1240BE26Q0065 Attachment 5 Table - Work List.xlsx

XLSX spreadsheet 27 KB Posted

Attached to
Willamette NF, MF 26-1 Willamette Complex North Suppression Repair Road Maintenance
Solicitation number
1240BE26Q0065
Issued by

About this file

This is a work list attachment detailing road maintenance quantities and specifications for the Willamette National Forest, MF 26-1 Willamette Complex North Suppression Repair project. The attachment itemizes work across multiple National Forest Service Roads (NFSR) with specific quantities and locations for surface maintenance, spot surfacing, ditch cleaning, material hauling, water bar installation, and roadside brushing activities.

The work list specifies maintenance-level 2 roads requiring spot surfacing with 3/4-inch minus material using roller compaction, with quantities totaling 121.97 miles of surface maintenance, 8,490 cubic yards of aggregate material, 8,420 cubic yards of load-haul-place operations, 12 water bar installations, 38.58 miles of ditch cleaning, 36.44 miles of ditch and drainage structure cleaning, 20 individual activities, 3.30 miles of haybale roadside brushing, and 10 miles of logging-out maintenance. All road maintenance work must be completed between June 1 and October 30, with contractor requests to work outside this window requiring verbal or written approval from the Contracting Officer's Representative following coordination with District Resource Specialists. Government-furnished culverts and guardrails must be installed by the contractor, and temporary traffic control and erosion control measures are required, particularly when working outside normal operating windows. The work spans 18 distinct road segments with varying scope requirements identified by beginning-of-project (BOP) and end-of-project (EOP) mileposts.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MF 26-1 DOW

ATTACHMENT 5 - TABLE: WORK LIST
Willamette NF, MF 26-1 Willamette Complex SR Road MaintenanceQUANTITIESNOTES
WILLAMETTE NATIONAL FOREST

ROAD MAINTENANCE

SUPPLEMENTAL SPECIFICATIONSSURFACE MAINTENANCE LEVEL 2 ROADS WITH ROLLER COMPACTIONSPOT SURFACING, GRADIATION
3/4 INCH MINUSLOAD, HAUL, AND PLACE MATERIALS LESS THAN
5 MILES ONE WAY HAULWATER BAR INSTALLATIONCLEAN DITCHES AND DRAINAGE STRUCTURESCLEAN DITCHESHAYBALEROADSIDE BRUSHINGLOGGING OUT MAINTENANCE LEVEL 2 ROADSMOBILIZATION
MILEPOSTLINE ITEM NUMBER:0001- 8110002 - 8130003 - 8320004 - 8330005 - 834(1)0006 - 834(2)0007 - 8410008 - 8420009 - 851881
UNIT OF MEASURE:MICYCYEAMIMIEAMIMILS
BEGINENDDESCRIPTION OF WORKX - SIGNIFIES LS QUANTITY DESIGNATED AS "ALL"
--ALL ROADS

- IMPLEMENT TEMPORARY TRAFFIC CONTROL,

ALL GOVERNMENT FURNISHED CULVERTS AND GUARDRAILS SUPPLIES SHALL BE FURNISHED BY THE CONTRACTOR

- IMPLEMENT EROSION CONTROL MEASURE WHEN WORKING OUTSIDE OF THE NORMAL OPERATING WINDOW.

-ALL ROAD MAINTENANCE WORK INCLUDING BUT NOT LIMITED TO SURFACE MAINTENANCE, DITCH CLEANING, AND SPOT SURFACING SHALL BE COMPLETED BETWEEN (06/01 AND 10/30). IF THE CONTRACTOR DESIRES TO WORK OUTSIDE OF THIS WINDOW THEY MUST SUBMIT A VERBAL OR WRITTEN REQUEST TO THE COR TO CONTINUE WORK. THE COR WILL THEN MEET WITH THE DISTRICT RESOURCE SPECIALISTS TO DETERMINE IF AND WHEN THE CONTRACTOR CAN OPERATE DURING THE WET SEASON.2020X
NFSR #1824000
0.20BOP NFSR #1824000 BEGINNING OF AGGREGATE

I. BEGIN SURFACE MAINTENANCE

II. BEGIN SPOT SURFACING9.81500
10.01EOP NFSR #1824000

I. END SURFACE MAINTENANCE

II. END SPOT SURFACING

NFSR #1824140
0.00BOP NFSR #1824140

I. BEGIN SURFACE MAINTENANCE

II. BEGIN SPOT SURFACING

III. BEGIN CLEAN DITCHES

IV. BEGIN LOAD, HAUL, AND PLACE7.114007007.11
7.11EOP NFSR #1824140

I. END SURFACE MAINTENANCE

II. END SPOT SURFACING

III. END CLEAN DITCHES

IV. END LOAD, HAUL, AND PLACE

NFSR #1824142
0.00BOP NFSR #1824142

I. BEGIN SURFACE MAINTENANCE

II. BEGIN SPOT SURFACING 4.51 540 240 CY of the 540 CY should be pit run borrowed from the source immediately next to the slump

