1240BE26Q0065 Attachment 4 Specs for Maintenance of Roads.pdf
PDF 3 MB Posted
- Solicitation number
- 1240BE26Q0065
About this file
This document is a Special Project Specification for road maintenance services on the Willamette National Forest, specifically for the MF 26-1 Willamette Complex North Suppression Repair Road Maintenance project (Contract No. 1240BE26Q0065).
The specification establishes comprehensive requirements and performance standards for multiple road maintenance activities, including surface maintenance with roller compaction on Maintenance Level 2 roads (Section 811, measured in miles), spot surfacing with specific aggregate gradations (Section 813, measured in cubic yards), load/haul/place materials (Section 832, measured in cubic yards), drainage structure installation or removal including water-bars (Section 833, measured per unit), roadway drainage system maintenance including culvert cleaning and ditch work (Section 834, measured in miles), erosion control via hay/straw mulch application (Section 841, measured per bale), roadway vegetation maintenance including brushing on Level 2 roads (Section 842, measured in miles), hazard and obstruction removal including tree felling and logging out (Section 851, measured in miles), and mobilization/equipment moving (Section 881, measured as lump sum or miles). The specifications include detailed definitions of road maintenance terminology, measurement methodologies using U.S. Customary Units, and extensive acceptable quality levels with major and minor defect categories, allowable defect thresholds, and required corrective actions for each work type. All materials transported to National Forest System lands must be weed-free, equipment must be cleaned and inspected, and work must comply with safety plans and erosion control measures. Vegetation removal is limited to trees less than 6 inches in diameter, stump heights must not exceed 12 inches on uphill sides during tree felling, and drainage systems must remain unobstructed to maintain proper water flow.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
800-F1 DEFINITIONS AND ABREVIATIONS
800.01 Definitions
Wherever in these specifications, or in other contract documents, the following terms, or pronouns in place of them, are used, the intent and meaning shall be interpreted as follows:
1. Agreed or Approved - Official agreement or approval by use of a written document issued by the Government. Agreements also require signature of Service Provider's Representative and are dated.
2. Base course - The layer or layers of material placed on a subbase or a subgrade to support a surface course. (See Illustration of Road Maintenance Terms.)
3. Berm - A curb or dike that controls roadway runoff water, or delineates traffic direction.
4. Catch Basin. The area immediately adjacent to inlet invert of the culvert.
5. Channel. A natural waterway leading into or away from a culvert or bridge.
6. Culvert. Any structure that provides a passageway, drain, or waterway under a road or embankment.
7. Lead-off ditch. A ditch used to remove water from roadside drainage ditches, the roadway, cattleguards, or drainage structures such as culverts and drainage dips.
8. Ditch. A relatively long narrow excavation placed to collect or disperse water.
9. Rolling dip. A drainage structure placed within the roadbed surface to form a uniform depression that allows routine passage of vehicles while diverting water from the traveled way.
10. Drainage ditch. A ditch located parallel to and abutting the roadbed.
11. Drainage structure. A term identifying manufactured devices placed to control water movements.
12. Drawings. Illustrations showing details of required work.
13. Equipment. All machinery, operating supplies and tools necessary for the proper performance and acceptable completion of the work.
14. Excess Material. Material from the roadway in excess to that needed for maintenance of roadway.
ATTACHMENT 4 SPECIFICATIONS FOR MAINTENANCE OF ROADS
SPECIAL PROJECT SPECIFICATION (01/15)
1240BE26Q0065
Willamette NF, MF 26-1 Willamette Complex North Suppression Repair Road Maintenance
15. Foreslope. The slope of the ditch section nearest to the traveled way.
16. Grade. The vertical alignment of the top surface of the road.
17. Highway Vehicles. Vehicles such as, passenger cars and high clearance vehicles.
18. High Clearance Vehicles. Vehicles such as, pickups, 4x4s, and log trucks.
19. Materials. Any substances specified for use in the performance of the work.
20. Measurement. The process of identifying the dimensions, quantity, or capacity of an item..
21. Nominal Dimensions or Weights. The numerical values shown on the drawings or in the specifications as measurements for the work.
22. Original Contract Quantities. Those estimated quantities shown in the Schedule of Items as awarded.
23. Patching. Minor repairs.
24. Paved Surface or Pavement. Denotes asphalt, concrete, or other stabilized materials excluding natural aggregates. Dust palliative treatments are not considered as pavement.
25. Right-of-Way. A general term denoting (1) the privilege to pass over land in some particular line (including easement, lease, permit, or license to occupy, use, or traverse public or private Lands), or (2) real property necessary for the project, including roadway, buffer areas, access, and drainage areas.
26. Roadbed. The portion of a road between the intersection of the subgrade and side slopes, excluding that portion of the ditch below the subgrade.
27. Road Listing. A preliminary listing of road locations and any established work priorities.
28. Schedule of Items. A schedule in the contract that contains a listing and description of maintenance items, quantities, units of measure, methods of measurement, unit price, and amount.
29. Shoulder. The portion of the roadway continuous to the traveled way for accommodation of stopped vehicles, emergency use, and lateral support of travel way structure.
30. Slough or Slide. Material deposited on the roadway that may need to be repositioned or removed.
1240BE26Q0065
31. Slump. A localized portion of the roadbed that has slipped, or otherwise become lower than the adjacent roadbed, and constitutes a hazard to traffic.
32. Standard Specifications. Specifications for all divisions of work.
33. Subgrade. Top surface of roadbed upon which the pavement structure, shoulders, and curbs are constructed.
34. Traveled Way. The portion of the roadway designated for the movement of vehicles, exclusive of shoulders but including turnouts and curve widening.
35. Turnouts. A short auxiliary lane on a one-lane road provided for passage of meeting vehicles.
36. Unit of Measure. The unit and fractions of units shown in the Schedule of Items.
37. Unsuitable Material. Material removed during maintenance, which must be disposed of in designated locations. Includes material with substantial amounts of vegetation or other objectionable material.
38. Water-bar. A deeper type ditch placed across the roadbed to remove water from the roadbed surface, which is not intended for standard passenger vehicles; usually placed diagonal to the centerline.
