1240BE25Q0007-0001 Questions.pdf
PDF 96 KB Posted
- Solicitation number
- 1240BE25Q0007
- Issued by
-
Department of Agriculture Forest Service
About this file
This document is an Amendment of Solicitation/Modification of Contract (Standard Form 30) addressing questions for a roadway maintenance service contract for the LaGrande District of the Wallowa Whitman National Forest. The amendment provides detailed responses to five key questions about the project, including the Period of Performance (base period from Sept. 22, 2025 to Nov. 30, 2026, with an Option Period from June 15, 2026 to Nov. 30, 2026), material availability at rock sources, and road maintenance expectations. The project involves improving approximately 11.5 miles of roads, specifically the 5125 Road and roads to the Mt. Fanny Communications site, with the goal of making them safely accessible for large propane trucks and improving to a maintenance level 3 road standard. Quotations are due by 3:00 pm Pacific on August 7, 2025, and the contract allows for flexibility in material quantities, with no expectation of blasting or crushing additional materials if initial supplies are insufficient.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
1240BE25Q0007
x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
40BE
PORTLAND OR 97204-2829
STE 310
1220 SW 3RD AVE
USDA-FS CSA NORTHWEST 3
08/01/20250001
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
08/01/2025
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
The purpose of this amendment is to answer questions.
Q1: What is the Period of Performance?
A1: Base period is Sept. 22, 2025 to Nov. 30, 2026. Option Period is June 15, 2026 to
Nov. 30, 2026.
Q2: Are there enough readily available materials at the Mt. Fanny Rock Source? What if there is not enough materials available?
A2: We are confident that there are enough materials available to complete the contract at
Mt. Fanny without needing to blast or crush. If materials end up being short of contract quantities due to a discrepancy in the assumed depth of the material pile, the contract
Continued ...
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
THOMAS W. HAMMERLE
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
2 2
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
1240BE25Q0007/0001
would need to be modified to fit the available material quantities. The contractor would not be expected to blast or crush for more material.
Q3: The Mt. Fanny Rock source is generally made up of 4¿ minus rock. What is the expectation for the larger 12¿ pieces that are present in the pile?
A3: Those larger pieces can be loaded and placed in the staked locations. If the equipment used to spread the rock does not break the large pieces down enough to incorporate into a relatively uniform road surface, the large pieces would need to be skimmed off of the road before compaction.
Q4: Are there enough readily available materials at the 5125 Road Rock Source? What if there is not enough materials available?
A4: There is an estimated 400 cubic yard supply at the rock pit located along the project area at
Lat/Long 45.073325, -118.236073. If Option Item
1001 is awarded, the additional crushed ¾ minus material can be sourced at a rock pit located approximately 6 miles from the project area at
Lat/Long 45.101488, -118.156456.
Q5: Page 7 of the QASP refers to Maintenance
Level 4 & 5 roads. Is the expectation for these roads to meet descriptions of Maintenance Level 4 and 5 roads after the project is completed?
A5: No, the expectation is for both roads to improve in drivability. The roads to Mt. Fanny need to be safely accessible for large propane trucks. The 3 mile section of the 5125 road would be improved to meet the general description of a maintenance level 3 road.
Please remember that Quotations are due 3:00 pm
Pacific, 7 August 2025.
// Nothing Follows //