This document is a Quality Assurance Surveillance Plan (QASP) for the Sopris Ranger Station Snow Removal contract (1240LP27Q0014) issued by the U.S. Department of Agriculture, Forest Service, Rocky Mountain Region, White River National Forest, Aspen Sopris Ranger District.

The QASP establishes the government's systematic procedures for monitoring and evaluating contractor performance in removing excessive snow from parking lots, parking areas, and sidewalks at the Sopris Ranger Station. Performance requirements include: (1) removing snow and ice by 7:00 a.m. on business days when accumulation reaches 2 inches or more, and within 24 hours after weekend or Federal holiday snowfall; (2) maintaining parking space and dumpster accessibility with no more than 1 percent of spaces unavailable; (3) protecting landscaping, utilities, improvements, trees, shrubs, and sprinkler heads with zero deviation tolerance; (4) preventing vehicle blockage and damage with zero deviation tolerance; and (5) completing off-site snow hauling within directed timeframes with invoiced hours matching performed hours. Surveillance methods include periodic inspections, visual inspections, and customer feedback validation. Performance is measured against Acceptable Quality Levels (AQLs), with acceptable performance defined as meeting all standards and no more than two validated customer complaints per service month. The Contracting Officer Representative (COR) will conduct inspections following snow events and perform ongoing analysis to rate contractor compliance as Exceptional, Acceptable, Marginal, or Unacceptable. Non-performance is documented through discrepancy reports, with potential remedial actions including corrective action requests, cure notices, payment withholding, or service rejection. The appendices provide example forms for discrepancy reports, customer feedback records, inspection checklists, quality assurance monitoring, complaint investigations, and surveillance activity tracking.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

US Department of Agriculture (USDA)

Quality Assurance Surveillance Plan

Contents Project Name

Solicitation / Contract Number

Section 1: Introduction

1.1 Purpose

1.2 QASP Relation to the Contract

1.2.1 QASP Revisions

1.2.2 Surveillance of Performance Progression

1.3 QASP Relation to the Quality Control Plan (QCP)

Section 2: Performance Description

2.1 Performance Standards and Acceptable Quality Levels (AQLs)

2.1.1 Allowable Deviation

2.1.2 Substantially Complete

2.2 Non-Performance

2.2.1 Documentation

2.2.2 Remedial Actions

Section 3: Contractor and Government Responsibilities

3.1 Contractor Responsibility

3.2 Government Responsibility

3.2.1 Contracting Officer (CO)

3.2.2 Contracting Officer Representative (COR)

3.2.3 Customers

Section 4: Surveillance Methods to Perform Quality Assurance

4.1 Surveillance Methods

4.2 Analysis and Results

Appendix A: Performance Requirements Summary

Appendix B: Example Discrepancy Report

Appendix C: Customer Feedback Record

Appendix D: Example Guide / Inspection List

Appendix E: Example Quality Assurance Monitoring

Appendix F: Example Customer Complaint Investigation

Appendix G: Example Surveillance Activity Checklist

Project Name Sopris Ranger Station Snow Removal

Solicitation / Contract Number

1240LP27Q0014

Section 1: Introduction This Quality Assurance Surveillance Plan (QASP) is pursuant to the requirements listed in the performance work statement (PWS) entitled Sopris Ranger Station Snow Removal, to remove excessive snow from parking lots and parking areas (non-paved) and all sidewalks. This includes removing packed snow and any built-up ice on sidewalks and applying salt (or other de-ice) as needed. This plan sets forth the procedures and guidelines that the USDA, USFS-R2-WRNF-Aspen Sopris Ranger District will use in ensuring the required performance standards or services levels are achieved by the contractor.

1.1 Purpose

The purpose of the QASP is to describe the systematic methods used to measure performance and to identify the reports required and the resources to be employed. The QASP provides a means for evaluating whether the contractor is meeting the performance standards identified in the PWS. This QASP is designed to define roles and responsibilities, identify the performance objectives, define the methodologies used to monitor and evaluate the contractor’s performance, describe quality assurance reporting, and describe the analysis of quality assurance monitoring results.

