Plans for Trail Reconstruction: Sand Trail Repair - Phase II

This document contains construction plans prepared by the U.S. Department of Agriculture Forest Service, Region Ten (Alaska Region), for the Sand Trail Repair - Phase II project located in the Cordova Ranger District of the Chugach National Forest. The project site is accessible only by boat or plane, situated approximately 9 miles southeast of Cordova along the Copper River Highway, just prior to the first bridge crossing the Scott River (GPS coordinates: 60.509459° N, 145.543964° W). The project involves riverbank stabilization and trail reconstruction work, including rip rap installation, rock barb construction, and aggregate base course placement.

The Schedule of Items Base includes mobilization, clearing and grubbing for access, placement of Class III rip rap on river bank slopes and eroded sections (335 cubic yards), and D-1 aggregate base course for the trail running surface (600 cubic yards). Optional items include: (1) Additional aggregate base course at 600 cubic yards; (2) Short rock barb installation consisting of 15-foot barbs at 5 locations each; (3) Hourly time for dozer or larger equipment; and (4) Additional rip rap at 50 cubic yards. The D-1 aggregate may be substituted with Alaska DOT Sub F material or 4-inch angular material pit run. Specifications require excavation of woody debris, placement of geotextile Class 1 Type E woven material, incorporation of rooted plants in upper layers above ordinary high water mark, and compaction of backfill aggregate. A 14-day approval period is required for the trail remediation plan submitted during project startup.

View the file

Other files

File Type Posted
C05_Amendment2_RFQ_1240BJ26Q0021.pdf PDF
C05_Amendment1_RFQ_1240BJ26Q0021.pdf PDF
C05_Amendment1_Attachment2_SANDTRAIL_FSSS.docx DOCX document
C04_Attachment1_SandtrailPhase2Plans.pdf PDF
C04_Attachment4_WageDetermination.pdf PDF
C04_RFQ_1240BJ26Q0021.pdf PDF
C04_Attachment2_SANDTRAIL_FSSS.docx DOCX document
Bid_Bond_SF24.pdf PDF
C04_Attachment3_GEO_REF_MAP.pdf PDF
Quote Template.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SAND TRAIL REPAIR - PHASE II

PLANS FOR TRAIL RECONSTRUCTION

U.S. DEPARTMENT OF AGRICULTURE

FOREST SERVICE

REGION TEN

CHUGACH NATIONAL FOREST

CORDOVA RANGER DISTRICT

CORDOVA CENSUS AREA

1 7

LOCATION TH GPS POINT.: DATUM WGS 1984: LAT: 60.509459° LONG: 145.543964°

OF

FOREST LOCATION

VICINITY MAP

LOCATION OF PROJECT:

(a) The location of this project is in the Cordova Ranger District, located in the Chugach National Forest. The nearest town is Cordova, and is only accessible by boat or plan, no road access to Cordova is possible.

Directions from Cordova to the Project location are as follows: from Cordova travel South-East along the Copper River Highway. Follow the Copper River Highway for approximately 9 miles. The project location will be on drivers left just prior to the first bridge that crosses the Scott River.

PROJECT LOCATION

Sheet List Table

Sheet Number Sheet Title

1 TITLE

2 PROJECT MAP

3 SITE PICTURES

4 SUMMARY OF ESTIMATED QUANTITIES

5 MULTIPLE PLAN VIEW 64805A

6 MULTIPLE BARB DETAIL 64805A

7 RIP RAP SECTION 25101A

SAND TRAIL PAVED

PARKING

TIME AND MATERIAL WORK LISTED AS

OPTIONAL MAY BE INCLUDED

DEPENDING ON BUDGET AVAILABILITY

GEOREFRENCED

PDF ATTACHED

DRAWING

TITLE

DRAWN

DESIGNER

CHECKED

ARCHIVE NO.

DATE

PROJECT NO.

DWG SHEET NO.

OFSHEET

United States Department of Agriculture Forest Service

5/7 /25

:2

3 H

CO

OG

LE

C :\U

SE

RS

\H

CO

OG

LE

\B

OX

\77

OP

ER

AT

IO

NM

AI

NT

EN

AN

CE

\C

ON

TR

AC

TS

\C

RD

\F

Y

\C

HU

GA

CH

-S

AN

DT

RA

IL

P

HA

SE

II\

2.

R1 0-

X1

7-

EZ

_S

ET

UP

\P

LA

NS

A

ND

S

HE

ET

SE

T\

DW

G\

PR

OJ

EC

T

MA

P.

DW

G;

R10

ALASKA REGION

SAND TRAIL REPAIR -

PHASE II

CHUGACH NATIONAL

FOREST

CORDOVA RANGER DISTRICT

PROJECT MAP

05/07/25

H.C.