39. Work Schedule. The Service Provider's current schedule for work progression.
40. DBH. Tree diameter at breast height.
1240BE26Q0065
800.02 Abbreviations
Whenever in these specifications, or in other contract documents, the following terms, or pronouns in place of them, are used, the intent and meaning shall be interpreted as follows:
(Reference to a specific standard or specification shall mean the latest addition or amendment thereto in effect on date of Invitation for Bids.)
AASHTO – American Association of State Highway and Transportation Officials.
ASTM – American Society for Testing and Materials.
EPA – Environmental Protection Agency.
FAR – Federal Acquisition Regulation System.
FED SPEC – Federal Specifications.
MUTCD – Manual of Uniform Traffic Control Devices.
NBS – National Bureau of Standards.
OSHA – Occupational Safety and Health Act.
1240BE26Q0065
Illustration of Road Maintenance Terms.
R ig ht of
W ay
R oa ds id e R oa ds id e
C le ar in g W id th
R oa dw ay
C le ar in g Li m it
X Y
G ro un d
Li ne
Tr av el ed
W ay C L
B er m S ur fa ce C ou rs e B as e
C ou rs e
Fi ll
S lo pe
B ac k S lo pe
D ra in ag e D itc h
G ro un d
Li ne
S ub gr ad e
R oa d B ed
S ha pe s an d di m en si on s w ill va ry to fi t l oc al c on di tio ns
S ee d ra w in gs fo r t yp ic al s ec tio ns
X a nd Y d en ot e cl ea rin g ou ts id e of ro ad w ay
N ot e:
Right - of - Way Line
Right - of - Way Line
Clearing Limit
Shoulder
Shoulder
1240BE26Q0065
SPECIAL PROJECT SPECIFICATION (12/11)
801-F1 QUANTITY MEASUREMENT TERMS
801.01 Measurement Terms
1. U.S. Customary Units of measure are used in conjunction with these specifications.
2. The methods of measurement and computation will be those necessary to accurately determine the quantities of materials furnished and work performed.
3. All items, which are measured by the feet, will be measured parallel to its longitudinal centerline, unless otherwise shown on the drawings.
4. Miles will, in the absence of known distances from existing plans or surveys, be determined by the Government using a calibrated survey odometer or equal substitute operated on the traveled way at or parallel to road centerline.
5. The term "ton" means 2000 pounds. Trucks used to haul material measured by truck weight shall be weighed empty at least once daily, and each truck shall bear a plainly legible identification mark. Weigh tickets furnished by the Contractor from certified scales will be used to determine weight measurements.
6. Materials measured by the cubic yard in the hauling vehicle shall be measured therein at the point of delivery. Vehicles may be of any size or type, provided that the box is of such shape that the actual volume may be readily and accurately determined. The exception is spot rock surfacing which is measured as compacted in place.
7. The term "lump sum" when used in the Schedule of Items means the complete unit as required by or described in the contract.
8. Measurement will be made of each item or unit of work, as shown in the Schedule of Items, completed and accepted in accordance with the contract provisions, specifications, and drawings.
1240BE26Q0065
811-F1 SURFACE MAINTENANCE
811.01 Service Required
Smooth and shape native or aggregate surfaced roads including traveled way, shoulders, turnouts, and intersections. Reshape or recondition ditches, water bars, and drain dips.
When roller comapaction is required, a minimum of an 7-10 ton vibratory roller will be operated over the full width of the roadway for a minimum of 3 complete passes over the full width until there is no visible evidence of consolidation. One pass is defined as operating the vibratory roller from the point where blading begins to the point where blading ends. Adjust the moisture content to a level suitable for compaction.
811.02 Performance Standards
Maintenance Level 2-4 Roads
A road surface is maintained to standard when the surface is compact (when required), crowned, or sloped to drain, without segregation of the surfacing materials. The road surface has no ruts, rills or other irregularities & suitable materials have been recovered and incorporated. Unsuitable materials have been removed. Ditches and road surface drainage structures function efficiently.
When ordered by the Contracting Officer to work in a weed infested area the contractor will be required to prevent spreading the infestation into un-infested areas by cleaning equipment. The contractor will use wash stations approved by the Contracting Officer.
811.03 Location of Work
As specified on roads listed on the ROAD LISTING, SHOWN ON THE PLANS, marked on the ground, or as ordered by the Contracting Officer. Locations of weed infested areas are marked on the ground. Do not operate in the weed infested areas unless ordered to do so by the Contracting Officer.
1240BE26Q0065
811.04 Measurement
Measurement under this Section will be made by the total number of units for each item listed in the SCHEDULE OF ITEMS completed and accepted.
A. Mile: Surface maintenance will be measured along the centerline of the roadway. Turnouts are incidental. Measurement will be to the nearest one-tenth (0.1) mile.
811.05 Payment
The accepted quantities will be paid at the contract price per unit of measurement for the Section 811 pay items listed in the schedule of items.
Payment will be full compensation for the work prescribed in this Section.
