This is a Performance Work Statement (PWS) for snow removal services at the Sopris Ranger Station administrative site in Carbondale, Colorado, issued by the United States Department of Agriculture Forest Service.

The contractor shall provide comprehensive snow removal services including plowing and shoveling of all paved parking areas and sidewalks at 620 Main Street, Carbondale, CO 81623 (approximately 950 linear feet of sidewalk and 0.5-acre parking lot). Snow removal is triggered when accumulation meets or exceeds 2 inches in a 12-hour period, with completion required by 7:00 AM on business days. Public sidewalks must be cleared within 24 hours after snowfall ends, including weekends and federal holidays, as required by Town of Carbondale ordinance. The contractor shall remove snow to bare pavement or gravel, protect landscaping and utilities, maintain at least 99% of parking spaces availability, keep dumpster areas accessible, and assume liability for vehicle damage caused by snow plow operations. Snow hauling off-site is an optional line item performed only when directed in writing by the Contracting Officer. The contract is a Firm Fixed Price purchase order with pricing structured per snow event at fixed unit prices for each snowfall range (2.0-5.9, 6.0-8.9, 9.0-11.9, 12.0-14.9, and 15+ inches), and hourly rates for optional hauling services. The base period runs from December 15, 2026 (or award date, whichever is later) through April 30, 2027, with four six-month option years extending through April 2031. The contractor must develop and maintain a written Quality Control Program addressing snowfall monitoring, personnel and equipment dispatch (including backup resources), and deficiency correction. Performance is evaluated against five key objectives including timely snow and ice removal for safe vehicle and pedestrian use, maintenance of parking spaces and dumpster access, protection of property and landscaping, prevention of vehicle damage, and completion of off-site hauling within directed timeframes. All materials, supplies, and equipment must comply with OSHA, EPA, and local codes, with biobased de-icers (minimum 93% biobased content) preferred and required reporting of biobased product purchases.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

United States Department of Agriculture – Forest Service

PERFORMANCE WORK STATEMENT (PWS)

Sopris Ranger Station Snow Removal

Part 1 - General Information

1. General: This is a non-personal services contract to provide Snow Removal. The Government shall not exercise any supervision or control over the contract service providers performing the services herein. Such contract service providers shall be accountable solely to the Contractor who, in turn is responsible to the Government.

1.1 Description of Services/Introduction: The Contractor shall provide all personnel, equipment, tools, materials, transportation, employee training and insurance as specified herein. Training and performance of this contract shall include and comply with all applicable OSHA, EPA, local, State and Federal codes, mandates, and standards. Supplies and materials shall be of a quality and type customarily utilized by current industry standards and equipment ratings and shall be subject to the approval of the Contracting Officer (CO) or Contracting Officer’s Representative (COR) (industry standards only applicable where they do not violate any of the aforementioned codes/mandates). The Contractor shall at all times provide adequate supervision of employees ensuring all required services are accomplished in accordance with the terms and conditions of the contract. Contractor shall ensure all Snow removal is accomplished to ensure the safety of all individuals at the service locations.

1.2 Background: The Sopris Ranger District office is in need of snow removal services at the Administrative site located at 620 Main Street, Carbondale, CO.

1.3 Objectives: Remove excessive snow from parking lots and shovel all sidewalks. Result of the services performed is a neat, safe, and professional-looking site representing the United States Forest Service to the public.

1.4 Scope: Remove excessive snow from parking lots and parking areas (non-paved) and all sidewalks. This includes removing packed snow and any built-up ice on sidewalks and applying salt (or other de-ice) as needed. Off-site snow hauling is performed only when directed in writing by the Contracting Officer (see paragraph 5.1.3).

1.5 Period of Performance: The period of performance shall be for one (1) Base Period and four

(4) 6-month option years. The Period of Performance reads as follows:

BASE PERIOD: 15 Dec 2026 (or date of award, whichever is later) – 30 Apr 2027 OPTION ONE: 01 Nov 2027 – 30 Apr 2028 OPTION TWO: 01 Nov 2028 – 30 Apr 2029 OPTION THREE: 01 Nov 2029 – 30 Apr 2030 OPTION FOUR: 01 Nov 2030 – 30 Apr 2031

1.6 General Information

1.6.1 Quality Control: The contractor shall develop and maintain an effective quality control program (QCP) to ensure services are performed in accordance with this PWS. The contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. The contractor’s quality control program is the means by which they assure themselves that their work complies with the requirement of the contract. A written QCP shall be

Sopris Ranger Station Snow Removal PWS submitted with the contractor’s quotation. The QCP may be brief (one to two pages) and shall describe how the contractor will monitor snowfall, dispatch personnel and equipment (including backup equipment and personnel), confirm work is complete by the required times, and correct deficiencies. Updates shall be submitted to the CO and COR within 5 working days when changes are made thereafter. After acceptance of the quality control plan the contractor shall receive the contracting officer’s acceptance in writing of any proposed change to the QC system.

