This is a Statement of Work (SOW) for HVAC replacement services at the Santee Experimental Forest Laboratory in Cordesville, South Carolina, issued by the USDA Forest Service Southern Research Station.
The contractor must replace a failed 3-ton packaged heat pump system (HP3) serving a 2,480 gross square foot laboratory building with a new 3-ton ENERGY STAR-certified heat pump that meets FEMP federal purchasing requirements. Work scope includes: demolition and recovery of the existing unit with EPA-compliant refrigerant recovery; installation of the new unit including electrical work (non-fused disconnect, whips, OCPD verification, labeling, outdoor unit pad/anchorage per code), controls installation (new 7-day programmable thermostat, low-voltage wiring integration, staging/defrost/back-up heat verification), and condensate management with proper trap, slope, cleanout, and safety float switch. The contractor must perform commissioning and verification including manufacturer start-up procedures, airflow/static pressure verification, temperature measurement, and refrigerant performance documentation. Additionally, the contractor must provide owner training on thermostat operation and maintenance, and deliver operations and maintenance documentation, warranty certificates, and as-built routing diagrams. The new heat pump must meet post-2023 SEER2/HSPF2 national minimum efficiency standards (≥14.3 SEER2 and ≥7.5 HSPF2 for residential split heat pumps) with regional Southeast compliance required. The thermostat must be 7-day programmable and ENERGY STAR or FEMP-designated. Equipment pad must be precast or cast-in-place concrete with 3-inch minimum thickness. Performance schedule requires work to begin within 30 calendar days and complete within 60 calendar days of authorization. Submittals required prior to work include product data for the heat pump and thermostat (10 working days review period), and prior to final invoice submission: EPA Section 608 technician credentials and refrigerant recovery logs, commissioning report with startup checklist and measured performance data, as-built documentation, and manufacturer warranty registration documentation. Government furnishes site access during normal business hours (0730-1700 M-F, excluding Federal Holidays), parking and storage coordination, 120V power supply with contractor-provided extension cords, potable water supply with contractor-provided hoses, and public restroom access. All travel costs are included in the fixed price response. The contractor must check in daily with the Site Point of Contact; daily debris removal and final workspace restoration to original or better condition are required, with no onsite dumpster available. The contractor is encouraged to divert recyclable materials from landfill disposal. Key government personnel include Contracting Officer Chad Schmele (chad.schmele@usda.gov), Contracting Officer's Representative Jason Anderson (Jason.L.anderson@usda.gov, 828-712-1923), and Site Point of Contact Julie Arnold (julie.a.arnold@usda.gov).
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
US Department of Agriculture (USDA)
Forest Service
Southern Research Station
Statement of Work
Laboratory (Site ID #02) HVAC Replacement Santee Experimental Forest
3734 SC-402
Cordesville, SC 29434
Contents General Information
1.0 Scope of Work
2.0 Background
Contractor Requirements
3.0 Technical Requirements/Tasks
3.1 HVAC Equipment Replacement
4.0 Materials
4.1 HVAC Equipment Replacement
5.0 Submittals
6.0 Government Furnished
7.0 Travel
8.0 Contractor’s Key Personnel
9.0 Government’s Key Personnel
10.0 Schedule
11.0 Security Requirements
12.0 Clean Up/Disposal
13.0 Data Rights
14.0 Section 508 – Electronic and Information Technology Standards Attachment
Project Santee Experimental Forest Laboratory (Site ID #02) HVAC Replacement
General Information
1.0 Scope of Work
• The Government requires the replacement of an existing 3-ton packaged heat pump system with a new, high-efficiency ENERGY STAR-certified unit that also satisfies FEMP federal purchasing requirements for energy-consuming products.
• The unit serves the Laboratory at the Santee Experimental Forest located at 3734 SC-402, Cordesville, SC 29434 (33.136543, -79.816041) https://maps.app.goo.gl/BwsJDgTcSUj3JfbD7
2.0 Background
A heat pump (HP3) serving a portion of the 2480 GSF LAB building at the Santee Experimental Forest has failed and requires replacement. See Figures 1 and 2 for more information.
No potentially hazardous materials are expected to be encountered during the execution of work under this Scope of Work.
Should the contractor encounter any additional suspected hazardous materials, stop work and contact COR immediately.
Contractor Requirements
3.0 Technical Requirements/Tasks
3.1 HVAC Equipment Replacement
Contractor shall furnish all labor, materials, equipment, tools, supervision, and incidentals to:
1. Demolition & Recovery o Lockout/tagout; recover refrigerant per EPA rules; disconnect and remove the existing packaged unit, thermostat, and related wiring/condensate; dispose of materials per environmental rules.
2. Installation o Provide and install one (1) new 3-ton ENERGY STAR-certified single packaged heat pump unit sized to existing ducts and electrical service; equipment must meet Section 3 efficiency requirements.
o Electrical: new non-fused disconnect (as required), whips, OCPD verification, labeling; outdoor unit base/pad/anchorage per code and site conditions.
o Controls: install new programmable thermostat; integrate low-voltage wiring; verify staging/defrost/back-up heat (if present).
o All equipment shall be installed per AHRI/ASHRAE best practices to preserve rated SEER2/HSPF2 performance o Condensate management: proper trap, slope, cleanout; safety float switch; route to approved location;
weather-seal penetrations; restore finishes.
