable |
| 3 |
| District |
| no errors |
| unacceptable |
| 4 |
| Location/Watsershed Alias |
| no errors |
| unacceptable |
| 5 |
| Stand Number |
| no errors |
| unacceptable |
| 6 |
| Ownership |
| no errors |
| unacceptable |
| 7 |
| State |
| no errors |
| unacceptable |
| 8 |
| County |
| no errors |
| unacceptable |
| 9 |
| Administrative Forest |
| no errors |
| unacceptable |
| 12 |
| Exam Level |
| no errors |
| unacceptable |
| 13 |
| Exam Purpose |
| no errors |
| unacceptable |
| 15 |
| Existing Veg |
| no errors |
| 5 |
| 16 |
| Potential Veg Reference |
| no errors |
| unacceptable |
| 17 |
| Potential Veg |
| +/- phase |
| 20 |
| 19 |
| Cap. Growing Area % |
| +/- 10 units |
| 1 |
| 20 |
| Fuel Model |
| no errors |
| 2 |
| 21 |
| Elevation |
| +/- 2 contour intervals |
| 3 |
| 22 |
| Aspect |
| +/- 45 degrees |
| 3 |
| 24 |
| Slope Position |
| +/- 1 class |
| 2 |
| 25 |
| Acres |
| no errors |
| unacceptable |
| 26 |
| Radial Growth Interval |
| no errors |
| unacceptable |
| 27 |
| Radial Growth Interval #2 |
| no errors |
| unacceptable |
| 28 |
| Height Growth Interval |
| no errors |
| unacceptable |
| 29 |
| Fuel Photo Reference |
| no errors |
| unacceptable |
| 30 |
| Precision Protocol |
| no errors |
| unacceptable |
| 32 |
| Setting Remarks |
| complete and accurate |
| 5 |
| 33 |
| Damage Category |
| no errors |
| 2 |
| 34 |
| Damage Agent |
| no errors |
| 1 |
| 35 |
| Damage Severity |
| no errors |
| 1 |
| 36 |
| Species of Mgt. Interest |
| no errors |
| 1 |
| 37 |
| Sketch Map & Traverse Notes |
| complete and accurate |
| 10 |
Total Deductions (sum of Col ‘C’)
D
Number of Stands Inspected
E
Setting Form Score (D / E)
F
SAMPLE DESIGN INSPECTION FORM
| FIELD NUM |
| NAME |
| ACCURACY STANDARD |
| POINT VALUE |
| # OF ERRORS |
| DEDUCTION (A X B) |
| 1 |
| Selection Method Type |
| no errors |
| unacceptable |
| 2 |
| Sample Expansion Factor |
| no errors |
| unacceptable |
| 3 |
| Starting Azimuth |
| no errors |
| 7 |
| 4 |
| Points Installed |
| no errors |
| unacceptable |
| 5 |
| Subpop Filter |
| no errors |
| unacceptable |
| 6 |
| Sample/Select Remarks |
| complete and accurate |
| 5 |
| 7 |
| Selection Criteria |
| no errors |
| unacceptable |
| 8 |
| Subpop Variable |
| no errors |
| unacceptable |
| 9 |
| Subpop Min Value |
| no errors |
| unacceptable |
| 10 |
| Subpop Max Value |
| no errors |
| unacceptable |
Total Deductions (sum of column 'C')
D
Number of Stands Inspected
E
Sample Design Form Score (D / E)
F
PLOT INSPECTION FORM
| FIELD NUM |
| NAME |
| ACCURACY STANDARD |
| POINT VALUE |
| # OF ERRORS |
| DEDUCTION (A X B) |
| 1 |
| Plot Number |
| no errors |
| unacceptable |
| 2 |
| Plot Latitude |
| no errors |
| unacceptable |
| 3 |
| Plot Longitude |
| no errors |
| unacceptable |
| 4 |
| Cap. Growing Area % |
| +/- 10 % |
| 2 |
| 5 |
| Plot Aspect |
| +/- 45 degrees |
| 6 |
| 6 |
| Plot Slope % |
| +/- 10 units |
| 6 |
| 7 |
| Slope Position |
| +/- 1 class |
| 6 |
| 8 |
| Slope Horizontal Shape |
| +/- 1 class |
| 2 |
| 9 |
| Slope Vertical Shape |
| +/- 1 class |
| 2 |
| 10 |
| Elevation |
| +/- 2 contour intervals |
| 6 |
| 11 |
| Existing Veg |
| no errors |
| 10 |
| 12 |
| Potential Veg |
| no errors |
| 10 |
| 13 |
| Plot History |
| no errors |
| 6 |
| 14 |
| Plot History Date |
| 1) |
| 2 |
| 15 |
| Fuel Model |
| no errors |
| 2 |
| 16 |
| Residue Descriptive Code |
| no errors |
| 2 |
| 17 |
| Distance to Seed Wall |
| no errors |
| 2 |
| 18 |
| Remarks |
| complete and accurate |
| 10 |
Total Deductions (sum of column 'C')
D
Number of Plots Inspected
E
Plot Form Score (D / E)
F
1) Year required if field #13 is other than code 10 or blank
NOTE: Missed trees or extra trees will count as a ‘TREE COUNT’ error (75 points for large trees and 20 points for small trees), based on the Tree Count accuracy standards by tree sizes listed above.
