Pit Toilet Decommissioning - SERVICE Federal contract opportunity
Solicitation number
1240BK24Q0130
Issued by
Department of Agriculture Forest Service R6-Pacific Northwest Region

About this file

This document is an amendment to a solicitation for the Pit Toilet Decommissioning - SERVICE project on the Willamette National Forest.

The key changes in this amendment include:

  • Reducing the quantity of Pay Item 0001 from 5 to 4 pit toilets
  • Moving the Clear Lake pit toilet to its own separate line item (0004) due to more complex work required
  • Deleting Item 0002 for the Campers Flat pit toilet
  • Requesting a new Schedule of Items due to the changes
  • Providing responses to 13 contractor questions, including clarifying details on the toilet sizes, waste handling, and work site conditions

The period of performance is from the award date to November 20, 2024, with an estimated start date in early October 2024. Contractors are encouraged to conduct site visits to confirm the pit toilet details. The overall project is being solicited by the USDA Forest Service Region 6 - Pacific Northwest Region.

View the file

Other files for this federal contract opportunity

Other files attached to Pit Toilet Decommissioning - SERVICE, newest first.
File Type Posted
AMENDMENT 002.pdf PDF
Complete Solicitation.zip ZIP file

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

Previous edition unusable

Amendment No. 001 - Pit Toilet Decommissioning - SERVICE continuation of Standard Form 30 (Block 14)

This amendment makes the following changes:

The quantity of Pay Item 0001 is reduced from 5 to 4. Clear Lake is moved to its own Line Item as mentioned below.

Delete Item No. 0002 (Pit Toilet Decommission - Campers Flat - OPTIONAL ITEM).

Add Item No. 0004 (Pit Toilet Decommission – Clear Lake - OPTIONAL ITEM). This was initially included with Pay Item 0001. Clear Lake has more work involved compared to the others, so it seemed more appropriate to include it by itself.

If you have already submitted your quote, you will not need to complete the following Schedule of Items to submit your quote. The initial Schedule of Items is not acceptable. We are requesting this due to the reduced mobilization work and clarification of work required for Item No. 0004. The other pages of the “Packet to Return” still need to be completed.

Contractor: Issuing Office/Unit:

Name: Solicitation No.:

Email: Issue Date:

Phone: Quote Due Date:

ITEM No. EST.

QUANTITY UNIT AMOUNT

0001 4 Each

0003 1 Lump Sum

0004 1 Each

9/9/2024

PROJECT NAME: Pit Toilet Decommissioning - SERVICE

1240BK

1240BK24Q0130

Email Quotation to: lorenzo.montoya@usda.gov

Pit Toilet Decommission

Work Location: Willamette NF Unique Entity ID SAM:

SCHEDULE OF ITEMS

SCHEDULE OF SUPPLIES/SERVICES UNIT

PRICE

Mobilization (for all 5 pit toilets) Pit Toilet Decommission - Clear Lake -

OPTIONAL ITEM

Estimated Start Work: Early October 2024 Period of Performance: Award Date to November 20th, 2024

9/19/2024

TOTAL

This amendment provides Questions and Answers as shown below.

Contractor Question 1

“Have the toilets been pumped and sewage removed?”

Government Response:

No. Leave Human waste and back fill hole with surrounding soil mound soil to allow time for waste to infiltrate.

Contractor Question 2

“We did a site visit and noted one of the pit toilets has a metal pipe (about 3 feet in diameter) that holds the drain/waste products. Do we need to remove this pipe or leave it in?”

Government Response:

Remove and dispose of metal pipe off forest lands. Leave Human waste and back fill hole with surrounding soil mound soil to allow time for waste to infiltrate.

Contractor Question 3

“The Clear Lake shows a double toilet. Inside has fiberglass and the base has more concrete. It appears different from the other structures so I want to clarify if we have the correct information.”

Government Response:

Remove and recycle/dispose of concrete and fiberglass. Contractors are encouraged to conduct site visits to confirm the size and depth of the concrete.

Contractor Question 4

“Downing Creek (1 Pit toilet) • Location Coordinates: (44.575988, -122.983316)

The coordinates do not match the picture. Downing Creek is not near the stated coordinates. Looking for clarification, where is the location of Toilet F?”

Government Response:

Typo in the coordinates. Should be 44.575988, -121.983316.

Contractor Question 5

“I just read through the Fire Protection and Suppression document. On page 7, this sentence is highlighted:

"The Contractor shall provide a tank truck or trailer, containing not less than 300 gallons of water, during yarding, loading, land clearing, right-of-way clearing and mechanical treatment of slash."

These seem to all be logging-related activities and not applicable to this contract. Can you confirm whether a tank truck/trailer is required for the Pit Toilet Decommission?”

A water tank truck or trailer is not applicable/required for the Pit Toilet Decommission.

Contractor Question 6

“Can you tell me the dimensions of the pit toilet buildings?”

Contractors are encouraged to conduct site visits to confirm the sizes of the pit toilets.