3. Commissioning & Verification o Start-up per manufacturer; verify airflow (CFM), external static, supply/return temps, and refrigerant performance; functional test heating/cooling, defrost and controls; document measured data.
4. Training & Turnover o Provide owner training on thermostat, operation, and routine maintenance; deliver O&M, warranty certificates, and as-built routing for line set and electrical one-line.
4.0 Materials
4.1 HVAC Equipment Replacement
Packaged Air Source Heat Pump: Energy Star or FEMP Designated Product, Thermostat: 7 day programmable; Energy Star or FEMP-Designated Product Equipment Pad: 3” minimum thickness, precast or cast-in-place concrete Equipment Risers: Installer’s choice, must be able to support equipment weight and prevent slipping and minimize vibration during operation of the unit.
https://maps.app.goo.gl/BwsJDgTcSUj3JfbD7
Federal Efficient Purchasing Requirements: Agencies must procure ENERGY STAR-certified or FEMP-designated products (42 U.S.C. § 8259b; FAR Part 23) unless written exceptions are justified;
products may be presumed life-cycle cost-effective (10 CFR Part 436, Subpart C). 5 6
• Efficiency Baselines: Post-2023 SEER2/HSPF2 national minimums apply; residential split heat pumps must meet ≥14.3 SEER2 and ≥7.5 HSPF2. Regional installation compliance (including the Southeast) is required.
ENERGY STAR Energy Efficient Products | Products | ENERGY STAR https://www.energystar.gov/products Search for Energy-Efficient Products | Department of Energy:
https://www.energy.gov/eere/femp/search-energy-efficient-products
5.0 Submittals
Submit the requested information for the following material for approval prior to incorporation into the work. Allow 10 working days for review/approval.
• Air Source Heat Pump product data
• Thermostat product data
Submit the requested information for the following to be incorporated into the project file prior to submission of the final project invoice.
• EPA Section 608 technician credentials and refrigerant recovery logs.
• Commissioning Report (startup checklist, measured performance)
• As-Built documentation.
• Documentation of registration and enrollment necessary to activate manufacturer’s standard warranty on all new equipment.
6.0 Government Furnished
Access to the work site during normal business hours (0730-1700 M-F, excluding Federal Holidays) Parking and storage areas in the vicinity of the work area. Coordinate final locations with SPOC.
120V power supply in the vicinity of the work area. Contractor shall provide any required extension cords Potable water supply in the vicinity of the work area. Contractor shall provide any required hoses.
Access to public restrooms
7.0 Travel
Travel costs associated with the work shall be included in the overall fixed price provided in response to this SOW.
8.0 Contractor’s Key Personnel
Contractor’s Key Personnel and associated key duties are noted below. Any proposed changes to Key Personnel shall be approved by the COR prior to implementation.
Site Superintendent – Contractor’s onsite representative, directly involved in oversight of all work throughout the duration of the project and having the knowledge and authority to coordinate project-related decisions with the COR.
Installing Contractor shall be appropriately licensed; technicians EPA 608-certified; follow OSHA safety requirements and manufacturer instructions.
9.0 Government’s Key Personnel
Contracting Officer (CO): Chad Schmele; chad.schmele@usda.gov Contracting Officer’s Representative (COR): Jason Anderson, Jason.L.anderson@usda.gov, 828-712-1923 Site Point of Contact (SPOC): Julie Arnold julie.a.arnold@usda.gov
10.0 Schedule
The Contractor shall begin performance within 30 calendar days and complete it within 60 calendar days after receiving authorization to begin work from the Contracting Officer.
https://www.energystar.gov/products https://www.energy.gov/eere/femp/search-energy-efficient-products mailto:chad.schmele@usda.gov mailto:Jason.L.anderson@usda.gov mailto:julie.a.arnold@usda.gov
11.0 Security Requirements
Contractor’s employees and subcontractors are required to check in with the site point of contact every day prior to beginning work. The SPOC will coordinate daily requirements for sign in and provide access to work areas as needed.
12.0 Clean Up/Disposal
Contractor shall provide daily removal of work-related debris and trash from the building to the disposal location.
Contractor shall provide final cleaning to restore workspace to original condition or better.
Onsite Dumpster is NOT available for use by the Contractor.
The Contractor is encouraged divert as much material as possible from disposal in a solid waste landfill by utilizing salvage businesses for the recyclable content generated from the work.
13.0 Data Rights
N/A
14.0 Section 508 – Electronic and Information Technology Standards N/A
Figure 1 - Schedule indicating design information for existing HP3
Figure 2 - Mechanical Plan
Figure 3 - Existing HP3 Thermostat
Figure 4 - Existing HP3 package unit
Figure 5 - Existing HP3 Nameplate Data
Figure 6 - HP3 package unit interior
Attachment
| General Information |
| 1.0 Scope of Work |
| 2.0 Background |
| Contractor Requirements |
| 3.0 Technical Requirements/Tasks |
| 3.1 HVAC Equipment Replacement |
| 4.0 Materials |
| 4.1 HVAC Equipment Replacement |
| 5.0 Submittals |
| 6.0 Government Furnished |
| 7.0 Travel |
| 8.0 Contractor’s Key Personnel |
| 9.0 Government’s Key Personnel |
| 10.0 Schedule |
| 11.0 Security Requirements |
| 12.0 Clean Up/Disposal |
| 13.0 Data Rights |
| 14.0 Section 508 – Electronic and Information Technology Standards |