Pay Item Pay Unit
811 Mile Surface Maintenance Level 2 Roads with Roller Compaction
1240BE26Q0065
811.06 Acceptable Quality Levels
Description Major Minor Allowable Defects Required Action Defect Defect Major Minor Major Minor
Surface Irregularities (Level 4&5)
Potholes greater than 2" deep and wider than 1 foot
Potholes 2" or less deep and 1 foot or less wide 0 per unit 2 per unit Rework if greater than 0 major defects
Rework if greater than 2 minor defects
Washboards greater than 1" deep
Washboards 1” or less deep and not exceeding 20 feet long
0 per unit 2 per unit Rework if greater than 0 major defects Rework if greater than 2 minor defects
Surface Irregularities (Level 3)
Potholes greater than 2" deep and wider than 1 foot
Potholes 2” or less deep and 1 foot or less wide 0 per unit 2 per unit Rework if greater than 0 major defects
Rework if greater than 2 minor defects
Washboards greater than 1" deep
Washboards less than 1" deep and not exceeding 20 feet long
0 per unit 4 per unit Rework if greater than 0 major defects Rework if greater than 4 minor defects
Road Cross Section (Level 4)
Crown or Cross Slope is not uniform and does not drain as specified on more than 250' of surface per mile
Crown or Cross Slope is not uniform and does not drain as specified on less than 250' of surface per mile
0 1 per unit Rework Rework if greater than 1 minor defects
Road Cross Section (Level 3)
Crown or Cross Slope is not uniform and does not drain as specified on more than 250' of surface per mile
Crown or Cross Slope is not uniform and does not drain as specified on less than 250' of surface per mile
0 1 per unit Rework Rework if greater than 1 minor defects
Road Cross Section (Level 2)
Road surface does not drain properly and causes erosion, or obstructs high clearance vehicles
Road surface does not drain properly, but does not cause erosion 0 2 per unit Rework if greater than 0 major defects Rework if greater than 2 minor defects
Oversized Material (Level 3&4 aggregate surfaced roads)
Material greater than 3" diameter remaining on the road surface
Material less than 3" diameter remaining on the road surface and traffic safety is not compromised
0 5 per unit Rework if greater than 0 major defects
Rework if greater than 5 minor defects
Oversized Material (Level 2)
Objects in traveled way that obstruct high clearance vehicles
Debris in traveled way that may impede high clearance vehicles
0 5 per unit Rework Rework if greater than 5 minor defects
1240BE26Q0065
Description Major Minor Allowable Defects Required Action Defect Defect Major Minor Major Minor
Aggregate Surface Quality
Gradation of surface aggregate is degraded by more than 10 %
Gradation of surface aggregate is degraded by less than 10 %
0 5 per unit Rework Rework if greater than 5 minor defects
A loss of more than 10 CY/mile
A loss of less than 10 CY/mile 0 5 per unit Replace or recover lost material Accept the loss of material surfacing is segregated over more than a 100 square yard area per 1000 linear feet of road and traffic safety is compromised surfacing is segregated over less than a 100 square yard area per 1000 linear feet of road and traffic safety is not compromised
0 N/A Rework Accept the loss of surface quality
Backslopes Undercut backslope will result in destabilization of slope
Undercut backslope will not result in destabilization of slope
0 2 per unit Repair and Stabilize Revegetate if greater than 2 minor defects
Compaction Visible displacement occurs under hauling or spreading equipment
N/A 0 N/A Rework N/A
Ditches and Road Drainage Structures
Impeded flow or water diverted out of drainage structures
< 20% impeded, but water will stay in the channel 0 2 per unit Rework Rework if greater than 2 minor defects
Unpaved Shoulders (Level 3 & 4)
Elevation difference between pavement and shoulder is greater than 1"
Elevation difference between pavement and shoulder is less than 1" 0 5 per unit Rework Rework if greater than 5 minor defects
Material greater than 1/4" diameter remaining on the road surface
Material 1/4" diameter or less remaining on the road surface and traffic safety is not compromised
0 5 per unit Rework Rework if greater than 5 minor defects
Does not drain away from pavement
Does not drain away from pavement 0 0 Rework Rework
Working outside of project limits
Area contains invasive weeds N/A 0 N/A
Repair and treat affected areas as directed by the
Contracting Officer
N/A
1240BE26Q0065
1240BE26Q0065
813-F1 SPOT SURFACING
813.01 Service Required
Load, haul, and place surface material to repair or stabilize road surfaces.
Roller compaction is required. A minimum of an 7-10 ton vibratory roller will be operated over the full width of the roadway for a minimum of 3 complete passes over the full width until there is no visible evidence of consolidation. One pass is defined as operating the vibratory roller from the point where blading begins to the point where blading ends. Adjust the moisture content to a level suitable for compaction.
813.02 Performance Standard
A. Spot surfacing is complete when the designated quantity of the ordered material has been placed.
B. Spot surfacing material shall come form a commercial source, purchased by the contractor. All materials transported onto National Forest System land will be weed-free. Written documentation of methods used to determine the weed-free status of any and all materials furnished by the contractor will be furnished to the Contracting Officer before transport of any materials onto National Forest System land.
C. All suitable and adequate Government furnished materials and gradations shalll be SHOWN ON THE PLANS.
813.03 Location of Work
As specified on roads listed on the ROAD LISTING, SHOWN ON THE PLANS, or as ordered by the Contracting Officer.
813.04 Measurement
Measurement under this Section will be made by the total number of units for each item listed in the SCHEDULE OF ITEMS completed and accepted.
A. Measure spot rock by the final cubic yard in-place.
B. Material measured by the ton shall be verified by certified weight tickets
1240BE26Q0065
813.05 Payment
The accepted quantities will be paid at the contract price per unit of measurement for the Section 813 pay items listed in the schedule of items.
Payment will be full compensation for the work prescribed in this Section.
Pay Item Pay Unit
813 Cubic Yard Spot Surfacing, Gradation __3/4" -
1240BE26Q0065
813.06
Description Major Minor Allowable
Defects Required Action Defect Defect Major Minor Major Minor
Depth of Aggregate
Dimension of spot surfacing deviates by more than 1" from depth specified. Or less than 1" from dimension specified but is consistently high or low.
Dimension of spot surfacing deviates by 1" or less than from depth specified and not consistently high or low.
0 N/A
If depth is low, correct placement of aggregate to specified dimensions. If depth is high only pay for ordered amount
Accept aggregate as placed, pay only for delivered quantities.
Width of Aggregate
Dimension of spot surfacing is less than specified width or more than 1' wider than specified.
Dimension of spot surfacing is up to 1' wider than specified but not consistently wide.
0 N/A
If width is narrow, correct placement of aggregate to specified dimensions. If width is too wide reshape.
Accept aggregate as placed, pay only for delivered quantities.
Length
Dimension of spot surfacing is shorter than specified length or more than 100' longer than specified.
Dimension of spot surfacing is shorter than specified length or up to 100' longer than specified.
0 N/A
If length is shorter than specified, correct placement of aggregate to specified dimensions. If too long pay only for ordered amount.
Accept aggregate as placed, pay only for delivered quantities.
Compaction Visible displacement occurs under heavy spreading equipment
N/A 0 N/A Rework N/A
Aggregate Quality
Does not meet specified gradation or durability requirements and is not suitable for intended use
Does not meet specified gradation or durability requirements and is suitable for intended use
0 N/A Reject and replace Accept but may reduce payment.
Material source does not meet weed free requirement N/A 0 N/A Reject source N/A
Finish Quality
Spot surfacing doesn’t conform to the adjacent road segments and traffic is impeded.