H.C.

J.J.

DRAWING

TITLE

DRAWN

DESIGNER

CHECKED

ARCHIVE NO.

DATE

PROJECT NO.

DWG SHEET NO.

OFSHEET

United States Department of Agriculture Forest Service

7/2 /25

:0

0 H

CO

OG

LE

C :\U

SE

RS

\H

CO

OG

LE

\B

OX

\77

OP

ER

AT

IO

NM

AI

NT

EN

AN

CE

\C

ON

TR

AC

TS

\C

RD

\F

Y

\C

HU

GA

CH

-S

AN

DT

RA

IL

P

HA

SE

II\

2.

R1 0-

X1

7-

EZ

_S

ET

UP

\P

LA

NS

A

ND

S

HE

ET

SE

T\

DW

G\

DE

TA

IL

S.

DW

G;

R10

ALASKA REGION

SAND TRAIL REPAIR -

PHASE II

CHUGACH NATIONAL

FOREST

CORDOVA RANGER DISTRICT

SITE PICTURES

05/07/25

H.C.

H.C.

J.J.

TYPICAL RIP RAP LOCATION

TYPICAL AGGREGATE

LOCATION

REPRESENTATIVE IMAGES TAKEN ON 07/24/2023, WET SPRING AND SUMMER, IMAGES ARE SHOWN FOR EXISTING CONDITION CLARITY

TYPICAL RIP RAP LOCATION TYPICAL RIP RAP LOCATION TYPICAL RIP RAP LOCATION

DRAWN

DESIGNER

CHECKED

ARCHIVE NO.

DATE

PROJECT NO.

DWG SHEET NO.

OFSHEET

United States Department of Agriculture Forest Service

5/7 /25

:2

3 H

CO

OG

LE

C :\U

SE

RS

\H

CO

OG

LE

\B

OX

\77

OP

ER

AT

IO

NM

AI

NT

EN

AN

CE

\C

ON

TR

AC

TS

\C

RD

\F

Y

\C

HU

GA

CH

-S

AN

DT

RA

IL

P

HA

SE

II\

2.

R1 0-

X1

7-

EZ

_S

ET

UP

\P

LA

NS

A

ND

S

HE

ET

SE

T\

DW

G\

SO

I.D W

G;

R10

ALASKA REGION

SAND TRAIL REPAIR -

PHASE II

CHUGACH NATIONAL

FOREST

CORDOVA RANGER DISTRICT

SUMMARY OF

ESTIMATED

QUANTITIES

05/07/25

H.C.

H.C.

J.J.

GENERAL NOTES:

1. DISPOSAL SITE TO BE DESIGNATED ON THE GROUND. DISPOSAL TO BE ON USFS LAND WITHIN ADJACENT TO THE TRAIL.

2. CLIPPINGS ARE TO CONSISTS OF ON SITE WOODED MATERIAL. IT IS REQUIRED THAT CONTRACTOR MECHANICALLY REMOVED WOODED MATERIAL WITH IN TACT ROOT SYSTEM AND STORE CLIPPINGS IN COOL WET AREA FOR LATER USE.

3. DAMAGE TO SAND TRAIL FROM CONSTRUCTION EFFORTS ARE TO BE REPAIRED BEFORE PROJECT CLOSE OUT, SUBMIT TRAIL REMEDIATION PLAN TO CO DURING PROJECT START UP. ALLOW 14 DAYS FOR APPROVAL.

4. RIPRAP AND AGGREGATE ARE TO BE AK DOT STANDARD GRADATION

5. PLACE ALL ITEMS AS SHOWN ON THE PROJECT MAP OR AS STAKED BY THE CO IN THE FIELD

6. PLACE ALL ORGANIC MATERIAL THAT IS EXCAVATED ON TOP OF RIPRAP BANKS ABOVE THE ORDINARY HIGH WATER MARK AND INCORPORATE AS MANY ROOTED PLANTS OR TREES IN THE TOP LAYER.

7. ALL MATERIALS ARE TO BE COMMERCIALLY SOURCED

8. 3" MINUS IS REQUIRED AS ADDITIONAL BACKFILL BEHIND RIPRAP SECTIONS. THIS IS INCIDENTAL TO 25101A PAY ITEM. THE D-1 AGGREGATE IS TO BE USED ON THE TRAIL RUNNING SURFACE TO HARDEN TRAIL FOR ATV USE.

In lieu of D-1 Aggregate the contractor may use AK DOT SUB F material, or 4” Angular Material pit run 100% Passing 4 inch and 10-20% passing No. 4 hcoogle Highlight hcoogle Highlight

DRAWN

DESIGNER

CHECKED

ARCHIVE NO.