1.2 QASP Relation to the Contract

1.2.1 QASP Revisions

The Contracting Officer Representative (COR) may make revisions or changes to the QASP procedures and surveillance methods or increase or decrease the degree of surveillance methods at any time during the contract performance period. Changes to the Metric must be incorporated into the PWS, Performance Requirement Summary (PRS) and QASP by a bilateral modification to contract that is issued by the Contracting Officer (CO). A copy of the QASP is provided to the contractor to enable the contractor to enhance its Quality Control (QC) program to perform in accordance with its Quality Control Plan (QCP).

1.2.2 Surveillance of Performance Progression

As the performance period progresses, the levels of surveillance may be altered for service areas where performance is either consistently excellent or unsatisfactory. If consistently good performance, then the amount of surveillance may be reduced. If observations reveal consistent deficiencies, increased surveillance may be implemented.

1.3 QASP Relation to the Quality Control Plan (QCP)

The QCP is a required element of contract and the Contractor shall adhere to its established quality control processes and procedures in managing and performing work as described in the contract. While the QCP represents the way in which the Contractor will ensure its quality and timeliness of services, as defined in the PWS, the QASP represents the way in which the Government personnel specified in Section 3: Contractor and Government Responsibilities, Paragraph 3.2, Government Responsibilities will evaluate the contractor’s performance. The contractor’s QC program and the residual organization’s QASP should be complementary programs that ensure successful contractor performance.

Section 2: Performance Description Performance of the contractor will be monitored through the surveillance methods described in Section 4: Surveillance Methods to Perform Quality Assurance to assess the Contractor’s performance against PWS requirements.

2.1 Performance Standards and Acceptable Quality Levels (AQLs) For selected activities in the PWS, the PRS provides a performance standard and an AQL. A performance standard is the expected level of contractor performance. An AQL defines the level of performance that is satisfactory. Depending on the service evaluated and the evaluation method selected, performance standards and AQLs may be stated as a number of occurrences or as a percentage. Performance standards and AQLs for random sampling and 100 percent inspection are generally stated as percentages. For periodic inspections, performance standards may be stated as either percentages or as absolute numbers.

The contract requires the Contractor to perform all work as specified. Any inaccuracies or omissions in services or products are referred to as “defects” on the part of the Contractor. The Contractor shall be responsible for all identified defects and may be required to perform the work at no cost to the government. The AQLs take into account that in some instances an allowable level of deficiencies (deviations) is possible while overall performance continues to meet the government’s desired level of service.

2.1.1 Allowable Deviation

The AQLs define the level or number of performance deficiencies the Contractor is permitted to reach under this contract. AQLs take into account the difference between an occasional defect and a gross number of defects. AQLs can be expressed as a percentage of or as an absolute number (e.g., three per month). There may be instances where 100 percent compliance is required, and no deviation is acceptable (e.g., where safety is involved).

2.1.2 Substantially Complete

In some cases, service outputs are evaluated using subjective values (e.g., excellent, satisfactory, unsatisfactory). The criteria for acceptable performance and for defects must be defined for these service outputs. The concept of “substantially complete” should be the basis for inspections based on subjective scales. Work is considered “substantially complete” where there has been no significant departure from the terms of the contract and no omission of essential work. In addition, the Contractor has performed the work required to the best of its ability and the only variance consists of minor omissions or deficiencies.

2.2 Non-Performance

Non-performance occurs when the contractor’s performance does not meet the AQL for a given requirement.

Requirements may contain multiple performance elements, and therefore, deficiencies may occur in one or more aspects of performance (e.g., timeliness, accuracy, completeness, etc.) or subject areas of effort.

When surveillance indicates that the contractor's service output is not in compliance with the contract requirements, the Contracting Officer’s Representative (COR) must determine whether the Contractor or the Government caused the deficiency. If the cause of the defect rests with the Government, corrective action must be taken through Government channels. If the cause of the defect is due to action or inaction by the contractor, the contractor is responsible for correction of the problem at no additional expense to the Government.