1.6.2 Quality Assurance: The government shall evaluate the contractor’s performance under this contract in accordance with the Quality Assurance Surveillance Plan (Attachment 3). This plan is primarily focused on what the Government must do to ensure that the contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and the minimum acceptable defect rate(s).

1.6.3 Federal Holidays and Weekends: Contractor is not required to perform services on these days, except as stated below for public sidewalks. If Snowfall does occur on a Federal Holiday or weekend, snow removal shall still be completed prior to 7:00 a.m. of the next business day.

Public sidewalks adjacent to the property (see Technical Exhibit 2) shall be cleared within 24 hours after snowfall ends, including on weekends and Federal Holidays, as required by Town of Carbondale ordinance.

New Year’s Day Labor Day Martin Luther King Jr.’s Birthday Columbus Day President’s Day Veteran’s Day Memorial Day Thanksgiving Day Juneteenth National Independence Day Christmas Day Independence Day

1.6.4 Hours of Operation: For snow removal, plowing and shoveling will be completed by 7:00 am on business days, or throughout the day if substantial snow falls, within the performance period identified in 1.5. Weekends and Federal Holidays are addressed in 1.6.3.

The Contractor must at all times maintain an adequate workforce for the uninterrupted performance of all tasks defined within this PWS. When hiring personnel, the Contractor shall keep in mind that the stability and continuity of the workforce are essential.

1.6.5 Place of Performance: The work to be performed under this contract will be performed at the Carbondale administrative site of the Aspen-Sopris Ranger District. The Carbondale site is located at 620 Main Street, Carbondale, CO 81623. See Technical Exhibit 2 for an illustration of the site. The site includes approximately 950 linear feet of sidewalk and an approximately 0.5-acre parking lot; quantities are approximate and provided for pricing purposes.

1.6.6 Type of Contract: The government will award a Firm Fixed Price purchase order with four Option Years. Snow removal is priced per snow event at the fixed unit price for each snowfall range (2.0-5.9, 6.0-8.9, 9.0-11.9, 12.0-14.9, and 15 or more inches) in the Schedule of Items.

Snow hauling, if required, is an optional line item priced at a fixed hourly rate (see paragraph 5.1.3).

1.6.7 Post Award Conference/Periodic Progress Meetings: The Contractor agrees to attend any post award conference convened by the contracting activity or contract administration office in accordance with Federal Acquisition Regulation Subpart 42.5. The Contracting Officer, Contracting Officers Representative (COR), and other Government personnel, as appropriate, may meet periodically with the contractor to review the contractor's performance. At these meetings the contracting officer will apprise the contractor of how the government views the contractor's performance and the contractor will apprise the Government of problems being experienced, if any. Appropriate action shall be taken to resolve outstanding issues. These meetings shall be at no additional cost to the government.

1.6.8 Contracting Officer Representative (COR): The (COR) will be identified separately from the PWS. The COR monitors all technical aspects of the contract and assists in contract administration. The COR is authorized to perform the following functions: assure that the Contractor performs the technical requirements of the contract: perform inspections necessary in connection with contract performance: maintain written and oral communications with the Contractor concerning technical aspects of the contract: issue written interpretations of technical requirements, including Government drawings, designs, specifications: monitor Contractor's performance and notify both the Contracting Officer and Contractor of any deficiencies;

coordinate availability of government furnished property, and provide site entry of Contractor personnel. A letter of designation issued to the COR, a copy of which is sent to the Contractor, states the responsibilities and limitations of the COR, especially regarding changes in cost or price, estimates or changes in delivery dates. The COR is not authorized to change any of the terms and conditions of the resulting order.

1.6.9 Identification of Contractor Employees: All contract personnel working in other situations where their contractor status is not obvious to third parties are required to identify themselves as such to avoid creating an impression in the minds of members of the public that they are Government officials. They must also ensure that all documents or reports produced by contractors are suitably marked as contractor products or that contractor participation is appropriately disclosed.

