This document is Amendment 03 to RFQ No. 1240BD26Q0081 for Silver Creek Trail Bridge Supplies, issued by the USDA Forest Service Field Procurement Operations (FPO), CSA #2 on September 4, 2026. The amendment provides clarification on two key technical requirements previously addressed in Questions & Answers Round 1.

Regarding steel girder splicing, the amendment clarifies that while one-piece girders are preferred for easier installation, spliced girders are acceptable as needed to meet helicopter lift constraints and material lead times. The bridge site offers reasonable opportunity for temporary field splicing. However, preference will be given during offer evaluation if maximum piece weight is kept below 4,000 pounds to reduce helicopter transport requirements. Additionally, the amendment clarifies design load live load requirements, specifying that the H5 vehicle load shall not be placed in combination with the 90 psf pedestrian load. Offerors must acknowledge receipt of Amendment 03 by signing and submitting Page 1 of the amendment within their company's offer. All other terms and conditions of the original solicitation remain unchanged.

View the file

Other files for this federal contract opportunity

Other files attached to Silver Creek Trail Bridge Supplies, newest first.
File Type Posted
Amendment 04 (Signed By CO).pdf PDF
Amendment 02 (Signed By CO).pdf PDF
Amendment 01 (Signed By CO).pdf PDF
RFQ No 1240BD26Q0082.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

Previous edition unusable

Brian A. Johnson, CO

"SILVER CREEK TRAIL BRIDGE SUPPLIES"

1. Amendment 03 provides clarification remarks for "Questions & Answers Round 1, FS Answer #04;" see Page 2.

2. All other terms and conditions of the solicitation remain unchanged.

Continued...

USDA Forest Service Field Procurement Operations (FPO), CSA #2 Attn: Brian A. Johnson, Contracting Officer Telephone: (509) 423-2223 E-mail: brian.johnson3@usda.gov

Same as Block 6

1240BD26Q0082

1 2

09/04/2026

08/11/2026

9/4/2026

RFQ NO. 1240BD26Q0081: Silver Creek Trail Bridge Supplies Amendment 03

Date Issued: 9/4/2026

YELLOW = Additional Clarification

3. This is the original Amendment 02 answer given concerning girder splicing authorization:

4. The Forest Service Engineering Department is providing additional clarification concerning spliced girders:

“It is preferred that steel girders be one piece for easier installation; however, a splice is acceptable as needed to meet helicopter lift constraints and material lead times. The bridge site has reasonable opportunity for temporary shoring to allow girders to be spliced in the field. Because splices will be permitted, preference will be given during offer evaluation if maximum piece weight is kept below 4,000 lbs to reduce the size of helicopter required for transport.

To clarify the design load live load requirements: The H5 vehicle load shall not be placed in combination with the 90 psf pedestrian load.”

5. End of Amendment 03.

CO Note to Offerors: Do not forget to acknowledge all issued amendments by signing/submitting Page 1 (only) of each

Amendment within your company’s offer.

Thank you!

File details come from the government source that posted it. Updated .