TREE INSPECTION FORM
SAMPLE PLOT for LARGE TREES (L.T.) -- Variable Radius and/or Fixed Area Plot/Transect
| FIELD NUM |
| NAME |
| ACCURACY STANDARD |
| POINT VALUE |
| # OF ERRORS |
| DEDUCTION (A X B) |
| 1 |
| Plot Number |
| no errors |
| unacceptable |
| 2 |
| Tag ID Number |
| no errors |
| 10 |
| 3 |
| Tree Status |
| no errors |
| 50 |
| 5 |
| Site Tree/GST - field correct |
| no errors |
| 50 |
| 5 |
| Site Tree -- Selection |
| no errors |
| 20 |
| 6 |
| Tree Species |
| no errors |
| 50 |
| 7 |
| Tree Count (live/dead) |
| 1) |
| 75 |
| 7 |
| Tree Count (stumps/down) |
| 2) |
| 20 |
| 8 |
| Number of Stems |
| no errors for DRC species |
| 2 |
| 11 |
| Height to Crown |
| +/- 10 % |
| 2 |
| 12 |
| Radial Growth |
| +/- 1/20 inch |
| 5 |
| 13 |
| Radial Growth #2 |
| +/- 1/20 inch |
| 5 |
| 14 |
| Height Growth |
| +/- 1 foot |
| 5 |
| 16 |
| Crown Ratio |
| +/- 10 units |
| 5 |
| 17 |
| Crown Class |
| no errors |
| 5 |
| 19 |
| Wildlife Use |
| no errors |
| 2 |
| 20 |
| Log/Snag Decay |
| no errors |
| 5 |
| 21 |
| Cone Serotiny |
| no errors for PICO, PIBA |
| 5 |
| 22 |
| Damage Category |
| no errors |
| 10 |
| 23 |
| Damage Agent |
| no errors |
| 2 |
| 24 |
| Damage Part |
| no errors |
| 2 |
| 25 |
| Damage Severity |
| no errors |
| 5 |
| 26 |
| Tree Remarks |
| complete and accurate |
| 10 |
L.T. Deductions (sum of column 'C')
D
L.T. Tree Records Inspected
E
L.T. Sample Score (D / E)
F
1)Tree Count
2) Tree Count (stumps/down) Accuracy Standard
| Intensive/Extensive Exam |
| no errors |
All Exam Levels
Stumps/Down
3) DBH/DRC Accuracy Standards
Intensive/Extensive Exam Levels
| a. |
| subpop min value to 13.9 inches |
| +/- 0.1 inch |
| 4) Height |
| b. |
| 14.0 inches to 23.9 inches |
| +/- 0.2 inch |
| All Exam Levels |
| c. |
| 24.0 inches - 34.9 inches |
| +/- 0.3 inch |
| d. |
| > 35.0 inches |
| +/- 0.5 inch |
| e. |
| Borderline variable plot trees |
| +/- 0.1 inch |
Quick Plot
| a. |
| All Trees |
| +/- 1.0 inch |
(for the purpose of determining trees in or out)
TREE INSPECTION FORM
SAMPLE PLOT for SMALL TREES (S.T.) -- Fixed Area Plot/Transect
Project Name
| FIELD NUM |
| NAME |
| ACCURACY STANDARD |
| POINT VALUE |
| # OF ERRORS |
| DEDUCTION (A X B) |
| 1 |
| Plot Number |
| no errors |
| unacceptable |
| 2 |
| Tag ID Number |
| no errors |
| 10 |
| 3 |
| Tree Status |
| no errors |
| 20 |
| 5 |
| Site Tree/GST - field correct |
| no errors |
| 10 |
| 6 |
| Tree Species |
| no errors |
| 10 |
| 8 |
| Number of Stems |
| no errors for DRC species |
| 2 |
| 10 |
| Tree Height |
| +/- 10 % |
| 10 |
| 11 |
| Height to Crown |
| +/- 10 % |
| 2 |
| 12 |
| Radial Growth |
| +/- 1/20 inch |
| 5 |
| 13 |
| Radial Growth #2 |
| +/- 1/20 inch |
| 5 |
| 14 |
| Height Growth |
| Height > 6 ft +/- 1.0 foot |
| 5 |
Height <= 6 ft+/- 0.1 foot
| 16 |
| Crown Ratio |
| +/- 10 units |
| 5 |
| 17 |
| Crown Class |
| no errors |
| 5 |
| 19 |
| Wildlife Use |
| no errors |
| 2 |
| 20 |
| Log/Snag Decay |
| no errors |
| 5 |
| 21 |
| Cone Serotiny |
| no errors for PICO, PIBA |
