(x)

1240BF23Q0024

x x

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

40BF

PORTLAND OR 97204-2829

STE 310

1220 SW 3RD AVE

USDA-FS CSA NORTHWEST 4

03/30/20230001

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

03/17/2023

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

This amendment does not extend the quotes due date.

This amendment makes the changes on page 2 of this amendment to the PWS for Petersburg

Janitorial.

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

STACY G. DOUTT

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

1240BF23Q0024 Amendment #1:

1. Add the following information to Section 3.1 – Petersburg Ranger District (PDO) Building only:

Potential Asbestos: Floor finishes were mainly of vinyl asbestos tile or a replacement vinyl composition tile, both having an asbestos-containing mastic. The vinyl asbestos tile flooring was typically exposed on the 2nd floor. Some of the original vinyl asbestos tile flooring had been removed, and replaced with a non-asbestos vinyl composition tile, but the asbestos-containing mastics remaining in place. Vinyl tile flooring and/or mastics on the 1st floor were covered with carpeting, as were some areas on the 2nd floor.

• Various colors of 9” x 9” Floor Tile (assumed Asbestos-Containing Material [ACM] and contaminated by mastic).

• Various colors of 12” x 12” Floor Tile assumed to be contaminated by asbestos-containing black mastic.

Cleaning of Asbestos Containing Building Material (ACBM) Floors: Cleaning of flooring that may contain asbestos material, such as Vinyl Asbestos Tile (VAT), shall comply with the methods prescribed in the National Institute of Building Sciences (NIBS) Guidance Manual, ‘Asbestos Operations and Maintenance Work Practices.’ The Contractor shall have a copy of the NIBS Guidance Manual. Upon request, the Government shall make available to the Contractor any asbestos sampling results.

2. Change the wording in Task 3 from

3.1 Strip, Scrub, Seal, and Wax Floors

Floors shall be stripped, scrubbed, sealed, and waxed to maintain a uniform glossy appearance. Contractor shall meet the requirements of commercial practices to include the application of a non-skid commercial wax. A uniform glossy appearance is free of scuff marks, heel marks, wax build-up, air bubbles and other stains and discoloration.

to

3.1 Strip, Scrub, Seal, and Wax Floors

Floors shall be stripped, scrubbed, sealed, and waxed to maintain a uniform glossy appearance. Contractor is not responsible for moving any furniture. The Government will move all small items in preparation after notification to the COR. Contractor shall meet the requirements of commercial practices to include the application of a non-skid commercial wax. A uniform glossy appearance is free of scuff marks, heel marks, wax build-up, air bubbles and other stains and discoloration.

For the PDO building only until floor surface changes: Contractor shall do a heavy duty mopping to provide a uniform glossy appearance and shall not clean in a manner generates airborne particles.

Contractor is not responsible for moving any furniture.

The Government will move all small items in preparation after notification to the COR.