1.6.10 Organizational Conflict of Interest: Contractor and subcontractor personnel performing work under this contract may receive, have access to or participate in the development of proprietary or source selection information (e.g., cost or pricing information, budget information or analyses, specifications, or work statements, etc.) or perform evaluation services which may create a current or subsequent Organizational Conflict of Interests (OCI) as defined in FAR Subpart 9.5. The Contractor shall notify the Contracting Officer immediately whenever it becomes aware that such access or participation may result in any actual or potential OCI and shall promptly submit a plan to the Contracting Officer to avoid or mitigate any such OCI. The Contractor’s mitigation plan will be determined to be acceptable solely at the discretion of the Contracting Officer and in the event the Contracting Officer unilaterally determines that any such OCI cannot be satisfactorily avoided or mitigated, the Contracting Officer may effect other remedies as he or she deems necessary, including prohibiting the Contractor from participation in subsequent contracted requirements which may be affected by the OCI.

1.6.11 Security: The Contractor shall report any hazardous conditions to the COR, turn in lost and found articles to the COR. Contractor shall report any items in need of repair to the COR. In the event that there is an onsite emergency and the premises need to be evacuated, the Contractor’s employees shall comply with the evacuation as directed by the competent authority, such as the COR, law enforcement officers, or fire officials.

1.6.12 Contract Authority: Except as specified herein, no order, statement, or conduct of Government personnel who visit the Contractor’s facilities or in any other manner communicate with Contractor personnel during the performance of this contract shall constitute a change under the “Changes” clause of this contract. The Contractor shall not comply with any order, direction or request of Government personnel unless it is issued in writing and signed by the Contracting Officer or is pursuant to specific authority otherwise included as part of this contract. The Contracting Officer is the only person authorized to approve changes in any of the requirements of this contract and notwithstanding provisions elsewhere in this contract, the said authority remains solely with the Contracting Officer. In the event the Contractor effects any change at the direction of any person other than the Contracting Officer, the change will be considered to have been made without authority and no adjustment will be made in the contract price to cover any increase in charges incurred as a result thereof. In the event the contract administration is transferred to a new Contracting Officer, notification to all parties concerned shall be provided within 30 days of the change.

1.6.13 Biobased Products: The Contractor shall comply with the Farm Security and Rural Investment Act of 2002 and the Energy Policy Act of 2005 (7 U.S.C. 8102(c)(3)) as required under the clauses at FAR 52.223-2, Reporting of Biobased Products Under Service and Construction Contracts, and FAR 52.223-23, Sustainable Products and Services (see the solicitation clauses).

1.6.13.1 Use of biobased products: The use of biobased products by prospective offerors shall be utilized over any non-biobased product of equal value.

1.6.13.2 Examples of acceptable Biobased products: A complete list of acceptable Biobased products can be found at: www.biopreferred.gov. Following is an example list of products that may be used in this contract for which biobased products are available. The list is an example only and is not all inclusive. It is desirable that vendors be able to supply the greatest number of biobased products listed meeting health and environmental specifications.

• 2-cycle engine oil

• Penetrating lubricants

• Hydraulic fluids

• Greases

• Absorbents

• Diesel fuel additives

• De-icers

1.6.13.3 De-icers: De-icers and anti-icers are a USDA-designated biobased product category.

To qualify as biobased, a de-icer must contain at least 93% biobased content. Qualifying products are listed in the USDA BioPreferred Catalog at www.biopreferred.gov. If the Contractor determines that a qualifying de-icer is not reasonably available, is not reasonably priced, or will not perform adequately at the site, the Contractor shall notify the COR before using a non-biobased product.

1.6.13.4 Reporting: FAR 52.223-2 requires the Contractor to report the product types and dollar value of biobased products purchased in USDA-designated product categories (for example, de-icers and lubricants) to www.sam.gov, with a copy to the Contracting Officer, by October 31 of each year during contract performance and at the end of contract performance.

1.6.14 Invoicing: As of February 1st, 2008, the FS utilizes the Invoice Processing Platform (IPP) www.ipp.gov for the electronic submission and tracking of purchase orders, invoices, and payment information to its suppliers of goods and services. IPP is a secure Government-wide, Web-based invoice processing service offered free of charge to Government Agencies and their suppliers. The contractor will attach within the IPP system a hard copy electronic Invoice complete with company letterhead in addition to filling out all Invoice requirements within the IPP System. Once the IPP Invoice is submitted, the COR will review and forward with recommends to the CO for approval and acceptance, at which point the CO will reject or approve and forward the invoice within IPP for submission of payment directly into the contractors’ bank account through the National Finance Center.