2.2.1 Documentation

Documentation of work non-performed or unacceptable work is essential for tracking Contractor performance. The COR will document deficient work by compiling facts describing the inspection methods and results and to substantiate nonconformance with the contract. A sample documentation reporting form is provided in Appendix B. The documentation, with any recommendations, will be forwarded to the CO. In the case of the Contractor, the COR will decide whether to elevate the problem to the CO for corrective action.

2.2.2 Remedial Actions

The Federal Acquisition Regulation allows for penalties in the event that the Contractor fails to perform the required services. Penalties are defined as actions taken under the direction of the CO against the contractor within the general provisions of the contract for nonconformance to the PWS and PRS.

Section 3: Contractor and Government Responsibilities

3.1 Contractor Responsibility

The Contractor is responsible for delivering products or services in accordance with the contract. Implementing its QCP, which describes the Contractor’s methods for ensuring all products and services under the contract meet established performance standards and AQLs. Maintaining, and providing for audit, quality control records and reports and all records associated with the investigation and complaint resolutions. Appointing a single quality control point-of-contact to act as a central recipient of communication from the COR or CO.

3.2 Government Responsibility

3.2.1 Contracting Officer (CO)

The CO is responsible for administering and monitoring contract compliance, contract administration, and cost control and for resolving any differences between the observations documented by COR and the contractor’s performance. The CO may delegate various day-to-day contract administration duties to an Administrative Contracting Officer (ACO) and/or the COR for performance management and administrative actions such as invoice approval and issuance of Contract Discrepancy Reports may be, and normally are, delegated by the CO to the COR. The CO shall approve any revisions to the QASP processes or standards.

3.2.2 Contracting Officer Representative (COR)

The COR, is designated in writing, by the CO. The COR will ensure that the QA function is properly executed, plays a key role in contract administration and performs the contract surveillance and monitoring. Some key contract administration duties include, but are not limited to, performs surveillance as required by this QASP; make recommendations to the CO for issuance of Contract Discrepancy Reports or letters of commendation and acceptance or rejection of completed work and for administrative actions based on unsatisfactory or non-performed work, and revisions or changes to the QASP;

and assists the CO in identifying necessary contract modifications and preparing reports of Contractor performance and cost.

The COR may use the form(s) included in the Appendices to perform the inspection or other forms as approved by the CO. The Contractor overall guidance is also provided by FAR clause within the contract.

3.2.3 Customers

Customers or organizations/offices that the Contractor provided support may be requested to assist the COR in conducting QA to provide information relating to the Contractor’s performance through Customer Feedback.

Information gained from the Customer Feedback may be used in conjunction with other methods of observation to rate the performance of the Contractor.

Section 4: Surveillance Methods to Perform Quality Assurance

4.1 Surveillance Methods

The surveillance methods used in the QA process are the Government’s tools to monitor the Contractor’s products and services. The best means of determining whether the Contractor has met all contract requirements is to inspect the Contractor’s service products and analyze the results. Further, documented inspection results are an effective tool in contract administration that can confirm the successful achievement of all performance requirements or highlight areas where defects exist and improvements are necessary.

The Contractor shall implement and maintain a documented quality control system that identifies and results in correction of potential and actual problem areas throughout the entire scope of the contract. The Contractor's Quality Control Plan (QCP) shall be submitted with its quotation (PWS paragraph 1.6.1). The QCP or interim plan shall be implemented on the first day of contract performance. The Government will make final review and acceptance of the QCP and any subsequent changes. The Contractor's Quality Control system shall include, as a minimum, the following to cover all supervisory operations, including work by subcontractors.

Performance Requirement Summary (PRS) 1 Requirement: Snow and ice removed from all parking lots and sidewalks by 7:00 a.m. on business days when snowfall accumulation reaches 2 inches or more in a 12-hour period; weekend and Federal holiday snowfall removed from parking lots by 7:00 a.m. the next business day and from the adjacent public sidewalks within 24 hours after snowfall ends (PWS 1.6.3 and 5.1.1).

