This document provides an amendment to a Forest Service solicitation for road maintenance survey services. The amendment corrects the location paragraph to specify California, Oregon, Kentucky, Tennessee, North Carolina, and Wisconsin. It also updates the attachment maps and answers twelve questions relating to the scope of work. Contractors will complete the condition assessment requirements once regardless of the number of networks assessed. Subcontractor information must be provided. Existing GIS shapefiles have limited data so contractors will need to create new shapefiles meeting accuracy standards. The work will involve on-site manual evaluation of pavement types and thicknesses. No falling weight deflectometer testing or additional pavement management software beyond PAVER is required. The performance period is from September 25, 2023 to December 30, 2024.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

1240BE23Q0059

x x

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

40BE

PORTLAND OR 97204-2829

STE 310

1220 SW 3RD AVE

USDA-FS CSA NORTHWEST 3

08/15/20230001

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

08/15/2023

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

The purpose of this amendment is to correct the location on paragraph (vii) of the solicitation, to update the Attachment 3 Maps, and to answer questions.

1. Solicitation 1240BE23Q0098, Paragraph (vii) Location, is changed to read: California, Oregon, Kentucky, Tennessee, North Carolina, and Wisconsin.

2. Attachment 3 Maps is updated to ROADS LIST 1240BE23Q0059, AMD01, 09062023.

3. The following are answers to questions submitted:

Q1. For Price Schedule Items 0001 and 0002, is this a one-time expense regardless of the

Continued ...

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

THOMAS M. LUCAS

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

NAME OF OFFEROR OR CONTRACTOR

2 26

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

1240BE23Q0059/0001

number of forest networks to be assessed, or would it be done once per network (e.g., two times if selected to deliver Items 0004 and 0006)?

A1. Contractors will only complete CLINs 0001 and

0002 once, regardless of the number of field

CLINs they are awarded.

Q2. Does every firm on a team need to provide the

Vendor Information (including Representations and

Certifications), or just the Prime?

A2. Yes, subcontractor vendor information shall be provided in the quotation.

Q3. On page 4 of the solicitation document, ¿a)

Volume I, i) Past Performance ¿ Provide a list of similar projects completed by your firm over the past three years.¿, do the projects need to be completed or can we include projects that are ongoing for years with completed elements to them.

A3. In progress is fine. How the project is relevant to the PWS is important.

Q4. How should the GIS shapefiles be updated? Can they be done through Google Maps?

A4. Shapefiles and Geodatabases shall be created or updated using ESRI¿s ArcGIS 10.x and ArcPro

2.x. No, you can¿t use Google Maps.

Q5. What level of accuracy is required for mapping new shape file items, such as new parking spaces, boat ramps, and roads?

A5. Shapefiles/centerlines should appear within

10ft of true location. The areas of the shapefiles should not have less than 10% error to true area.

Q6. We see the guidance on locationing (10m accuracy), and area accuracy, but not boundary accuracy. And if the GIS Shapefiles don¿t exist, to what extent will they need to be populated?

A6. There is very limited existing shapefiles, plan on creating and populating new shapefiles with required PAVER fields for the paved assets to be condition surveyed.

Q7. If additional routes are located, will the contract be amended to add them to our scope of work?

A7. Not likely, the list of routes within this contract are not all that are within the Forest

Continued ...

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

NAME OF OFFEROR OR CONTRACTOR

3 26

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

1240BE23Q0059/0001

Service transportation network, just ones selected to be condition surveyed.

Q8. How should the thickness of the pavement be determined?

A8. Generally this can be determined at looking at the edge of the pavement where exposed or by digging a small hole in shoulder to measure.

Q9. Will Falling Weight Deflectometer (FWD) testing be required?

A9. No.

Q10. How should the pavement type be identified

(chip seal, fog seal and slurry seal)? Will manual inspection be required?

A10. You will have to manually look at the paved road surface and determine type of surface seals.

Q11. Will a manual inspection be required for automated surveys? Submit plan for how many manual surveys you will do so that automated methods achieve at least 85% accuracy. At a minimum you will need to do a manual survey for each surface type of road such as asphalt, bituminous surface treatment (double chip), or

PCC and condition (good, fair, poor) . If so, what is the recommended mileage for each 10-mile section?

A11. This will not be required. Your plan and proof of concept results will be used to determine level of manual surveys needed.

Q12. Is NPS open to using a pavement management software, other than PAVER, to better optimize your M&R plans and budget scenarios?

A12. All roads are within the Forest Service, and will require the use of PAVER software.

Attachment:

A10

1240BE23Q0059_FS_SOL_AMD01_09062023_synopsis-solic itation

ATCH-03 ROADS LIST 1240BE23Q0059-0001, 09062023

Period of Performance: 09/25/2023 to 12/30/2024