Spot surfacing generally conforms to the adjacent road segments, but traffic may be slowed.
0 2 per unit
Reshape or recompact surfacing as needed.
Accept but may reduce payment.
1240BE26Q0065
832-F1 LOAD, HAUL, AND PLACE MATERIALS
832.01 Service Required
Load, haul, and place material at designated sites.
832.02 Performance Standard
Loading, hauling, and placing is complete when no obstruction remains in or adjacent to the roadway or in ditches which would have the potential to interfere with traffic use, block or divert water from structures or channels. This includes relocation, repositioning and stabilization as ordered by the Contracting Officer.
832.03 Location of Work
As specified on roads listed on the ROAD LISTING, SHOWN ON THE PLANS, or as ordered by the Contracting Officer.
832.04 Measurement
Measurement under this Section will be made by the total number of units for each item listed in the SCHEDULE OF ITEMS completed and accepted.
A. Cubic Yard: The quantity will be the number of cubic yards measured in the vehicles.
832.05 Payment
The accepted quantities will be paid at the contract price per unit of measurement for the Section 832 pay items listed in the schedule of items. Payment will be full compensation for the work prescribed in this Section.
Pay Item Pay Unit
832 Cubic Yard Load, Haul, and Place Materials, Less Than 5 Miles One Way Haul
1240BE26Q0065
832.06
Description Major Minor Allowable Defects Required Action Defect Defect Major Minor Major Minor
Slopes
Unstable material left on slopes
Material left on slopes that can be stabilized and won't block drainages
0 1 per unit Remove
Remove or stabilize in place
Backslopes
Undercut backslope will result in destabilization of slope
Undercut backslope will not result in destabilization of slope
0 1 per unit Repair and Stabilize
Revegetate if greater than 1 minor defects
Ditches, inlet/outlet channels, streams and catch basins water will be diverted out of the drainage structure or soil enters system
< 20% impeded, but water will stay in the channel. 0 1 per unit Rework
Rework if greater than 1 minor defects
Debris on Road (ML 4-5) Any debris in traveled way
Debris in traveled way that may slow or impede traffic.
0 2 per unit Rework Rework if greater than 2 minor defects
Debris on Road (ML 3) Debris in traveled way that may impede traffic.
Debris in traveled way that may slow traffic. 0 3 per unit Rework
Rework if greater than 3 minor defects
Debris on Road (ML 2) Objects in traveled way that obstruct high clearance vehicles
Debris in traveled way that may impede high clearance vehicles
0 5 per unit Rework Rework if greater than 5 minor defects
Placed Material (Disposal Sites)
Unstable material on designated sites. N/A 0 N/A Stabilize N/A
Revegetation No revegetation work done
Revegetation work incomplete N/A N/A N/A N/A
Work Area Management
Not following approved safety plan which may include signs, flaggers, and other temporary traffic control measures
Not following approved safety plan which may include signs, flaggers, and other temporary traffic control measures
0 0
Suspend work until in compliance
Suspend work until in compliance
1240BE26Q0065
SPECIAL PROJECT SPECIFICATION (01/15)
833-F1 DRAINAGE STRUCTURE INSTALLATION OR REMOVAL
833.01 Service Required
Install or remove drainage structures including culverts, water-bars and rolling dips.
833.02 Performance Standard
A. Drainage structure installation is complete when water-bars and rolling dips have been installed to the lines and grades specified, and drainage structure removal is complete when designated culverts have been removed and culverts have been properly disposed of.
B. Disposal of culvert materials removed shall be removed from National Forest lands and disposed of in a legal manner. Disposal considered to be incidental to drainage structure removal.
833.03 Location of Work
As specified on roads listed on the ROAD LISTING, SHOWN ON THE PLANS, or as ordered by the Contracting Officer.
833.04 Measurement
Measurement under this Section will be made by the total number of units for each item listed in the SCHEDULE OF ITEMS completed and accepted.
A. Each: Measured by the total number of units for each item in the schedule of items completed and accepted.
833.05 Payment
The accepted quantities will be paid at the contract price per unit of measurement for the Section 833 pay items listed in the schedule of items. Payment will be full compensation for the work prescribed in this Section.
Pay Item Pay Unit
833 Each Water-bar Installation
1240BE26Q0065
833.06
Description Major Minor Allowable Defects Required Action Defect Defect Major Minor Major Minor
Culvert size
Culvert is smaller than the designated diameter shown on the drawings.
Culvert is larger than the designated diameter shown on the drawings. 0 N/A
Remove culvert and replace with designated size
Accept if culvert fits the geometry of the road but pay at designated size otherwise replace
Culvert is shorter than the designated length shown on the drawings.
Culvert is longer than the designated length shown on the drawings. 0 0
Replace or add section to fit geometry of road.
Remove excess culvert and treat cut end, or harden fill slope to prevent erosion and pay for ordered length
Grade and alignment of culvert
More than 10% deviation from original lines and grades.
10% or less deviation from original lines and grades.
0 1 per unit Remove and replace culvert
Repair if greater than 1 minor defects
Sag or depression in road after placement of culvert and backfill material
Greater than 2 inch depression in traveled way
2 inch or less depression in traveled way 0 1 per unit
Furnish, place and compact designated material to repair depression.
Repair if greater than 1 minor defects
Removed culvert or pieces left on National Forest System Lands
Culverts or pieces of culvert left on National Forest System Lands
N/A 0 N/A Remove from National Forest System Lands
N/A
Water-bars More than 10% deviation from original lines and grades.
10% or less deviation from original lines and grades.
0 2 per unit Rework Rework if greater than 2 minor defects
Rolling Dip More than 10% deviation from specified lines and grades
10% or less deviation from specified lines and grades
0 1 per unit Rework Rework if minor defects interfere with proper drainage
Sedimentation Operations cause or allow sediment to leave site.
N/A 0 N/A Cease operations until sediment is controlled
N/A
Work Area Management
Not following approved safety plan which may include signs, flaggers, and other temporary traffic control measures
Not following approved safety plan which may include signs, flaggers, and other temporary traffic control measures
0 0
Suspend work until in compliance
Suspend work until in compliance
1240BE26Q0065
834-F1 ROADWAY DRAINAGE SYSTEM MAINTENANCE
834.01 Service Required
Clean and recondition roadway drainage systems including culverts, ditches, inlet and outlet channels, catch basins, and appurtenances.