Method of Surveillance: Periodic Inspection and Customer Feedback Measurement:

The COR will conduct visual inspections following qualifying snow events to verify parking lots, walkways, entrances, and sidewalks have been cleared by 7:00 a.m. on business days, and that the public sidewalks have been cleared within 24 hours after weekend or Federal holiday snowfall ends.

Snow accumulation records from local weather reports and/or on-site observations may be used to determine whether service should have been performed.

Inspections will verify surfaces are reasonably safe for vehicle and pedestrian use and free of excessive snow or ice accumulation.

Performance is acceptable when all required areas are cleared by the specified time and no more than two validated customer complaints are received within a service month.

Any instance where required snow removal is not completed by the required time constitutes a defect.

Performance Requirement Summary (PRS) 2 Requirement: Parking spaces and dumpster areas remain accessible and clear of snow.

Method of Surveillance: Visual Inspection and Customer Feedback Measurement:

The COR will periodically inspect parking areas and dumpster access points after snow-removal operations.

Inspections will verify that no more than 1 percent of parking spaces are unavailable due to snow accumulation or snow storage and that dumpsters remain accessible for use and service.

Performance is acceptable when parking availability meets the contract standard and no more than two validated customer complaints are received within a service month.

Any blocked dumpster access or reduction of parking capacity exceeding the allowable threshold constitutes a defect.

Performance Requirement Summary (PRS) 3 Requirement: Snow removal must protect landscaping, utilities, improvements, trees, shrubs, sprinkler heads, and maintain unobstructed sidewalks and walkways.

Method of Surveillance: Periodic Inspection Measurement:

The COR will perform visual inspections throughout the season and after significant snowfall events.

Inspections will verify that snow is placed only in designated storage areas and that sidewalks and walkways remain unobstructed.

Any evidence of damage to government property, landscaping, sprinkler systems, utilities, or blocked pedestrian routes will be documented.

Because the threshold is zero deviation from standard, any contractor-caused damage or blockage constitutes a defect.

Performance Requirement Summary (PRS) 4 Requirement: Contractor shall not block vehicles with snow piles or damage vehicles during snow-removal operations.

Method of Surveillance: Periodic Inspection and Customer Feedback Measurement:

The COR will conduct periodic inspections during and after snow-removal operations.

Observations and documented reports from vehicle owners may be used to verify compliance.

Performance is acceptable when no vehicles are blocked by snow piles or banks and no contractor-caused vehicle damage occurs.

Because the threshold is zero deviation from standard and no validated customer complaints, any verified incident of blocked access or vehicle damage constitutes a defect.

Performance Requirement Summary (PRS) 5 Requirement: When directed in writing by the CO, snow is hauled off-site within the timeframe stated in the direction, and hours invoiced match hours performed (PWS 5.1.3).

Method of Surveillance: 100% Inspection Measurement:

The COR will inspect each hauling order on completion and review the Contractor’s time records against the hours ordered and invoiced.

Performance is acceptable when hauling is completed within the stated timeframe, snow is disposed of off-site at a lawful location, and invoiced hours do not exceed hours performed or hours ordered.

Because the threshold is zero deviation from standard, any late completion or unsupported invoiced hours constitutes a defect.

4.2 Analysis and Results

When the inspections and customer feedback validations have been completed, the COR will perform an analysis of the Contractor’s performance. The purpose of the analysis is to ensure Government is receiving high-quality products and services from the Contractor. The COR will review the results, rate the Contractor’s compliance with the performance standards and AQLs, and characterize the Contractor’s overall performance. Analysis of all types of contract monitoring will result in one of the following outcomes:

Exceptional Performance consistently exceeds the contract requirements. Services are completed on time, no deficiencies are identified during surveillance, customer complaints are absent or rare, and corrective actions are not required. Contractor performance demonstrates a proactive commitment to quality and safety.

Acceptable Performance meets all contract requirements and performance thresholds identified in the PWS and PRS. Any deficiencies identified are minor, isolated, and corrected promptly upon notification. Customer complaints do not exceed the allowable thresholds established for each performance objective.

Marginal Performance occasionally fails to meet contract requirements or performance thresholds. Repeated minor deficiencies, delayed corrective actions, or increasing customer complaints indicate a negative trend that requires contractor attention. Continued marginal performance may result in issuance of a Corrective Action Request (CAR) and increased Government surveillance.