| 5 |
| 22 |
| Damage Category |
| no errors |
| 10 |
| 23 |
| Damage Agent |
| no errors |
| 2 |
| 24 |
| Damage Part |
| no errors |
| 2 |
| 24 |
| Damage Severity |
| +/- 10 % or +/- 1 class |
| 5 |
| 25 |
| Tree Remarks |
| complete and accurate |
| 10 |
S.T. Deductions (sum of column 'C')
D
S.T. Tree Records Inspected
E
S.T. Sample Score (D / E)
F
| Total Tree Form Score |
| (Sum of L.T. score and S.T. score) |
| (ST) |
| + (LT) |
1) Tree Count Accuracy Stds:
All Exam Levels
2) DBH/DRC Accuracy Standards:
| Height |
| Diameter |
| Actual Trees |
| Accuracy |
| Intensive/Extensive Exam Level |
| Range/Grouping |
| Range/Grouping |
| On Plot |
| Standard |
| a. |
| < 0.5 inch |
| no errors |
| *All |
| All |
| 0 |
| 0 trees |
| b. |
| 0.5 inch to subpop max |
| +/- 0.1 inch |
*If non-stocked and tree is recorded, this is an error.
< 0.5 feet
| 1 - 5 |
| +/- 2 trees |
| c. |
| Estimated DRC |
| +/- 1.0 inch |
< 0.5 feet
>= 0.5 feet - <4.5 feet
>= 0.5 feet - <4.5 feet
| All |
| 0.1" - subpop max dbh/drc |
| 1 - 5 |
| +/- 1 tree |
| All |
| 0.1" - subpop max dbh/drc |
| >= 6 |
| +/- 10% |
VEGETATION COMPOSITION INSPECTION FORM 1 - Cover and Cover by Lifeform
| FIELD NUM |
| NAME |
| ACCURACY STANDARD |
| POINT VALUE |
| # OF ERRORS |
| DEDUCTION (A X B) |
| 1 |
| Plot Number |
| no errors |
| unacceptable |
| 4 |
| Canopy Cover |
| +/- 10 units |
| 5 |
| 5 |
| Predom. Height |
| +/- 10 % of height |
| 3 |
| 6 |
| Predom. DBH/DRC |
| no errors |
| 3 |
| 7 |
| User Defined Data |
| no errors |
| 2 |
| 8 |
| Remarks |
| complete and accurate |
| 1 or 5* |
Total Deductions (sum of column 'C')
D
Number of Veg Records Inspected
E
Veg. Comp. Form Score
F
*if Remarks is a required field, point value = 5, else point value = 1
VEGETATION COMPOSITION INSPECTION FORM 2 - Cover by Layer and Species
| FIELD NUM |
| NAME |
| ACCURACY STANDARD |
| POINT VALUE |
| # OF ERRORS |
| DEDUCTION (A X B) |
| 1 |
| Plot Number |
| no errors |
| unacceptable |
| 5 |
| Canopy Cover |
| +/- 10 units |
| 5 |
| 6 |
| Predom. Height |
| +/- 10 % of height |
| 3 |
| 7 |
| Predom. DBH/DRC |
| no errors |
| 3 |
| 8 |
| Predom. Age |
| +/- 10 units |
| 2 |
| 10 |
| Shrub Form |
| no errors |
| 3 |
| 11 |
| User Defined Data |
| no errors |
| 2 |
| 12 |
| Remarks |
| complete and accurate |
| 1 or 5* |
Species present but not recorded
Total Deductions (sum of column 'C')
D
Number of Veg Records Inspected
E
Veg. Comp. Form Score
F
*if Remarks is a required field, point value = 5, else point value = 1
Vegetation Composition FORM 4- Ground Surface Cover
FIELD
NUM
| NAME |
| ACCURACY STANDARD |
| POINT VALUE |
| # OF ERRORS |
| DEDUCTION (A X B) |
| 1 |
| Plot Number |
| no errors |
| unacceptable |
| 2 |
| Surface Cover Type |
| no errors |
| 3 |
| 3 |
| Surface Cover % |
| +/- 10 units |
| 3 |
| 4 |
| Remarks |
| complete and accurate |
| 1 or 5* |
| Total Deductions (sum of column 'C') |
| D |
Number of Plots Inspected
E
| Ground Surface Cover Form Score (D C E) |
| F |
*if Remarks is a required field, point value = 5, else point value = 1