834.02 Performance Standard
Drainage system maintenance is complete when no obstruction remains in the defined area adjacent to the structure or in ditches which would have the potential to block water from entering the structure, back water into the structure (except for structures designed to function in a back-flooded manner), or divert water outside the defined channel. Equipment operation in live streams or hydraulic flushing of drainage structures is not permitted.
Materials produced during drainage system maintenance activities may be repositioned in a stable manner, as directed and approved by the Contracting Officer. Material requiring end haul shall be compensated for separately.
When ordered by the Contracting Officer to work in a weed infested area the contractor will be required to prevent spreading the infestation into un-infested areas by cleaning equipment. The contractor will use wash stations approved by the Contracting Officer.
Recondition damaged culverts by straightening bent inlet and outlet ends, and tightening any loose bands or fittings. This work is limited to that which can be done with a pry bar, hydraulic jack, or other similar hand tools.
834.03 Location of Work
As specified on roads listed on the road listing, shown on the plans, marked on the ground and/or ordered by the Contracting Officer and;
A. Drainage structures including inlet structures, culverts, catch basins, inlet/outlet channels, and ditches within the area shown on the plans or in the supplemental specifications.
B. Culverts - a minimum external horizontal distance of 20 feet in any direction from the inlet and outlet end and a minimum internal distance of 3 feet from the inlet and outlet ends.
C. Ditches adjacent to the roadbed.
1240BE26Q0065
D. This work does not include bridges, cattle guards, drain dips, or water bars.
E. Do not operate in the weed infested areas marked on the ground unless ordered to do so by the Contracting Officer.
834.04 Measurement
Measurement under this Section will be made by the total number of units for each item listed in the SCHEDULE OF ITEMS completed and accepted.
A. Mile: Work activity will be measured along the centerline of the road regardless of the number of lanes.
B. Each: Measured by the total number of units for each item in the schedule of items completed and accepted.
834.05 Payment
The accepted quantities will be paid at the contract price per unit of measurement for the Section 834 pay items listed in the schedule of items. Payment will be full compensation for the work prescribed in this Section with the exception of end haul.
All waste material produced requiring end haul will be paid at the contract price per unit of measurement for the Section 832 pay items listed in the schedule of items.
Pay Item Pay Unit
Mile Mile
834(1) Clean Ditches and Drainage Structures 834(2) Clean Ditches
1240BE26Q0065
834.06
Description Major Minor Allowable Defects Required Action Defect Defect Major Minor Major Minor
Blocked Culverts Greater than 20 % of end area blocked
20% or less of end area blocked 0 2 per unit Rework Rework if greater than 2 minor defects
Damaged Culvert Inlet/outlets
Greater than 20 % of end area blocked
20% or less of end area blocked 0 2 per unit Rework Rework if greater than 2 minor defects
Impeded flow for ditches, inlet/outlet channels, and catch basins water will be diverted out of the drainage structure or system
< 20% impeded, but water will stay in the channel.
0 2 per unit Rework Rework if greater than 2 minor defects
Debris on Road (ML 4-5) produced by Service Provider operations.
Any debris in traveled way N/A
0 N/A Rework N/A
Debris on Road (ML 3) produced by Service Provider operations.
Debris in traveled way that may impede traffic.
Debris in traveled way that may slow traffic. 0 2 per unit Rework Rework if greater than 2 minor defects
Debris on Road (ML 2) produced by Service Provider operations.
Objects in traveled way that obstruct high clearance vehicles
Debris in traveled way that may impede high clearance vehicles 0 2 per unit Rework Rework if greater than 2 minor defects
Aggregate Surface Quality
Gradation of surface aggregate is degraded by more than 10 %
Gradation of surface aggregate is degraded by 10 % or less 0 1 per unit Rework Rework if greater than 2 minor defects
Backslopes
Undercut backslope will result in destabilization of slope
Undercut backslope will not result in destabilization of slope 0 2 per unit Repair and
Stabilize Revegetate if greater than 2 minor defects
1240BE26Q0065
Vegetation woody vegetation within 5 feet of the inlet end of drainage structures or in ditches that interferes with flow low growing vegetation within 5 feet or more of inlet end of drainage structures or in ditches that does not interfere with flow
0 N/A Remove Leave in place
Work Area Management
Not following approved safety plan which may include signs, flaggers, and other temporary traffic control measures
Not following approved safety plan which may include signs, flaggers, and other temporary traffic control measures
0 0 Suspend work until in compliance
Suspend work until in compliance
Working outside project limits
Area contains invasive weeds N/A 0 N/A
Repair and treat affected areas as directed by the CO
N/A
1240BE26Q0065
841-F1 EROSION CONTROL
841.01 Service Required
Apply erosion and sediment control measures in designated areas.
841.02 Performance Standard
Treatment is complete when ordered quantities of contractor provided certified weed free hay or straw mulch have been applied to all disturbed soil areas, either by machine or hand spreading. Minimum weight of a bale of hay shall be 65 lbs.
841.03 Location of Work
As specified on roads listed on the ROAD LISTING, SHOWN ON THE PLANS, or as ordered by the Contracting Officer.
841.04 Measurement
Measurement under this Section will be made by the total number of units for each item listed in the SCHEDULE OF ITEMS completed and accepted.
A. Each: Measured by the total number of units for each item in the schedule of items completed and accepted.
841.05 Payment
The accepted quantities will be paid at the contract price per unit of measurement for the Section 841 pay items listed in the schedule of items.
Payment will be full compensation for the work prescribed in this Section.
Pay Item Pay Unit
841 Hay Bail Each
1240BE26Q0065
841.06
Description Major Minor Allowable Defects Required Action Defect Defect Major Minor Major Minor
Mulch Mulch is not as specified N/A 0 N/A Reject and replace N/A
Weeds
Does not conform to Federal, State, and Local seed and noxious weed acts and laws.