Unacceptable Performance fails to meet contract requirements or exceeds the allowable performance thresholds. Significant deficiencies, recurring defects, failure to perform required services, property damage, safety concerns, or failure to implement corrective actions constitute unacceptable performance. Unacceptable performance may result in rejection of services, payment withholding as authorized by the contract, issuance of a Cure Notice, or other contractual remedies.

Overall Performance Determination The COR will document surveillance observations throughout the performance period and determine the contractor's performance outcome based on the following:

Compliance with snow removal response requirements.

Compliance with parking lot, sidewalk, and dumpster accessibility requirements.

Protection of Government property, landscaping, utilities, and vehicles.

Number and validity of customer complaints.

Timeliness and effectiveness of corrective actions.

Consistency of performance throughout the season.

Contract performance will be considered acceptable when all PRS performance standards and performance thresholds are met.

Failure to meet any "Zero Deviation from Standard" requirement will be documented as a performance deficiency requiring corrective action.

Appendix A: Performance Requirements Summary The Performance Requirements Summary for this contract is Technical Exhibit 1 of the Performance Work Statement (Attachment 2). Section 4.1 of this QASP (PRS 1 through PRS 5) describes how each requirement will be surveilled. The forms in Appendices B through G may be used by the COR to document surveillance.

Appendix B: Example Discrepancy Report The following document is only an example, which is not all inclusive, that can be revised and used, if applicable, in the QASP as attachments or exhibits.

DISCREPANCY REPORT 1. DISCREPENCY REPORT NO.

2. TO: (Contractor / Project Manager Name) 3. FROM: (Name of COR)

CONTRACT NUMBER: D ATE:

PREPARED ORAL NOTIFICATION RETURNED BY CONTRACTOR ACTION COMPLETE

4. DISCREPENCY OR PROBLEM (Describe in Detail. Include PWS references. Attach Continuation Sheet if Necessary)

5. SIGNATURE OF COR

6. TO: (Name of COR) 7. FROM: (Contractor / Project Manager)

8. CONTRACTOR RESPONSE AS TO CAUSE, EFFECT, CORRECTIVE ACTION AND ACTIONS TO PREVENT RECURRENCE (Attach Continuation Sheet if necessary. Cite applicable Contractor QC program procedures or new QC procedures)

9. SIGNATURE OF CONTRACTOR REPRESENTIVE 10. DATE

11. GOVERNMENT EVALUATION (Acceptance, partial acceptance, or rejection. Attach Coordination Sheet if necessary)

12. GOVERNMENT ACTIONS (Cure notice, show cause, other)

CLOSE OUT

KTR NOTIFIED

NAME AND TITLE SIGNATURE DATE

COR

Appendix C: Customer Feedback Record The following document is only an example, which is not all inclusive, that can be revised and used, if applicable, in the QASP as attachments or exhibits.

CUSTOMER FEEDBACK RECORD

DATE AND TIME OF COMPLAINT CONTRACT NUMBER/ OR PROJECT:

SOURCE OF COMPLAINT

ORGANIZATION

INDIVIDUAL

NATURE OF COMPLAINT

PWS REFERENCE

VALIDATION

DATE AND TIME CONTRACTOR INFORMED OF COMPLAINT NAME OF CONTRACTOR REPRESENTATIVE INFORMED OF COMPLAINT

ACTION TAKEN BY CONTRACTOR (Responsible officer):

RECEIVED AND VALIDATED BY

Determination: Complaint Valid Complaint Invalid

Appendix D: Example Guide / Inspection List The following document is only an example, which is not all inclusive, that can be revised and used, if applicable, in the QASP as attachments or exhibits.

CONTRACT NUMBER: ___________________________________

SERVICE FUNCTION:

PWS SECTION:

1 Method of Surveillance:

2 Lot Size:

3 Sample Size:

4 Performance Requirement: Performance is Excellent (E) when ___________or fewer defects are discovered per month. Performance is Satisfactory (S) when ________ or fewer defects are discovered per month. Performance is Unsatisfactory (U) when _______ or more defects are discovered per month.