1.6.14.1 Monthly payments: Payments will be made at the end of each month for actual services rendered and IAW with the Prompt Payment Act. Each invoice shall list each snow event performed during the month by date and snowfall range, at the unit price in the Schedule of Items, as verified by the COR. Any invoice received before the last day of the month will be rejected and the contractor will be required to resubmit. Prompt Payment Act time clock will not start until a proper invoice is received and accepted by the Government.

1.6.14.2 Snow hauling: Snow hauling directed under paragraph 5.1.3 shall be invoiced separately at the fixed hourly rate for the hours actually performed, not to exceed the hours ordered, and shall include the contractor’s time records.

PART 2 - DEFINITIONS & ACRONYMS

2. DEFINITIONS AND ACRONYMS:

2.1 Definitions:

2.1.1 Contractor: A supplier or vendor awarded a contract to provide specific supplies or service to the government. The term used in this contract refers to the prime.

2.1.2 Contracting Officer: A person with authority to enter into, administer, and/or terminate contracts, and make related determinations and findings on behalf of the government. Note:

The Contracting Officer is the only individual who can make changes to the contract and who can legally bind the government.

2.1.3 Contracting Officer Representative: An employee of the U.S. Government appointed by the contracting officer to administer the contract. Such appointment shall be in writing and shall state the scope of authority and limitations. This individual has authority to provide technical direction to the Contractor if that direction is within the scope of the contract, does not constitute a change, and has no funding implications. This individual does NOT have authority to change the terms and conditions of the contract.

2.1.4 Defective Service: A service output that does not meet the standard of performance associated with the Performance Work Statement.

2.1.5 Deliverable: Anything that can be physically delivered but may include non-manufactured things such as meeting minutes or reports.

2.1.6 Key Personnel: Contractor personnel that are evaluated in a source selection process and that may be required to be used in the performance of a contract by the Key Personnel listed in the PWS. When key personnel are used as an evaluation factor in best value procurement, an offer can be rejected if it does not have a firm commitment from the persons that are listed in the proposal.

2.1.7 Physical Security: Actions that prevent the loss or damage of Government property.

2.1.8 Quality Assurance: The government procedures to verify that services being performed by the Contractor are performed according to acceptable standards.

2.1.9 Surveillance Plan (QASP): An organized written document specifying the surveillance methodology to be used for surveillance of contractor performance.

2.1.10 Quality Control: All necessary measures taken by the Contractor to assure that the quality of an end product or service shall meet contract requirements.

2.1.11 Subcontractor: One that enters into a contract with a prime contractor. The Government does not have privity of contract with the subcontractor.

2.1.12 Workday: The number of hours per day the Contractor provides services in accordance with the contract.

2.1.13 Work Week: Sunday through Saturday, unless specified otherwise.

2.1.14 Aspen Sopris Ranger District Office: Also known as the Sopris Ranger Station is the administrative site and office complex located at 620 Main Street, Carbondale, CO, and all the structures within. This includes the office building, shop and shed.

2.1.15 Business Day: Monday through Friday, excluding Federal Holidays.

2.2. Acronyms:

ACOR Alternate Contracting Officer's Representative AGAR Department of Agriculture Acquisition Regulations CCE Contracting Center of Excellence CFR Code of Federal Regulations CONUS Continental United States (excludes Alaska and Hawaii) COR Contracting Officer’s Representative COTS Commercial-Off-the-Shelf FAR Federal Acquisition Regulations FFP Firm-Fixed Price FSAR Forest Service Acquisition Regulation HIPAA Health Insurance Portability and Accountability Act of 1996 CO Contracting Officer IPP Invoice Processing Platform OCI Organizational Conflict of Interest OCONUS Outside Continental United States (includes Alaska and Hawaii) ODC Other Direct Costs PIPO Phase In/Phase Out POC Point of Contact

PRS Performance Requirements Summary PWS Performance Work Statement QA Quality Assurance QAP Quality Assurance Program QASP Quality Assurance Surveillance Plan QC Quality Control QCP Quality Control Program TE Technical Exhibit USDA United States Department of Agriculture

PART 3 - GOVERNMENT FURNISHED PROPERTY, EQUIPMENT, AND SERVICES

3. GOVERNMENT FURNISHED ITEMS AND SERVICES:

3.1 Services: None.

3.2 Facilities: None.

3.3 Utilities: None.

3.4 Equipment: None.

3.5 Materials: None.

PART 4 - CONTRACTOR FURNISHED ITEMS AND SERVICES

4. CONTRACTOR FURNISHED ITEMS AND RESPONSIBILITIES:

4.1 General: The Contractor shall furnish all supplies, equipment, personnel, and services required to perform work under this contract that are not listed under Section 3 of this PWS. If a piece of equipment needs repair or is determined unsafe by the COR, the Contractor shall immediately stop using the equipment and shall repair or replace within 72 hours.