N/A 0 N/A Reject and replace N/A
Application Less than 80% of the designated area is treated
Between 80% and 100% of the designated area is treated
0 1 per unit Rework Rework if greater than 1 minor defects
Work Area Management
Not following approved safety plan which may include signs, flaggers, and other temporary traffic control measures
N/A 0 N/A Suspend work until in compliance N/A
1240BE26Q0065
VARIES
F
I
L
L
S
L
O
P
E
DIRECTION
OF RUNOFF
B A
L E
W
ID
T H
M
I N
D
IR
E C
T
IO
N
O
F R
U
N
O
F F
F R
O
M
D
IS
T
U
R
B E
D
A R
E A
S
F L O
W
VARIES
RUNOFF FROM
DISTURBED AREAS
T O
E
O
F
S
L O
P E
NOTE:
1. USE STRAW BALES IN DRAINAGE
DITCHES, OR OTHER DRAINAGE
FEATURES THAT CAN
CONTRIBUTE SEDIMENT
DELIVERY UNDER LOW FLOW
CONDITIONS.
2. WINTERIZATION AFTER THE
NORMAL OPERATING PERIOD,
OCT 31ST ,20XX
INSTALL STRAW BALES AT
LOCATIONS DIRECTED BY
CONTRACTING OFFICER ON ANY
ROADS NOT COMPLETED &
ACCEPTED.
3. ALL STRAW BAILS SHALL BE
REMOVED PRIOR TO FINAL
INSPECTION AND ACCEPTANCE.
1240BE26Q0065
Willamette NF, MF 26-1 Willamette Complex North Suppression Repair Road Maintenance
AutoCAD SHX Text Not to Scale
AutoCAD SHX Text
INSTALLATION OF A STRAW BALE BARRIER AT TOE OF FILL
AutoCAD SHX Text
PROPERLY STAKED AND ENTRENCHED STRAW BALES
AutoCAD SHX Text Not to Scale
AutoCAD SHX Text
PLAN
AutoCAD SHX Text
ELEVATION
AutoCAD SHX Text
LIMITS OF CLEARING
AutoCAD SHX Text
EXISTING GROUND
AutoCAD SHX Text
EXISTING GROUND, TYP.
AutoCAD SHX Text SECURE EACH BAIL WITH AT LEAST TWO STAKES, ANGLE THE POINT OF THE FIRST STAKE TOWARDS THE PREVIOUSLY PLACED BALE
AutoCAD SHX Text INSTALL BALES IN TRENCHES WITH ENDS OF ADJACENT BALES TIGHTLY ABUTTING EACH OTHER OR OVERLAPPING
AutoCAD SHX Text
ORIENT BALE SO THAT STRING BINDING IS PLACED HORIZONTAL
AutoCAD SHX Text
STEP 1: EXCAVATE TRENCH EXCAVATE TRENCH
AutoCAD SHX Text
STEP 2: INSTALL BALES INSTALL BALES
AutoCAD SHX Text
PLAN VIEW STEP 3: TIGHTLY PACK STRAW TIGHTLY PACK STRAW BETWEEN BALES
AutoCAD SHX Text
STEP 4: BACKFILL SOIL AGAINST BACKFILL SOIL AGAINST BALES
AutoCAD SHX Text
LOOSE STRAW TIGHTLY PACKED BETWEEN BALES
AutoCAD SHX Text
BACKFILLED AND COMPACTED SOIL
AutoCAD SHX Text
PLAN
AutoCAD SHX Text
PROVIDE SUFFICIENT LENGTH TO PREVENT WATER FROM FLOWING AROUND THE BARRIER
AutoCAD SHX Text
BUTT BALES TOGETHER
AutoCAD SHX Text
SECURE EACH BALE WITH AT LEAST 2 STAKES
AutoCAD SHX Text
ELEVATION
AutoCAD SHX Text
STAKE AND TRENCH STRAW BALE
AutoCAD SHX Text
STRAW BALE BARRIER TYPICALS
AutoCAD SHX Text Not to Scale
AutoCAD SHX Text
ANGLE STAKES TOWARDS PREVIOUSLY PLACED BALE
AutoCAD SHX Text
OVERLAP EDGES
842-F1 ROADWAY VEGETATION MAINTENANCE (2/2/16) 1
SPECIAL PROJECT SPECIFICATION (2/16)
842-F1 ROADWAY VEGETATION MAINTENANCE
842.01 Service Required
Roadside Brushing:
Remove vegetation, trees < 6 inches diameter when measured at 6 inches above the ground and limbs by mechanical brushing and hand removal methods on roadway and roadside surfaces.
842.02 Performance Standard
Roadway vegetation maintenance is complete when the vegetation has been removed and scattered from the designated treatment area not to interfere with traffic, obscures signs, impedes the flow of water or diverts water from drainage structures.
842.03 Roadside Safety
Roadside Safety refers to providing safe conditions for the traveling public and adjacent public use or recreation during mechanical brushing operations. All efforts should be made to conduct activities safely for both the public and brushing operations.
Debris caused from brushing operations should be removed from roadway surface, road shoulder and drainage feature(s) in a safe, efficient, and timely manner.
Large debris shall be placed on the downhill fill slope and shall not interfere with drainage features and structures.
1240BE26Q0065
When the traveling public, either vehicular or pedestrian enter the immediate work-zone, all brushing operations should be stopped or minimized when practicable to provide safe access past mechanical brushing equipment.
When work occurs in limited visibility areas, efforts should be made to minimize conflicts with the traveling public, such as incorporating additional work signs, or utilizing a follow vehicle to warn the approaching public of the work zone, when required.
If hazardous situations are created or detected during brushing operations (for example broken limbs, damaged trees) these should be removed or reported prior to leaving the work site each day.
842.04
Support Vehicle Operations (When Ordered)
Provide awareness of approaching brushing activities to the traveling public by utilizing a follow vehicle.
Follow vehicles shall be equipped with two-way radios, properly charged and functioning, for communication with brushing equipment during mechanical brushing operations.
The top flashing light of the support vehicle needs to be activated while the brush tractor is performing brushing operations. Equip vehicles with a minimum of two red flags, 18� square, mounted on 3� long staffs, and an approved brush cutting operations ahead sign or equivalent mounted at the rear of the vehicle.
842.05 Location of Work
As specified on roads listed on the road listing, shown on the plans, marked on the ground or ordered by the Contracting Officer.