DATE

PROJECT NO.

DWG SHEET NO.

OFSHEET

United States Department of Agriculture Forest Service

7/2 /25

:0

0 H

CO

OG

LE

C :\U

SE

RS

\H

CO

OG

LE

\B

OX

\77

OP

ER

AT

IO

NM

AI

NT

EN

AN

CE

\C

ON

TR

AC

TS

\C

RD

\F

Y

\C

HU

GA

CH

-S

AN

DT

RA

IL

P

HA

SE

II\

2.

R1 0-

X1

7-

EZ

_S

ET

UP

\P

LA

NS

A

ND

S

HE

ET

SE

T\

DW

G\

DE

TA

IL

S.

DW

G;

R10

ALASKA REGION

SAND TRAIL REPAIR -

PHASE II

CHUGACH NATIONAL

FOREST

CORDOVA RANGER DISTRICT

MULTIPLE PLAN VIEW

64805A

05/07/25

H.C.

H.C.

J.J.

EXISTING GROUND

ROCK BARB

CREEK BOTTOM

1 TOP OF BANK

GEOTEXTILE, CLASS 1,

TYPE E, WOVEN

INCIDENTAL

ORDINARY HIGH WATER

MARK

CLASS 3

RIPRAP

ITEM 25104C

KEYWAY

EXISTING

CREEK BED

GEOTEXTILE, CLASS 1,

TYPE E, NON WOVEN

INCIDENTAL

ORDINARY HIGH WATER

MARK

DRAWING

TITLE

DRAWN

DESIGNER

CHECKED

ARCHIVE NO.

DATE

PROJECT NO.

DWG SHEET NO.

OFSHEET

United States Department of Agriculture Forest Service

7/2 /25

:0

0 H

CO

OG

LE

C :\U

SE

RS

\H

CO

OG

LE

\B

OX

\77

OP

ER

AT

IO

NM

AI

NT

EN

AN

CE

\C

ON

TR

AC

TS

\C

RD

\F

Y

\C

HU

GA

CH

-S

AN

DT

RA

IL

P

HA

SE

II\

2.

R1 0-

X1

7-

EZ

_S

ET

UP

\P

LA

NS

A

ND

S

HE

ET

SE

T\

DW

G\

DE

TA

IL

S.

DW

G;

R10

ALASKA REGION

SAND TRAIL REPAIR -

PHASE II

CHUGACH NATIONAL

FOREST

CORDOVA RANGER DISTRICT

MULTIPLE BARB

DETAIL 64805A

05/07/25

H.C.

H.C.

J.J.

EXISTING GROUND

TOP OF BANK

CLASS 3 RIPRAP

ITEM 25101A

CREEK BOTTOM

KEYWAY

GEOTEXTILE, CLASS 1, NON WOVENTYPE E

INCIDENTAL TO RIPRAP

ORDINARY HIGH

WATER MARK

BACKFILL WITH

COMPACTED AGG. (3 IN MINUS IS INCEDENTAL)

6" LIFTS MAXIMUM

3 PASSES WITH COMPACTOR

TOP OF BANK PLACEMENT DIRECTION

FLOW

ORDINARY HIGH WATER MARK

STREAM BED

DRAWING

TITLE

DRAWN

DESIGNER

CHECKED

ARCHIVE NO.

DATE

PROJECT NO.

DWG SHEET NO.

OFSHEET

United States Department of Agriculture Forest Service

7/2 /25

:0

0 H

CO

OG

LE

C :\U

SE

RS

\H

CO

OG

LE

\B

OX

\77

OP

ER

AT

IO

NM

AI

NT

EN

AN

CE

\C

ON

TR

AC

TS

\C

RD

\F

Y

\C

HU

GA

CH

-S

AN

DT

RA

IL

P

HA

SE

II\

2.

R1 0-

X1

7-

EZ

_S

ET

UP

\P

LA

NS

A

ND

S

HE

ET

SE

T\

DW

G\

DE

TA

IL

S.

DW

G;

R10

ALASKA REGION

SAND TRAIL REPAIR -

PHASE II

CHUGACH NATIONAL

FOREST

CORDOVA RANGER DISTRICT

RIP RAP SECTION

25101A

05/07/25

H.C.

H.C.

J.J.

Sheets and Views
1 TITLE
2 PROJECT MAP
3 SITE PICTURES
4 SUMMARY OF ESTIMATED QUANTITIES
5 MULTIPLE PLAN VIEW 64805A
6 MULTIPLE BARB DETAIL 64805A
7 RIP RAP SECTION 25101A