4.2 Government Responsibilities: The Government will not be responsible for damage occasioned by fire, theft, accident, or otherwise to the Contractor's supplies, materials, or equipment in storage, or the Contractor's and their employee's personal belongings.

4.3 Contractor Responsibilities: The Contractor is responsible for loss, theft, damage, or destruction of any Government or personal items belonging or assigned to Forest Service employees when such loss, theft, damage, or destruction is caused by the Contractor or one of their employees.

4.4 Fire Prevention: Fire prevention shall be exercised at all times by the Contractor and employees. All combustible material shall be used and stored in a safe manner. Contractor shall report to the COR/CO any fire hazards.

4.5 Federal Regulations: Full compliance with all Federal, State, Local, USDA and Forest Service regulations is required.

4.6 Codes and Standards: The work of this contract shall be done in accordance with all applicable local codes and industry standards to include any safety requirements established by the Occupational Safety and Health Act (OSHA)

4.7 Environmental Protection Agency (EPA): Full compliance with environmental and hazardous waste management laws, rules, and regulations is applicable.

4.8 Federal, State, and Local Codes and Laws: All chemicals used will be those commercially available which meet Federal, State, and local codes and which have been approved by the

COR/CO.

PART 5 - SPECIFIC TASKS

5. Specific Tasks

5.1 Basic Services.

5.1.1 At the Sopris Ranger Station, the contractor shall plow/shovel snow from all paved areas, parking areas, and sidewalks whenever snowfall accumulation meets or exceeds 2 inches or more in a 12 hour period. Plowing and snow shoveling/blowing will be completed by 7:00 AM, on business days (see paragraph 1.6.3 for weekends, Federal Holidays, and public sidewalks).

Should snowfall continue to accumulate upon the premises throughout the day, after the initial morning clearing, the Contractor shall clear the primary site traffic-ways throughout the day for each additional 3 inches of snowfall accumulated. Once snowfall ends, the Contractor shall return after normal office hours to clear the remaining portion of the parking lot and sidewalks, to be completed by 7:00 a.m. the following business day. Period of performance is stated in paragraph 1.5. Parking lots and entrances shall be plowed so that snow is not piled onto sidewalks or walkways nor block the pedestrian use of sidewalks or walkways. All paved and non-paved parking areas shall have snow removed to the bare pavement or gravel with no trailing windrows left in these areas. All parking spaces shall be cleared of snow and available for parking until the contractor and COR agree to begin using secondary storage sites. Snow shall be pushed into designated areas so that landscaping, trees, shrubs, sprinkler heads, improvements and utilities are protected. See Technical Exhibit 2.

5.1.1.1 Dumpsters: All snow shall be removed from around the dumpsters to allow for pedestrian access for the disposal of refuse. No snow shall be placed in front of the dumpsters nor block the area so that snow accumulation impedes trash removal service.

5.1.1.2 Snow Removal Operations: Snow removal shall include the clearing of snow from designated driveways, parking areas, and sidewalks by pushing and piling snow into adjacent areas as designated by the US Forest Service and shown in Technical Exhibit 2. No snow piles shall be left in the plowed areas. The parking areas shall not have a reduction of more than 1 percent of parking spaces at the end of the operations, in reference to the parking conditions available at the beginning of the snow season. At the parking lot entrances and exits, the snowbanks shall not exceed three (3) feet high in these areas. Snowbanks shall be pushed back or snow removed to meet these standards, except that snow may not be pushed or piled onto the streets or sidewalks, according to the Town of Carbondale ordinances.

When cars are present in parking lots or other areas of snow removal at the time of operations, the Contractor shall remove snow in adjacent parking spaces, as practical. The Contractor shall not block vehicles with snow piles or banks and assumes liability for damage to vehicles caused by snowplow operations.