Contractor Question 7

“I noticed there was an update to the above mentioned solicitation, but I could not find any changes. Is there anything different?”

Government Response:

The update alert you may have received was likely an update to CO’s email address in the point of contact information. The CO updated the email address from an old email address to a new one.

Contractor Question 8

“Do any of these toilets have human waste in them?”

Government Response:

Yes. Leave Human waste and back fill hole with surrounding soil mound soil to allow time for waste to infiltrate.

Contractor Question 9

“Are they all the same construction and size? Like Marion Guard?”

Government Response:

Pit toilets should be similar in construction and size. Contractor is encouraged to conduct site visits are encouraged to confirm the construction and sizes of the pit toilets.

Contractor Question 10

“In the event of heavy snow, will extra time be granted to allow the snow to clear?”

Government Response:

We can add time for “unusual severe weather” if the Contractor has made efforts to start within a reasonable amount of time and is proceeding with work at a pace which would likely allow for work to be completed within the contract Period of Performance.

Contractor Question 11

Thank you for sending us a heads up on this project. We are definitely interested in this project, I'm trying to figure out if/how it will fit in our schedule. Is there any chance that the completion date could be pushed back to next spring/early summer?

Government Response:

You can submit an alternate quotation. To do that, you could submit your quotation in two batches.

One that falls in line with everything being requested and the second with your “alternate quotation”.

We prefer this year, but if no one can do it this year, next year may be the only option. Based on the total questions received so far, I believe it’s likely that someone will be able to meet our timelines.

Contractor Question 12

The Fire Protection & Suppression attachment has highlighted that the contractor must have 2-way communication to report a fire. Can you tell me if any/all of these locations have cell phone reception for Verizon at the location or within a 15 minute drive?

Government Response:

Refer to your mobile carrier’s coverage map for a better idea if area is covered. Actual coverage may not match the map exactly.

Contractor Question 13

Some of the pit toilets have significant amounts of toilet waste. I assume we need to drain this and haul it away?

Government Response: Leave Human waste and back fill hole with surrounding soil mound soil to allow time for waste to infiltrate.

PWS Changes:

Removed Campers Flat pit toilet from scope of work. Scope is now decommission/removal of 5 pit toilets.

1.03.A: replaced “Chloe Goldade-Holbrook, Recreation Specialist for Waldo Campgrounds, telephone (541) 782-5230, Email: chloe.goldade-holbrook@usda.gov” with Devin Melton, Facilities Engineer, telephone (458) 298-1640, devin.melton@usda.gov”

1.01.C: Added highlighted text.

“All toilet building structures, attached fixtures, concrete, and fiberglass materials shall be salvaged/recycled or disposed to contractor (contractor owned and responsible) and shall be removed off USFS property. Any salvage value shall be considered and credited in project bid.”

1.03.F: Added highlighted text.

“The following photos are of the Marion Guard Station Pit Toilet to be decommissioned. Pit toilets to be decommissioned for this project are of similar construction except for Clear Lake which is a double toilet. Pits to be filled and abandoned are approximately 18 inches in diameter and 6 inches to 3 feet deep.”

(End of Amendment) mailto:chloe.goldade-holbrook@usda.gov mailto:devin.melton@usda.gov

SF-30
SF30 Modification Nov 2016 e-sign

AMENDMENT 001

topmostSubform[0]:
Page1[0]:
AmendmentNo[0]: Amendment 001
Code[0]:
Code[1]:
AccountingData[0]:
A13[0]:
C13[0]:
D13[0]:
NameandTitleSigner[0]:
NameandTitleOfficer[0]: Lorenzo Montoya
Description[0]: Project Title: Pit Toilet Decommissioning - SERVICE

See page 2 for continuation of Standard Form 30.

FacilityCode[0]:
Code[2]:
IssuedBy[0]: Willamette National Forest Supervisor’s Office

3106 Pierce Parkway, Suite D Springfield OR 97477-7909

NameandAddress[0]:
AdministeredBy[0]:
ContractIDCode[0]:
ReqNumber[0]: 1123976
AmendmentNo[1]: 1240BK24Q0130
ModificationNo[0]:
ProjectNo[0]:
Page[0]: 1
Pages[0]: 6
EffectiveDate[0]: Sept. 17, 2024
Dated9B[0]: 09-09-24
Dated10B[0]:
CheckBox9[0]: Off
CheckBox10[0]: Off
CheckBox11[0]: 1
CheckBox13A[0]: Off
CheckBox13B[0]: Off
CheckBox13C[0]: Off
CheckBox13D[0]: Off
IsNot[0]: Off
Is[0]: Off
Extended[0]: Off
NotExtended[0]: 1
2024-09-17T15:33:39-0700
LORENZO MONTOYA
DateSigned[0]:
DateSigned[1]: 09/17/2024
Copies[0]: 1
CopiesReturned[0]:

File details come from the government source that posted it. Updated .