This document contains questions and answers regarding the acquisition of mobile office trailers by the Department of Agriculture Forest Service. The Forest Service Shrub Science Laboratory is relocating to Cedar City, Utah and requires temporary trailer facilities to house office and lab spaces for staff. The trailers must provide HVAC capable of maintaining 65-75 degree temperatures with a minimum of 6 air changes per hour. Countertops should be water-resistant materials like Formica. Standard storage cabinets with adjustable shelving but no protruding handles are specified. Tile flooring is required throughout with both ADA accessible ramps and stairs required at doors. Utilities will be connected by the delivery contractor or Forest Service. Internal communications must include specified numbers of computer connections in offices, lab, and general areas, while external communications will be provided by the Forest Service. Two entrance/exit doors are required which can be located on the same side or front and back. A window is required in each office space but not storage or communications rooms. Revisions to the floorplan may be necessary to accommodate HVAC plenum walls. The document seeks clarification on electrical requirements, which are confirmed as a minimum of two 240-volt circuits.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| MRDE Cedar City Lab Office Trailer Questions_82622.pdf | ||
| Attachment 1 - Satement of Work_Revised_8822.pdf | ||
| Attachment 2 - Wage Determination.pdf | ||
| Attachment 1 - Statement of Work.pdf | ||
| Solicitation 1240BG22Q0036.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MRDE Cedar City Lab Office Trailer Questions
8/22/2022
Q1. What are the specific HVAC requirements?
A1. HVAC shall be capable of keeping each segmented portion of the trailers between the temp. of 65 and 75degrees F.
Q2. How many air changes are required per hour?
A2There shall be a minimum of 6 air changes per hour.
Q3. What are the requirements for counter tops?
A3. Countertops shall be Formica or similar water repellent chemical neutral materials.
Q4. Requirement for cabinets?
A4. Cabinets shall be standard storage type, wooden, minimum width of 32-inches, with adjustable shelving (a maximum of two shelves per cabinet). Doors shall have beveled edge for opening with no protruding handles
Q5. What type of flooring is required throughout?
A5. Tile flooring is required throughout.
Q6. Will ramps be required? Or steps/decks only?
A6. Both doors shall have a ADA accessible Ramp and stairs.
Q7. Who will be responsible for connecting utilities? Who is responsible for manifolding utilities?
A7. The delivery contractor should include utility connection into their delivery and set up bid costs. The utility connections should be available on the set up site at the time of delivery. In the event that they are not, the Forrest service will make the connections.
Q8. Is contractor responsible for communications? If so, what are the requirements?
A8. The internal communications capability shall be standard office style. Each office, shall have at least one double communications (computer connector), the lab area shall have three (3) double communications (computer connector), and the general open area shall have four (4) double communications (computer connector). Each of these connections shall be available in the The External Communications will be connected by the Forest Service along with the recks, servers, and communications equipment.
Q9. The statement of work indicates calls for “one front and one back” exterior door, but the floorplan shows two in the “front”. Please clarify the number and location of entry/exit doors.
A9. The doors can be either on the same side or front and back. The main thing is to have two entrance exit doors.
Q10. The SOW calls for a minimum of 1 exterior window per room, but drawing does not reflect. Please advise if each room (or office?) will have a window in it and confirm location.
A10. We do want a window in every office. The storage room and comm. Room do not need windows.
Q11. The floorplan and the mechanical plan do not match each other. To include plenum walls for the HVAC systems, there will be some redesign in the floorplan. Please confirm as this affects location/number of windows.
A11. IT is acceptable to revise the floor plan. It was provided for reference example.
Q12. The SOW mentions “a minimum of 2 – 240 amp circuits”. Please confirm/verify this should be “240-volt circuits”.
A12. Yes, the correct circuit is a 240-Volt Circuit.