5 Sampling Procedure: Instructions on how to select the sample must be clear and complete

6 Inspection Procedure: The procedure must be detailed enough to allow a yes/no objective decision as to the acceptability of performance by anyone making the inspection. Explain when evaluation is to occur and what is acceptable/unacceptable

Performance: Excellent (E), Satisfactory (S), Unsatisfactory (U), Not Applicable (N/A)

PRS Requirements Timeliness Quality of Work Notes

Overall Rating Of Inspection (E, S, U or N/A)

COR/Inspector Comments:

Contractor Signature: ___ Date: __

COR Signature: ____________________ Date: _________________

Appendix E: Example Quality Assurance Monitoring The following document is only an example, which is not all inclusive, that can be revised and used, if applicable, in the QASP as attachments or exhibits.

CONTRACT NUMBER: ______________________________________

SERVICE or STANDARD:

SURVEY PERIOD:

SURVEILLANCE METHOD (Check the applicable item):

r Random Sampling r 100% Inspection r Periodic Inspection r Customer Complaint

LEVEL OF SURVEILLANCE (Check the applicable item):

r Monthly r Quarterly r As needed

PERCENTAGE OF ITEMS SAMPLED DURING SURVEY PERIOD: ______ %

ANALYSIS OF RESULTS:

Observed Service Provider Performance Measurement Rate: ______%

Service Provider’s Performance (Check the applicable item):

r Meets Standards r Does Not Meet Standards

Narrative of Performance During Survey Period:

Prepared By: _______________________________ Date: ______________

Appendix F: Example Customer Complaint Investigation The following document is only an example, which is not all inclusive, that can be revised and used, if applicable, in the QASP as attachments or exhibits.

CONTRACT NUMBER: _________________________

SERVICE or STANDARD:

SURVEY PERIOD: ___________________

DATE COMPLAINT RECEIVED: ____________

SOURCE OF COMPLAINT: _________________________________________ (Name) _______________________________________________________________ (Organization) ___________________ (Phone No.) _________________________________ (Email Address)

NATURE OF COMPLAINT:

RESULTS OF COMPLAINT INVESTIGATION:

DATE SERVICE PROVIDER INFORMED OF COMPLAINT: _____________

CORRECTIVE ACTION TAKEN BY SERVICE PROVIDER:

Received and Validated By: __________________________________________ Prepared By: _____________________________ Date: _________________

Appendix G: Example Surveillance Activity Checklist The following document is only an example, which is not all inclusive, that can be revised and used, if applicable, in the QASP as attachments or exhibits.

Performance Requirement

Performanc e

Standard

Method of Measurement

Performance Metrics

Method of Surveillance

Date Accomplished

Compliance (Exceed, Met, Partial Met)

Project Name
Solicitation / Contract Number
Section 1: Introduction
1.1 Purpose
1.2 QASP Relation to the Contract
1.2.1 QASP Revisions
1.2.2 Surveillance of Performance Progression
1.3 QASP Relation to the Quality Control Plan (QCP)
Section 2: Performance Description
2.1 Performance Standards and Acceptable Quality Levels (AQLs)
2.1.1 Allowable Deviation
2.1.2 Substantially Complete
2.2 Non-Performance
2.2.1 Documentation
2.2.2 Remedial Actions
Section 3: Contractor and Government Responsibilities
3.1 Contractor Responsibility
3.2 Government Responsibility
3.2.1 Contracting Officer (CO)
3.2.2 Contracting Officer Representative (COR)
3.2.3 Customers
Section 4: Surveillance Methods to Perform Quality Assurance
4.1 Surveillance Methods
4.2 Analysis and Results
Appendix A: Performance Requirements Summary
Appendix B: Example Discrepancy Report
Appendix C: Customer Feedback Record
Appendix D: Example Guide / Inspection List
Appendix E: Example Quality Assurance Monitoring
Appendix F: Example Customer Complaint Investigation
Appendix G: Example Surveillance Activity Checklist

File details come from the government source that posted it. Updated .