This document is an Amendment to a Solicitation for the Rail Ridge Post Fire Fence Construction project for the Malheur National Forest in the Pacific Northwest Region. The solicitation seeks a contractor to repair and reconstruct approximately 45.19 miles of fencing across five priority areas, damaged by a previous fire. The project involves removing existing fence materials, clearing right-of-way, constructing new fencing, and disposing of damaged materials. Fences range from 0.25 to 15.25 miles in length, with varying levels of accessibility, and must meet wildlife-friendly specifications including specific wire spacing and composition.

Key dates include a solicitation due date extended to 29 September 2025 by 1630 hours, with a performance period from 10/15/2025 to 06/01/2027. Vendors must note strict requirements such as no heavy equipment allowed, wildlife crossing considerations every 0.25 miles, and H-braces constructed every 0.25 miles. The fencing work is divided into five priority levels with different unit prices, and contractors must ensure all fencing is restored to "like-new condition" meeting wildlife-friendly fence guidelines. The contract is issued by the USDA Forest Service, Northwest Region, located in Portland, Oregon, and requires detailed compliance with specific construction and environmental specifications.

View the file

Other files for this federal contract opportunity

Other files attached to Malheur NF FY25 Range Fence Construction, newest first.
File Type Posted
1240BH25R0036 Amendment 1.pdf PDF
1240BH25R0036_Solicitation Pkg. Malheur NF Range Fence Construction.pdf PDF
Attachments Range Fence Construction.zip ZIP file

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

1240BH25R0036

x x

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

40BH

PORTLAND OR 97204-2829

STE 310

1220 SW 3RD AVE

USDA-FS CSA NORTHWEST 6

DIS09/15/20250002

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

08/14/2025

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not is required to sign this document and return ________1__________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

The purpose of this Amendment is to address the following:

1. Provide clarification of questions from contractors.

2. Provide additional information to contractors (see updated location detail table and updated maps(Overview, Priority 3 and 5)).

3. Replace Section B.1 of the solicitation in full (see updated schedule of items).

4. Extend the solicitation due date.

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

JUSTIN C. HOLDER

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

Previous edition unusable

To ensure adequate time for the Government to respond prior to the proposal due date, all inquiries shall be submitted not later than 19 September 2025. Site visits can be coordinated with the technical point of contact. Solicitation due date is extended.

Offers should be submitted no later than 29 September 2025 by COB (1630).

Continued ...

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

x

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

NAME OF OFFEROR OR CONTRACTOR

2 2

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

1240BH25R0036/0002

Period of Performance: 10/15/2025 to 06/01/2027

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

Solicitation No: 1240BH25R0036 Project Name: Malheur NF FY25 Range Fence Construction

Revised 09.05.2025

PART I—THE SCHEDULE

SECTION B--SUPPLIES OR SERVICES AND PRICES/COSTS

B.1 SCHEDULE OF ITEMS

Contract Line Item 0001 (Base) Priority 1 - (Chrome Ridge, Widows Burn, Horse Mtn, No Name Location)

Item Number Description MoM Unit Price Total Price Unit Qty

1 Removal and ROW Clearing MI 8.20 $ $ 1a Construction MI 8.20 $ $

1b Disposal of damaged or unusable existing fence material. LS NA $ $

TOTAL $

Priority 2- (Aldrich Bdy1, Oliver Cr Bdy, Smoky Bdy, Murd Cr, Blue-Horse, S Fork Deer Ex, Timber Mtn, No Name Location)

Item Number Description MoM Unit Price Total Price Unit Qty

2 Removal and ROW Clearing MI 18.64 $ $

2a Construction MI 18.64 $ $

2b Disposal of damaged or unusable existing fence material. LS NA $ $

TOTAL $

Priority 3 - (Timber Mtn, Blue Horse, Sf Murd Pstr, No Name Location)

Item Number Description MoM Unit Price Total Price Unit Qty

3 Removal and ROW Clearing MI 4.57 $ $

3a Construction MI 4.57 $ $

3b Disposal of damaged or unusable existing fence material. LS NA $ $

TOTAL $

Priority 4- (Murd Cr Bdy, S Todd Cr, Todd Cr, Maggot Spring, No Name Location)

Item Number Description MoM Unit Price Total Price Unit Qty

4 Removal and ROW Clearing MI 15.25 $ $

4a Construction MI 15.25 $ $

4b Disposal of damaged or unusable existing fence material. LS NA $ $

TOTAL $

Priority 5 - (Aldrich Bdy)

Item Number Description MoM Unit Price Total Price Unit Qty

5 Removal and ROW Clearing MI 0.25 $ $

5a Construction MI 0.25 $ $

5b Disposal of damaged or unusable existing fence material. LS NA $ $

TOTAL $

TOTAL PRICE ALL ITEMS $

Location Detail Table:

Priority 1 Fences Fence Name Length # Wires Notes Chrome Ridge 2.59 4 Difficult to access No name 2.90 4 This section is mostly accessible by road Widows Burn 2.23 4 Difficult to access Horse Mountain 0.48 4 About 30% of fence is close to a road

Priority 2 Fences Fence Name Length # Wires Notes Aldrich Boundary 1 4.02 4 Difficult access Oliver Cr Boundary 1.0 4 Difficult access Smoky Boundary 0.96 4 Difficult access Murderers Cr Boundary 7.93 4 Difficult access Blue-Horse 0.78 4 Difficult access Timber Mountain 0.78 4 Difficult access No name 2.14 4 Needs minor maintenance and brushing South Fork of Deer Creek enclosure

