About this file
This is a Questions and Answers document clarifying requirements for solicitation 1240LP27Q0003, a Request for Quotation issued by the Department of Agriculture Forest Service for the Rio Grande National Forest to procure three commercial concrete double vault toilets for Trujillo Meadows.
The key clarifications address contractor responsibilities and procurement terms. Small businesses may submit toilets produced by any manufacturer regardless of manufacturer size, as neither the Nonmanufacturer Rule nor Limitations on Subcontracting clauses apply. The contractor is responsible only for delivering and placing the three ADA-compliant toilet buildings on government-excavated sites using a delivery crane; the Forest Service retains responsibility for all site preparation, excavation, grading, backfill, and connections. Delivery is required by July 15, 2027, though the Forest Service notes that Forest Service Road 118 and Trujillo Meadows are historically open by June for heavy equipment access and expressed willingness to work with the contractor on delivery timing if weather conditions delay site access. The solicitation contains a single line item for three units with no option periods. Invoices must be submitted electronically through the Invoice Processing Platform, and Fast Payment Procedures under FAR 52.232-90 apply to this order. This is a total small business set-aside acquisition with a small business size standard of 500 employees, classified under NAICS code 327390.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 1240LP27Q0003 0001 SF-30.pdf | ||
| Attachment 2 - FS-Schedule of Items GAOA Trujillo Meadows Revised.xlsx | XLSX spreadsheet | |
| Attachment 1 - SOW GAOA Toilet Replacements Trujillo Meadows v2 Revision.docx | DOCX document | |
| Attachment 2 - FS-Schedule of Items GAOA Trujillo Meadows.xlsx | XLSX spreadsheet | |
| 1240LP27Q0003 1449 with Clauses and Provisions.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1240LP27Q0003
Toilet Building Replacement Trujillo Meadows 10/13/2026 Questions and Answers
1. Clause 52.219-33 (Nonmanufacturer Rule) and 52.219-14 (Limitations on Subcontracting) are not checked. Please confirm that a small business may offer a domestic concrete double vault toilet produced by any manufacturer, regardless of the manufacturer's size.
Neither 52.219-33 nor 52.219-14 apply to this procurement. A small business may submit a toilet that is produced by any manufacturer.
2. SOW 5.0 asks for the "ability to install on prepared sites." Please confirm that placement means setting each building on the Government-excavated site with the delivery crane, and that backfill, grading and any connections remain with the Forest Service (SOW 4.0).
4.0 Yes - 4.0 Government Furnished
The U.S. Forest Service will excavate and finalize the sites, so the Contractor will only be required to deliver and place the double vault toilets at the designated areas. The Contractor is not responsible for site preparation, excavation, grading, or finishing.
5.0 Contractor Furnished states:
Contractor will furnish 3 accessible concrete double vaults toilets and ability to install on prepared sites.
5.0 There should be no connections, but placing the vault toilet in the hole is the contractor’s responsibility.
3. The SF-1449 continuation requires delivery by July 15, 2027, while Attachment 2 shows "180 Days ARO." Which date governs, and what is the earliest date Forest Service Road 118 and the Trujillo Meadows sites are normally open for heavy trucks and a crane? July 15, 2027 is the date for delivery. Historically the road and the campground are open by June, so the access to the site by July 15th should be a safe bet. But we can’t guarantee it if we have an unusual winter. But we are willing to work with contractor on the delivery date.
4. The price evaluation paragraph refers to option periods and FAR 52.217-8. Please confirm the requirement is the single line item 0001 (3 EA) with no option periods. There are no options on this RFQ.
5. Please confirm invoices will be submitted electronically through the Invoice Processing Platform (AGAR 452.236-70) and whether 52.232-90 Fast Payment Procedures applies to this order.
Invoices will be submitted through IPP. 52.232-90 Fast Payment Procedures is listed under Other Applicable Clauses and does apply to this solicitation.
File details come from the government source that posted it. Updated .