Brushing
A. Maintenance Level 2 roads
1240BE26Q0065
842-F1 ROADWAY VEGETATION MAINTENANCE (2/2/16) 3
The treatment area will be SHOWN ON THE PLANS. Vegetation shall be removed to a maximum height of 6 inches above ground surfaces. Trees larger than 6 inches diameter when measured at 6 inches above the ground are designated to remain.
B. All roads
Locations of weed infested areas are marked on the ground. Do not operate in the weed infested areas unless ordered to do so by the Contracting Officer.
842.06 Measurement
Measurement under this Section will be made by the total number of units for each item listed in the SCHEDULE OF ITEMS completed and accepted.
A. Mile: Work activity will be measured along the road regardless of the number of lanes.
842.07 Payment
The accepted quantities will be paid at the contract price per unit of measurement for the Section 842 pay items listed in the schedule of items.
Payment will be full compensation for the work prescribed in this Section.
Pay Item Pay Unit
Mile 842 Roadside Brushing Level 2 Roads
1240BE26Q0065
842-F1 ROADWAY VEGETATION MAINTENANCE (2/2/16) 4
842.08 Acceptable Quality Levels
Description Major Minor Allowable Defects Required Action
Defect Defect Major Minor Major Minor
Tree damage Damage to more than 30% of the tree bole
Damage to 30% or less of the tree bole 1 per unit
5 per mile
Remove or Treat Treat
Horizontal Clearance More than 20% not cleared to limits
20% or less not cleared to limits 0
2 per mile
Rework Rework if greater than 2 minor defects
Vertical Clearance More than 20% not cleared to limits
20% or less not cleared to limits 0
2 per mile
Rework Rework if greater than 2 minor defects
Height above ground surface
More than 20% not cleared to limits
20% or less not cleared to limits 0
2 per mile
Rework Rework if greater than 2 minor defects
Drainage
Impeded flow or water diverted out of drainage structures.
20% or less impeded, but water will stay in the channel.
2 per mile
Rework Rework if greater than 2 minor defects
Oversized Material (Level 4&5)
Material greater than 3" diameter remaining on the road surface
Material 1� � 3� in diameter remaining on the road surface 0 0 Rework Rework
Material greater than 3" diameter and 36" in length remaining on the roadway drainages or has the potential to move into drainages.
Material 1� - 3" in diameter and greater 36" in length remaining on the roadway slopes and drainages or has the potential to move into drainages.
3 per mile
Rework Rework if greater than 5 minor defects
Oversized Material (Level 3)
Material greater than 3" diameter and 12" in length remaining on the road surface
Material 1� - 3" in diameter and 36" in length remaining on the road surface
0 0 Rework Rework
Material greater than 3" diameter and 36" in length remaining on the roadway drainages or has the potential to move into drainages.
Material 1� - 3" in diameter and greater 36" in length remaining on the roadway slopes and drainages or has the potential to move into drainages.
3 per mile
Rework Rework if greater than 5 minor defects
1240BE26Q0065
842-F1 ROADWAY VEGETATION MAINTENANCE (2/2/16) 5
Description Major Minor Allowable Defects Required Action
Defect Defect Major Minor Major Minor
Oversized Material (Level 2)
Concentrations of material greater than 6" diameter and 3 feet in length remaining on the road surface
Material less than 6" diameter and 3 feet in length remaining on the road surface
2 per mile
Rework Rework
Unstable concentrations of material less than 6" diameter and 3 feet in length remaining on the roadway slopes.
N/A 0 N/A Rework N/A
Material greater than 3" diameter and 36" in length remaining on the roadway drainages or has the potential to move into drainages.
Material 1� - 3" in diameter and greater 36" in length remaining on the roadway slopes and drainages or has the potential to move into drainages. .
5 per mile
Rework Rework if greater than 5 minor defects
Concentrations (Level 3-5)
Any concentrations that affect sight distance
N/A 0 0 Rework N/A
Work Area Management
Not following approved safety plan which may include signs, flaggers, and other temporary traffic control measures
Not following approved safety plan which may include signs, flaggers, and other temporary traffic control measures
0 0 Suspend work until in compliance Suspend work until in compliance
Working outside of project limits
Area contains invasive weeds
N/A 0 N/A
Repair and treat affected areas as directed by the
Contracting Officer
N/A
1240BE26Q0065
851-F1 HAZARD AND OBSTRUCTION REMOVAL
851.01 Service Required
Remove logs, limbs, rocks, and debris. Fell & clear designated danger trees and stabilize hazards and obstructions.
851.02 Performance Standard
A. Work is complete when logs, limbs, rocks, debris, and designated danger trees, have been removed or stabilized on-site and when the road is passable by the intended traffic.
B. Hazard or Obstructions are defined as a singular or combination of logs, limbs, rocks, and debris located at one specific location which is hazardous to or obstructs intended traffic.
C. Minimal Hazard or Obstruction removal shall be limited to logs, limbs, rocks, or debris, of sufficient size to warrant use of equipment, which can be removed and disposed of on-site with a minimal effort for removal. Examples include but are not limited to single down logs with < 4’ DBH, single large boulders which can be easily moved with road maintenance equipment or a combination of debris that shall not exceed an approximate combined volume of 10
CY.
D. Moderate Hazard or Obstruction removal shall be limited to logs, limbs, rocks, and/or debris of sufficient size to warrant use of equipment, which can be removed and disposed of on-site with a moderate effort for removal. Examples include but are not limited to single down logs with > 4’ DBH, a combination of smaller down trees, boulders, and/or debris that shall not exceed an approximate combined volume of 50 CY otherwise 832-F1 Load, Haul, and Place Materials shall be utilized for disposal off-site.
E. During tree felling, uphill stump height shall not exceed 12” above natural ground. Trees shall be completely severed from stump.
F. Felled trees & slash shall be removed from roads immediately after felling where it poses a hazard to vehicle traffic.
1240BE26Q0065
G. All hang-ups shall be pulled down to a height not to exceed 4 feet above natural ground, so that it will not lean against or be suspended by any adjacent trees or bushes.
851.03 Location of Work
As specified on roads listed on the ROAD LISTING, SHOWN ON THE PLANS, or as ordered by the Contracting Officer.
851.04 Measurement
Measurement under this Section will be made by the total number of units for each item listed in the SCHEDULE OF ITEMS completed and accepted.