5.1.2 Snow Storage: Snow shall be placed in the primary snow storage area shown in Technical Exhibit 2. The secondary snow storage area shall be used only when the contractor and COR agree. The contractor shall notify the COR when the storage areas are nearing capacity. Pushing and piling snow into the on-site storage areas is included in the per-event unit prices.

5.1.3 Snow Hauling (Optional Line Item): If the on-site storage areas cannot hold additional snow, the Contracting Officer may direct, in writing, that snow be hauled off-site. The contractor shall not haul snow off-site unless directed in writing by the Contracting Officer; hauling that is not directed in writing will not be paid. When directed, the contractor shall furnish the loader(s), truck(s), and operators, haul snow to a lawful disposal site obtained by the contractor, and complete hauling within the timeframe stated in the direction. Hauling is paid at the fixed hourly rate in the Schedule of Items for hours actually performed, not to exceed the hours ordered. The hourly rate includes all equipment, operators, fuel, travel, and disposal fees.

PART 6 - INSPECTION AND ACCEPTANCE

6. Inspection and Acceptance: Inspection and acceptance of services will be performed by the Contracting Officer or the COR at the place of performance in accordance with FAR 52.212- 4(a), Inspection/Acceptance, included in the contract. The Government may require reperformance of nonconforming services at no increase in contract price. Performance will be evaluated using the Performance Requirements Summary (Technical Exhibit 1) and the QASP (Attachment 3).

PART 7 - APPLICABLE PUBLICATIONS

7. APPLICABLE PUBLICATIONS (CURRENT EDITIONS)

7.1. The Contractor must abide by all applicable regulations, publications, manuals, and local policies and procedures.

PART 8 TECHNICAL EXHIBIT LISTING

8. Technical Exhibit List:

8.1 Technical Exhibit 1: Performance Requirements Summary

8.2 Technical Exhibit 2: Map of Carbondale Locations with snow removal and storage areas highlighted.

TECHNICAL EXHIBIT 1

Performance Requirements Summary

The contractor service requirements are summarized into performance objectives that relate directly to mission essential items. The performance threshold briefly describes the minimum acceptable levels of service required for each requirement. These thresholds are critical to mission success.

Performance Objective

(The Service required— usually a shall statement)

Standard Performance Threshold

(This is the maximum error rate.

It could possibly be “Zero deviation from standard”)

Method of Surveillance

PRS # 1.

The contractor shall provide services for removal of snow and ice from all parking lots and sidewalks by 7:00 AM on business days after every accumulation of two inches or greater in a 12-hour period, and from public sidewalks within 24 hours after snowfall ends (all days).

The contractor provided snow and ice removal to a level acceptable for non-off-road vehicles to operate safely and pedestrian traffic to walk safely from vehicles to the sidewalks and building entries during the performance period.

Zero deviation from standard

Periodic surveillance of snow accumulation at

7:00 AM.

No more than 2 validated customer complaints per service month.

PRS # 2

The contractor shall ensure all parking spaces and the dumpster areas are cleared of snow and available for parking and trash removal.

The contractor maintained the available number of parking spaces and an area around the dumpsters.

No more than 1% of parking spaces are removed, and the dumpster area is not blocked by accumulated snow.

Periodic surveillance of the dumpster area.

No more than 2 validated customer complaints per service month.

PRS # 3

The contractor shall remove snow from parking areas in a manner that protects landscaping, grass, trees, shrubs, sprinkler heads, improvements and utilities, and yet still allows pedestrian use of sidewalks and walkways.

The contractor removed snow without damage to government property/facilities and did not block sidewalks and walkways with snow piles or windrows.

Zero deviation from standard

Periodic surveillance

PRS # 4

The Contractor shall not block vehicles with snow piles or banks and shall not damage vehicles when conducting services.

The contractor removed snow without damaging vehicles and did not block vehicles with snow piles.

Zero deviation from standard

Periodic surveillance.

No validated customer complaints.

Performance Objective

(The Service required— usually a shall statement)

Standard Performance Threshold

(This is the maximum error rate.

It could possibly be “Zero deviation from standard”)

Method of Surveillance

PRS # 5

When directed in writing by the Contracting Officer, the contractor shall haul snow off-site within the timeframe stated in the direction.

The contractor completed hauling within the stated timeframe, and hours invoiced matched hours performed.

Zero deviation from standard

100% inspection of each hauling order.

TECHNICAL EXHIBIT 2

Sopris Ranger District – 620 Main Street, Carbondale, CO 81623