1.03 4 Minor maintenance/repair and possible brushing. Easy access along road

Priority 3 Fences Fence Name Length # Wires Notes Blue-horse 0.35 3 Easy road access No Name 1.46 4 Difficult access SF Murderers Pasture 0.49 3 About 50% is close to a road Timber Mountain 2.27 4 About 40% of fence is close to a road

Priority 4 Fences Fence Name Length # Wires Notes Maggot Spring 4.0 4 About 30% is close to a road Murderers Cr Boundary 1.68 4 Difficult to access No Name 6.07 3 Minimal road access, primarily difficult to access South Todd Creek 2.08 4 Difficult to Access Todd Creek 1.42 4 Difficult to access

Priority 5 Fences Fence Name Length # Wires Notes Aldrich Boundary 0.25 4 Road access

Note: For difficult access sites see C.2 Project Location and attached Maps.

Vendor Clarifications 2

1. Portions of Priority 1 fences have already been re-built by the permittee and/or loggers?

Yes, See attached amendment.

2. Can there be an extension to the bid deadline?

Yes. See attached amendment.

3. Considering the roadless area, will UTVs/ATVs be allowed to access remote areas?

See Question #15 on Amendment 1 Vendor Clarifications.

See Solicitation Attachments pg. 23, Performance Work Statement Sec. 4.0 Travel

4. Is there flexibility in the fence line based on where it’s mapped, so it can be constructed in a straighter line requiring less bracing and reducing wear on the fence?

See Attachments pg. 23, Performance Work Statement Sec, 2.3.2 Additional Fence Construction Specifications Doc

5. Which fence lines are 4-wire vs. 3-wire?

See Detail Location Table.

6. Priority 5 Let-down fence, are let down fences part of this contract?

Let-down fence has been removed from contract. See amendment 2 and detail table.

7. Will heavy equipment be allowed to clear the fence lines?

No heavy equipment will be allowed.

8. Is there flexibility in that buffer to cut burnt snags that may compromise the new fence line?

If there are snags that pose a safety hazard during construction, those are allowed to be felled. Permittees will be responsible for future fence maintenance.

9. Can burnt trees be used as anchors?

No, See Attachments pg. 23, Performance Work Statement Sec, 2.3.2 Additional Fence Construction Specifications Doc

10. If H-Braces/T-posts/wooden fence-stays are in good condition, can they be re-used?

(some portions of newer fence lines were not affected by the fire) If H-Braces/posts, T-posts, and/or wooden stays are in good condition (not burnt, cracked or rotten), these do not need to be replaced, however completed maintenance must meet “like new” conditions and wildlife friendly specifications. (See Wildlife Friendly Fence Guide). See Detail Location Table indicating which fences only require repair. Fences are required to be in “like new conditions”

11. Do existing H-Braces need to be replaced with all metal bracing?

See question #10.

If H-brace is in good condition these do not need to be replaced. If they are burnt, cracked, rotten, or damaged in some other way then they are to be replaced with metal bracing.

12. Are all fences required to be rebuilt even if portions are in good condition?

Fences must be in “like-new condition” and meet wildlife friendly specifications. (See Wildlife Friendly Fence Guide). See Detail Location Table indicating which fences only require repair.

13. Are non-existent fence lines (no materials left) requiring full re-builds?

Yes, where the fence has been completely destroyed by fire will require a full re-build.

14. Will non-existent fence lines (no materials left) be flagged-out by the Forest Service?

The forest service will provide spatial data for the fence line locations.

15. Do we bid on removal of non-existent fences ?

Per Schedule Notes “Contractors should include all labor, materials, and supplies needed to perform the work described under its corresponding unit price.”

16. Does the Forest have an idea as to how many H-braces will be needed? This is difficult to estimate/bid on.

H-braces are to be constructed every 0.25 miles according to specs, see Attachments pg.

23, Interagency Fence Specs. See Detail Location Table for fences requiring minor repairs.

17. The specs mention considering wildlife crossings, are locations indicated?

Wildlife crossings are required every 0.25 miles of fence line, see Attachments pg. 23, Performance Work Statement Sec. 2.3.1 Wildlife Friendly Fence Specs. The forest service will identify specific locations for wildlife crossings prior to construction/ repair.

18. Will there be a separate line for H-Braces?

No, H-braces are figured in “Construction” in the Schedule of Items (See schedule notes)

19. Will there be line items for miles of repair vs. reconstruction? Or labor No. Repair, reconstruction, and labor are figure in “Construction” in the Schedule of Items. (See schedule notes)

20. Does this contract fall under IDIQ?

No, this no longer falls under IDIQ however it did in the past.

21. If a fence only needs minor repairs, but the current condition does not meet wildlife friendly specs, do the repairs need to include changing the fence to meet the wildlife friendly specs (replace bottom barbed wire with smooth wire and adjust wire spacing)?

Yes, See question #10 and #12.

22. For line clearing can equipment be used to clear line such as feller bunchers?

Update to amendment 1 question #12. No heavy equipment is allowed.

Amend 2 Attachments_2025.09.15.pdf
Amendement 2 Detail Table_2025.09.12.pdf
Schedule of Items_Amendment.pdf
PART I—THE SCHEDULE
SECTION B--SUPPLIES OR SERVICES AND PRICES/COSTS
B.1 SCHEDULE OF ITEMS

File details come from the government source that posted it. Updated .