DOWNED WOODY INSPECTION FORM
| FIELD NUM |
| NAME |
| ACCURACY STANDARD |
| POINT VALUE |
| # OF ERRORS |
| DEDUCTION (A X B) |
| 1 |
| Plot Number |
| no errors |
| unacceptable |
| 2 |
| First Duff |
| +/- 1/2 inch |
| 3 |
| 3 |
| Second Duff |
| +/- 1/2 inch |
| 3 |
| 4 |
| Fuel Depth |
| +/- 1 foot |
| 3 |
| 5 |
| Twig 0 - 0.24 |
| +/- 40% |
| 3 |
| 6 |
| Twig 0.25 - 0.99 |
| +/- 30% |
| 3 |
| 7 |
| Twig 1.0 - 2.99 |
| +/- 20% |
| 3 |
| 17 |
| Decay Class |
| no errors |
| 5 |
| 18 |
| Diameter |
| +/- 1 inch on measurements |
| 3 |
| 19 |
| Piece Length |
| +/- 10% on measurements |
| 3 |
Total Deductions (sum of column 'C')
D
Number of Downed Woody Records Inspected
E
Downed Woody Form Score (D / E)
F
| 7) Down |
| Piece Count |
| Accuracy Standard |
Appendix B: Discrepancy Report The following document will be used to communicate deficiencies to the Contractor.
| DISCREPANCY REPORT |
| 1. DISCREPENCY REPORT NO. |
| 2. TO: (Contractor / Project Manager Name) |
| 3. FROM: (Name of COR) |
CONTRACT NUMBER: DATE:
| PREPARED |
| ORAL NOTIFICATION |
| RETURNED BY CONTRACTOR |
| ACTION COMPLETE |
4. DISCREPENCY OR PROBLEM (Describe in Detail. Include PWS references. Attach Continuation Sheet if Necessary)
5. SIGNATURE OF COR
| 6. TO: (Name of COR) |
| 7. FROM: (Contractor / Project Manager) |
8. CONTRACTOR RESPONSE AS TO CAUSE, EFFECT, CORRECTIVE ACTION AND ACTIONS TO PREVENT RECURRENCE (Attach Continuation Sheet if necessary. Cite applicable Contractor QC program procedures or new QC procedures)
| 9. SIGNATURE OF CONTRACTOR REPRESENTIVE |
| 10. DATE |
11. GOVERNMENT EVALUATION (Acceptance, partial acceptance, or rejection. Attach Coordination Sheet if necessary)
12. GOVERNMENT ACTIONS (Cure notice, show cause, other)
CLOSE OUT
KTR NOTIFIED
| NAME AND TITLE |
| SIGNATURE |
| DATE |
COR
Appendix C: Complaint Investigation The following document will be used to investigate complaints of Contractor violation of PWS safety or protection measures (PWS Sections 4.0 and 5.0) or unprofessional conduct/violation of law.
CONTRACT NUMBER: _________________________
SERVICE or STANDARD:
SURVEY PERIOD: ___________________
DATE COMPLAINT RECEIVED: ____________
SOURCE OF COMPLAINT: _________________________________________ (Name) _______________________________________________________________ (Organization) ___________________ (Phone No.) _________________________________ (Email Address)
NATURE OF COMPLAINT: ____________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
RESULTS OF COMPLAINT INVESTIGATION: ____________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
DATE SERVICE PROVIDER INFORMED OF COMPLAINT: _____________
CORRECTIVE ACTION TAKEN BY SERVICE PROVIDER: _________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Received and Validated By: __________________________________________ Prepared By: _____________________________ Date: _________________ image1.png image2.png image3.png image4.png image5.png image6.png image7.png image8.png image9.png