This document includes notes from a pre-solicitation meeting and attachments related to a solicitation to replace emergency waterlines at Timberline Lodge. The Forest Service is seeking a contractor to install new copper waterlines to replace failing Aquatherm pipes throughout the historic lodge. Work must be coordinated weekly with the concessionaire, RLK Inc., to minimize impacts to lodge operations, with water shutdowns limited to 3-4 hours if possible and cutover work scheduled at night. The start date is anticipated in August with a 180-day performance period. Longer pipe sections of up to 20 feet can be used in some areas but may be difficult in the attic. Questions were answered regarding material substitutions, project interruptions, and equipment access points. Attachments include pictures of existing Aquatherm lines and a drawing of their routing.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment1.pdf | ||
| CompleteSolicitation.pdf | ||
| Attachment1-TechnicalSpecifications.pdf | ||
| Attachment2-ProjectDrawings.pdf | ||
| Attachment3-WageDetermination.pdf | ||
| Attachment4-BidBond.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
1240BH23R0030
x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
40BH
PORTLAND OR 97204-2829
STE 310
1220 SW 3RD AVE
USDA-FS CSA NORTHWEST 6
40BH
CORVALLIS OR 97331
3200 SW JEFFERSON WAY
USDA-FS CSA NORTHWEST 6
06/14/20230002
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
05/26/2023
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
The attached preproposal conference notes and attendance roster is provided. Also attached are pictures and redline drawings referenced in the notes.
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
DARCY J. RAPOZA
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
/s/ Darcy J. Rapoza 14 June 2023
Timberline Waterline Emergency Replacement Pre‐Solicita on Mee ng Notes and Ques ons
June 13, 2023
Barlow Room comments:
Timberline is an Historic Structure with a Historic Building Preserva on Plan. The work to be completed is mostly in areas of low significance, so impacts of the plan should be minimal.
Timberline Lodge is operated by RLK Inc. and will be in full opera on during the performance period of the contract. Work that will limit or interrupt water services will need to be coordinated through the
Forest Service Contrac ng Officer’s Representa on/Contrac ng Officer and RLK representa ves to minimize the impacts. This includes limi ng dura on of water shut down preferably to 3‐4 hours, and/or comple ng work in the late evening and early morning hours. With appropriate no ce and pre‐planning, other op ons may be possible.
Pro‐press type fi ngs can be part of the proposal, but the installa on of these should be limited and only in open, readily observable/accessible loca ons. Ideally longer sec ons of piping can be pre‐ assembled with solder joints, and e ins could be completed with pre‐press type fi ngs.
Mathew Hackett, COR, said that during the original contract, the contractor was able to get 20’ lengths into the West a c, but only 10’ in the east. We toured these areas so the contractors could make their own assessment of these possibili es.
Site Stops:
We showed them the boiler room and the lay out of the waterlines within. Most lines go to the east out of the boiler room and up the east stairwell, but one line does take off to the north and goes through the dry storage room. Another line goes into the Carpenter shop and then connects to PEX lines in the
Steam Tunnel.
We went to the carpenter shop and showed them the line and the steam tunnel entry. We let them know that the steam lines in the tunnel will be removed by Ar s, the Boilers contractor, so if access is required into the steam tunnels, this will have to coordinate with the steam line removal by Ar s. (This should be done before the performance period starts, but could overlap a bit, if Ar s gets behind schedule.) The Boilers contract is slated to be complete in November. It was commented that the exis ng
Copper and PEX lines were to remain, only Aquatherm needs to be replaced.
Piping in the east stairwell was shown.
We opened the dry storage room and showed them the pipe in this area. It appears to be cold water supply to the Price Wing. We went to the East a c and showed them where the lines come up from the stairwell and run through the North side of the a c. Two lines also crosses to the south side of the a c to serve the rooms on that side.
The entry to the headhouse a c was shown, with the lines going from the east end to the west.
We toured the west a c and pointed out the lines from the headhouse and lines serving the west end.
We entered the elevator room and showed them the access to the steam tunnel and possible route for ge ng lines to the a c.
Iden fied exis ng sec on of Aquatherm pipe that is not ed into the exis ng system but is in the path of the new pipe loca ons. A ached are pictures of either end (Women’s Headhouse Bathroom and closet behind the elevator) and a drawing of the path that was taken by the pipe. A er research, it appears like the west end can be opened up to create access to this space, without any demoli on of the exis ng Women’s Headhouse Restroom.
We let them all know that we had scanned the redline drawings from the last contract and that these would be included in the amendment covering this site visit.
Ques ons Asked:
Will the lodge be ac ve?
o Yes – weekly coordina on with RLK and the Forest Service required.
o The work to be completed is mostly in areas of low significance, so impacts of the contractors work plan should be minimal.
Will the pool repair be ongoing?
o Yes, along with the Boilers.
Are you familiar with pro press/will pro press be allowed.
o Subs tu ons are usually addressed a er award, in this case Pro Press is acceptable in open readily observable areas.
Does the new work replace the exis ng path?
o In most spaces, there is space to run new line alongside the exis ng, but the path will change as required.
What is the start date/dura on?
o Start date as soon as possible (ideally around August) o Dura on is 180 days.
What lengths of pipe are acceptable?
o 20 and 10 are acceptable but 20 may be too long – 20 could be feasible in the east stairwell, but not the east a c. Longer lengths may be transported across the head house a c from the west a c to the east.
NOTE: All steam pipes will be removed by the end of the boiler replacement project. Some delay of the start of the project may occur when coordina on discussions occur between the
Government, exis ng contractor, and awarded contractor. This discussion will determine the earliest possible start date to accommodate this.
What material is allowed?
o Copper is required.
Are there any guidelines for interrup ons to the project by the concessionaire?
o Case by case –coordina on between all par es will occur at the beginning of the contract and during the weekly coordina on mee ngs.
o Need to minimize impact on the lodge.
Cut over work or other work shu ng down a por on of the water system will likely be done in the middle of night, or off hours depending on dura on.
There may be some impact to the kitchen shu ng it down for this work.
Picture 1. West end of Aquatherm sec on behind the elevator
Picture 2. East end of Aquatherm sec on located under floor panel in Women’s Restroom
",2-3/8,& 3
AQUATHERM
PE WATER PIPES
(INTERNAL DIAMETERS)
THE VERT. END TERMINATES
BELOW THE FLOOR
THE HORIZ. CAPPED END
TERMINATESUND THE
LANDING.
| Aquatherm Replacement Pre Solicitation Meeting.pdf |
| Aquatherm-Bathroom-Drawings.pdf |
| Sheets and Views |
| Layout1 |
| Aguatherm-Layout2BW.pdf |
| Sheets and Views |
| Layout2 |
File details come from the government source that posted it. Updated .