A. Mile: Work activity will be measured along the centerline of the road regardless of the number of lanes.
B. Each: Measured by the total number of units for each item in the schedule of items completed and accepted.
851.05 Payment
The accepted quantities will be paid at the contract price per unit of measurement for the Section 851 pay items listed in the schedule of items. Payment will be full compensation for the work prescribed in this Section.
Pay Item Pay Unit
851(1) Mile Logging Out Maintenance Level 2 Roads
1240BE26Q0065
851.06
Discription Major Minor Allowable Defects Required Action Defect Defect Major Minor Major Minor
Utilization of Timber Log lengths do not meet utilization standards (see SPS or BPA Call)
N/A 0 N/A Charge for loss of stumpage
N/A
Stump Heights Exceed Specified Height by more than 6 inches
Exceed Specified Height by up to 6 inches
0 2 per unit Rework Rework if greater than 2 minor defects
Tree damage caused by Service Provider's operations
Damage to more than 30% of the tree bole
Damage to 30% or less of the tree bole 0 0 Remove or
Treat Treat
Impeded flow for ditches, inlet/outlet channels, and catch basins caused by Service Provider's Operations
Water will be diverted out of the drainage structure or system
20% or less impeded, but water will stay in the channel. 0 2 per unit Rework
Rework if greater than 2 minor defects
Marked Danger Trees and Snags
Any remaining snags or danger trees that were marked
Any remaining snags or danger trees that were not marked
0 N/A Rework N/A
Hazards that interfere with the use of the road (rocks, logs, etc) (ML 3-5)
Unstable hazards that remain in the Clear Limits N/A 0 N/A Rework N/A
Log Out
Horizontal clearance -more than 20% not cleared to specified distance
Horizontal clearance - 20% or less not cleared to specified distance
0 1 per unit Rework Rework if greater than 1 minor defects
Vertical clearance -more than 20% not cleared to specified distance
Vertical clearance - 20% or less not cleared to specified distance
0 1 per unit Rework Rework if greater than 1 minor defects
Work Area Management
Not following approved safety plan which may include signs, flaggers, and other temporary traffic control measures
N/A 0 0 Suspend work until in compliance
N/A
1240BE26Q0065
881-F1 MOBILIZATION / EQUIPMENT MOVING
881.01 Service Required
A. Mobilization of personnel, equipment, and material to the project site.
B. Moving of equipment outside the established work schedule as ordered.
881.02 Performance Standards
Equipment shall be clean and weed free prior to moving it to the project area.
This cleaning shall remove all soil, plant parts, seeds, vegetative matter, or other debris that could contain or hold seeds. All subsequent move-ins of equipment to the project area shall be treated in the same manner as the initial move-in.
Equipment shall be considered free of soil, seed, and other such debris when a visual inspection does not disclose such material. This requirement does not apply to service vehicles, water trucks, pickups, cars, and/or similar vehicles.
Additional equipment washing is applicable to all equipment on site requiring washing, NOT individual pieces of equipment.
Unless otherwise agreed, the Forest Service shall be given a minimum of 24 hours notice when equipment is ready for inspection. Notification will include an agreed upon location where the equipment will be available for inspection by the Forest Service. Inspection will be required after every cleaning.
Subsequent equipment moving mileage is defined as a one way moving distance above 10 miles from the present work site to the ordered work site. Moving is complete, when the contractor has moved from the present work site to the ordered work site and returned to the previous location.
881.03 Location of Work:
As specified on roads listed on the ROAD LISTING, SHOWN ON THE PLANS, or as ordered by the Contracting Officer.
1240BE26Q0065
881.04 Measurement:
Measurement under this Section will be made by the total number of units for each item listed in the SCHEDULE OF ITEMS completed and accepted.
A. Each: Measured by the total number of units for each item in the schedule of items completed and accepted.
B. Mile: Work activity will be measured along the shortest feasible route to the nearest one (1) mile, from the starting location of the move, to the ordered work site.
881.05 Payment
The accepted quantities will be paid at the contract price per unit of measurement for the Section 881 pay items listed in the schedule of items. Mobilization is complete when all equipment, personnel, and materials are moved to the project site and work has been started. Payment will be full compensation for the work prescribed in this Section.
Pay Item Pay Unit
881 Lump Sum Mobilization
1240BE26Q0065
881.06
Description Major Minor Allowable
Defects Required Action Defect Defect Major Minor Major Minor
Weed free equipment Equipment not weed free. N/A 0 N/A Equipment rejected until it can be made weed free N/A
Ordered Movement of Equipment
Equipment not moved within designated time N/A N/A N/A N/A N/A
Equipment meets all state and federal regulations
Does not meet state and federal regulations N/A 0 N/A
Bring equipment up to state and federal regulations or replace equipment
N/A
Equipment leaks
Equipment leaks in sensitive areas or leaks that are large and not typically inherent in the specific equipment
Small leaks inherent in the specific type equipment 0 N/A
Replace equipment and restore affected site as directed by the Contracting Officer
Place absorbent pads under equipment when not operating.
1240BE26Q0065
| Wil-BLM-Statement of Work |
| SECTION 5--PERFORMANCE WORK STATEMENT TASKS AND CRITICAL SUBTASKS |
| 001-WilMapRoadsSpecs |
| Forest Vic. map |
| DE SH Road Listing |
| MRRD Road Listing |
| MF Road Listing |
| Willamette SPS's |
| 800F1_pbsc |
| 801F1_pbsc |
| USPECIAL PROJECT SPECIFICATION (12/11) |
| 807F1_pbsc |
| USPECIAL PROJECT SPECIFICATION (01/15) |
| 808F1_pbsc |
| 811F1_pbsc |
| 813F1_pbsc |
| 814F1_pbsc |
| 832F1_pbsc |
| 833F1_pbsc |
| 834F1_pbsc |
| 841F1_pbsc |
| 842F1_pbsc |
| Performance Standard |
| 851F1_pbsc |
| 861F1_pbsc |
| 872F1_pbsc |
| 881F1_pbsc |
| Performance Standards |
| Payment |
| Hay bale dwg.pdf |
| Sheets and Views |
| Haybale |
File details come from the government source that posted it. Updated .