This amendment modifies a solicitation for a cabin replacement project on the Tongass National Forest in Alaska. Key details include replacing an existing 60-foot A-frame cabin at Tanis Mesa with a new single-story 15-foot by 17-foot log cabin, constructing an associated deck, ramp, stairs, and foundation, and installing a diesel heating system. The work site is approximately 45 miles southeast of Yakutat, accessible only by helicopter or bush plane, with no existing utilities. The government intends to award a firm fixed-price construction contract between $250,000 and $500,000 without discussions but reserves the right to conduct discussions. The solicitation number is 1240BJ23R0005 and is issued by the U.S. Department of Agriculture Forest Service.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE

3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

Previous edition unusable

2. AMENDMENT/MODIFICATION NUMBER

ROXANNE D. ANDERSON

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Project Name: GAOA Yakutat Cabin Maintenance: Tanis Mesa Cabin Replacement

The purpose of this amendment #0002 is to:

1. Make corrections and updates to the Q & A responses (see updated attachment with Yellow Highlights (questions #15 & 16)

Procurement & Property Services, Field Procurement Operations Northwest Zone – Construction & A-E Attn: Roxanne Anderson – Contracting Officer

1240BJ23R0005

1 1

06/08/2023

05/12/2023

RFI: GAOA Yakutat Cabin Maintenance Tanis Mesa Cabin Replacement

1. How long is the runway at the cabin?

Approx. 2,275 feet

2. What type of soil is at the new site?

Glacial till with mixed cobble sizes. There’s an assumed 3,000 PSF loading capacity for this substrate.

3. Can the old cabin be used during the new cabin construction?

Yes

4. When is the NTP expected?

No sooner than 6/22-23, There’s a required prework meeting, bonding and other required submittals before work can begin.

5. Roof framing. In the plans attached to the solicitation there is not a roof framing detail provided. Traditionally on FS cabins it is built with Purlin beams on which exposed t&g is installed and an over frame roof atop that which can be insulated. Will this be the method used, or a different one?

The method of roof framing you have described would be acceptable. The contract calls for a delegated design by a licensed architect/engineer of the structural components of the cabin, including the roof. We’d expect the delegated designer to provide a more detailed roof design.

6. The Floor framing plan calls for 2”x12” @ 16” OC, will these be in hangars or placed atop the carriers?

The foundation drawings provided are conceptual plans meant to be developed further into shop drawings.

The contract calls for a delegated design by a licensed architect/engineer for the structural components of the cabin, including the foundation. We’d expect the delegated designer to provide a more detailed foundation design.

7. Roof Snow Load. Under “Live Load Characteristics “on the plans it calls for a ‘ground load’ of 250psf. What is the Roof Load to be constructed at?

It is anticipated that the delegated designer will provide sloped roof live loads as part of the stamped shop drawings required for submittal in this contract.

8. Does the 15' x 17' replacement cabin have to be traditional log construction? Would log siding be an acceptable substitute?

Yes, as long as siding material matched wood species for logs; however, we would add that the walls in addition to the floor and ceiling would need to be insulated.

9. What is the actual deck size?

See drawings sheets (size is recommended, 6’x15’)

10. What type of foundation is required---reinforced poured concrete, concrete block, crawl space, etc.

See drawings for recommended foundation type; PIP concrete footings with bigfoot systems. if you determine there is a more sensible foundation option to fly in with the current design criteria we are open to proposals.

11. What type of heating system is required?---any other utility requirements, electrical, plumbing, etc.

Section C of the contract describes heat source and if utilities are present. Heating system to be Diesel #1 stove. they are typical in remote locations with minimal firewood source. Stove and tank for system is supplied by government. Piping/metalbestos and plumbing from tank is not supplied.

12. Can the flammable materials from the deconstructed cabin be incinerated on site?

Yes, see section 024100 Demolition and Removal, part 3.03 BURNING for full specification.

13. Is it anticipated that any hazardous materials, other than heating fuel, will be part of the contract?

No

14. Has any hazmat testing been performed on the structure?

No

15. Can it be confirmed the structure was built after 1979?

Updated response: The structure was built after 1979

The attached photo above shows a picture of the cabin standing in 1962.

16. Is the counter to be stainless Steel or 3/4" AC Plywood?

Plans Page 2 - the counter top material shall be Stainless Steel.