4.51 EOP NFSR #1824142

I. END SURFACE MAINTENANCE

II. END SPOT SURFACING

NFSR #1824226
0.00BOP NFSR #1824226

I. BEGIN SURFACE MAINTENANCE

II. BEGIN SPOT SURFACING0.78150
0.78EOP NFSR #1824226

I. END SURFACE MAINTENANCE

II. END SPOT SURFACING

NFSR #1911000
0.00BOP NFSR #1911000

I. BEGIN SURFACE MAINTENANCE

II. BEGIN SPOT SURFACING

III. BEGIN CLEAN DITCHES

IV. BEGIN LOAD, HAUL, AND PLACE

V. BEGIN INSTALL WATER BARS2.4900900102.4
2.40EOP NFSR #1911000

I. END SURFACE MAINTENANCE

II. END SPOT SURFACING

III. END CLEAN DITCHES

IV. END LOAD, HAUL, AND PLACE

V. END INSTALL WATER BARS

NFSR #1912000
0.00BOP NFSR #1912000

I. BEGIN SURFACE MAINTENANCE

II. BEGIN SPOT SURFACING

III. BEGIN CLEAN DITCHES AND DRAINAGE STRUCTURES

IV. BEGIN LOAD, HAUL, AND PLACE17.2310001,70017.23
17.23EOP NFSR #1911000

I. END SURFACE MAINTENANCE

II. END SPOT SURFACING

III. END CLEAN DITCHES AND DRAINAGE STRUCTURES

IV. END LOAD, HAUL, AND PLACE

NFSR #1919000
0.00BOP NFSR #1919000

I. BEGIN SURFACE MAINTENANCE

II. BEGIN SPOT SURFACING

III. BEGIN CLEAN DITCHES AND DRAINAGE STRUCTURES

IV.BEGIN LOAD, HAUL, AND PLACE4.305004004.3
4.30EOP NFSR #1919000

I. END SURFACE MAINTENANCE

II. END SPOT SURFACING

III. END CLEAN DITCHES AND DRAINAGE STRUCTURES

IV.END LOAD, HAUL, AND PLACE

NFSR #1920000
0.00BOP NFSR #1920000

I. BEGIN SURFACE MAINTENANCE

II. BEGIN SPOT SURFACING

III. BEGIN CLEAN DITCHES

IV. BEGIN LOAD, HAUL, AND PLACE6.301006506.3
6.30EOP NFSR #1920000

I. END SURFACE MAINTENANCE

II. END SPOT SURFACING

III. END CLEAN DITCHES

IV. END LOAD, HAUL, AND PLACE

NFSR #1920660
0.00BOP NFSR #1920660

I. BEGIN SURFACE MAINTENANCE

II. BEGIN SPOT SURFACING

III. BEGIN CLEAN DITCHES

IV. BEGIN LOAD, HAUL, AND PLACE31001003
3.00EOP NFSR #1920660

I. END SURFACE MAINTENANCE

II. END SPOT SURFACING

III. END CLEAN DITCHES

IV. END LOAD, HAUL, AND PLACE

NFSR #1925000
0.00BOP NFSR #1925000

I. BEGIN SURFACE MAINTENANCE

II. BEGIN SPOT SURFACING

III. BEGIN CLEAN DITCHES AND DRAINAGE STRUCTURES

IV. BEGIN LOAD, HAUL, AND PLACE14.952501,50014.95
14.95EOP NFSR #1925000

I. END SURFACE MAINTENANCE

II. END SPOT SURFACING

III. END CLEAN DITCHES AND DRAINAGE STRUCTURES

IV. END LOAD, HAUL, AND PLACE

NFSR #1925642
0.00BOP NFSR #1925642

I. BEGIN SURFACE MAINTENANCE

II. BEGIN SPOT SURFACING

III. BEGIN CLEAN DITCHES

IV. BEGIN LOAD, HAUL, AND PLACE5.11507505.1
5.10EOP NFSR #1925642

I. END SURFACE MAINTENANCE

II. END SPOT SURFACING

III. END CLEAN DITCHES

IV. END LOAD, HAUL, AND PLACE1824
NFSR #1925644
0.00BOP NFSR #1925644

I. BEGIN SURFACE MAINTENANCE

II. BEGIN SPOT SURFACING

III. BEGIN CLEAN DITCHES AND DRAINAGE STRUCTURES

IV. BEGIN LOAD, HAUL, AND PLACE2.11004202.1
2.100
NFSR #1925646
0.00BOP NFSR #1925646

I. BEGIN SURFACE MAINTENANCE

II. BEGIN SPOT SURFACING2.250
2.20EOP NFSR #1925646

I. END SURFACE MAINTENANCE

II. END SPOT SURFACING

NFSR #1926000
3.10BOP NFSR #1926000

I. BEGIN SURFACE MAINTENANCE

II. BEGIN SPOT SURFACING2.350
5.40EOP NFSR #1926000

I. END SURFACE MAINTENANCE

II. END SPOT SURFACING

NFSR #1927000
4.95BOP NFSR #1927000

I. BEGIN SURFACE MAINTENANCE

II. BEGIN SPOT SURFACING6.15450
11.10EOP NFSR #1927000

I. END SURFACE MAINTENANCE

II. END SPOT SURFACING

NFSR #1927600
0.00BOP NFSR #1927600

I. BEGIN SURFACE MAINTENANCE

II. BEGIN SPOT SURFACING1.7550
1.75EOP NFSR #1927600

I. END SURFACE MAINTENANCE

II. END SPOT SURFACING

NFSR #1927606
0.00BOP NFSR #1927606

I. BEGIN SURFACE MAINTENANCE

II. BEGIN SPOT SURFACING

III. BEGIN CLEAN DITCHES

IV. BEGIN LOAD, HAUL, AND PLACE0.631001100.63
0.63EOP NFSR #1927606

I. END SURFACE MAINTENANCE

II. END SPOT SURFACING

III. END CLEAN DITCHES

IV. END LOAD, HAUL, AND PLACE

NFSR #192800
0.00BOP NFSR #1928000

I. BEGIN SURFACE MAINTENANCE

II. BEGIN SPOT SURFACING7.7800
7.70EOP NFSR #1928000

I. END SURFACE MAINTENANCE

II. END SPOT SURFACING

NFSR #1928704
0.00BOP NFSR #1928704

I. BEGIN SURFACE MAINTENANCE

II. BEGIN SPOT SURFACING1.8360
1.80EOP NFSR #1928704

I. END SURFACE MAINTENANCE

II. END SPOT SURFACING

NFSR #1928705
0.00BOP NFSR #1928705

I. BEGIN SURFACE MAINTENANCE

II. BEGIN SPOT SURFACING1.5300
1.50EOP NFSR #1928705

I. END SURFACE MAINTENANCE

II. END SPOT SURFACING

NFSR #1928720
0.00BOP NFSR #1928720

I. BEGIN SURFACE MAINTENANCE

II. BEGIN SPOT SURFACING0.75150
0.75EOP NFSR #1928720

I. END SURFACE MAINTENANCE

II. END SPOT SURFACING

NFSR #1928725
0.00BOP NFSR #1928725

I. BEGIN SURFACE MAINTENANCE

II. BEGIN SPOT SURFACING0.6120
0.60EOP NFSR #1928725

I. END SURFACE MAINTENANCE

II. END SPOT SURFACING

NFSR #1929000
0.00BOP NFSR #1929000

I. BEGIN SURFACE MAINTENANCE

II. BEGIN SPOT SURFACING

III. BEGIN CLEAN DITCHES

IV. BEGIN LOAD, HAUL, AND PLACE7.38007307.3
6.00I, BEGIN BRUSHING1.3
7.30EOP NFSR #1929000

I. END SURFACE MAINTENANCE

II. END SPOT SURFACING

III. END CLEAN DITCHES

IV. END LOAD, HAUL, AND PLACE

V. END BRUSHING

NFSR #1932000
0.00BOP NFSR #1932000

I. BEGIN SURFACE MAINTENANCE

II. BEGIN SPOT SURFACING

III. BEGIN CLEAN DITCHES

IV. BEGIN LOAD, HAUL, AND PLACE4.61104604.6
2.60V. BEGIN BRUSHING2
4.60EOP NFSR #1932000

I. END SURFACE MAINTENANCE

II. END SPOT SURFACING

III. END CLEAN DITCHES

IV. END LOAD, HAUL, AND PLACE

V. END BRUSHING

NFSR #1932625
0.00BOP NFSR #1932625
I. BEGIN INSTALL WATER BARS2INSTALL AT STAKED LOCATIONS
1.20EOP NFSR #1932625

I. END INSTALL WATER BARS

NFSR #1940000
0.00BOP NFSR #1940000

I. BEGIN SURFACE MAINTENANCE

II. BEGIN SPOT SURFACING7.1460
7.10BOP NFSR #1940000

I. END SURFACE MAINTENANCE

II. END SPOT SURFACING

TOTAL 121.97 8490 8,420 12 38.58 36.44 20 3.30 10 ALL