Existing Drawings1.pdf
PDF 3 MB Posted
- Solicitation number
- 12405b24q0425
About this file
This document is a Request for Quote (RFQ) issued by the United States Department of Agriculture (USDA), Agricultural Research Service (ARS) for the replacement of electrical panel feeders and associated repairs at the North Central Soil Conservation Research Laboratory (NCSCRL) in Morris, Minnesota.
The RFQ seeks quotes from responsible offerors to provide the required services. Key details include: a site visit scheduled for August 28, 2024, a quote submission deadline of September 6, 2024, and award criteria of Lowest Price Technically Acceptable. The RFQ incorporates various Federal Acquisition Regulation (FAR) clauses and provisions, and specifies that the awarded contract will be a firm fixed-price. Offerors are required to provide a quote on company letterhead and complete the FAR 52.212-3 Offeror Representations and Certifications. The NAICS code for this procurement is 238210 - Electrical Contractors and Other Wiring Installation Contractors.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 12405B24Q0425-Bidding RFIs-Morris MNL-Replace Elec Feeders-USDA responseswm.docx | DOCX document | |
| servclauses2.pdf | ||
| servclauses1.pdf | ||
| 15-4957ep.txt | TXT text file | |
| Project Dwgs-Morris MN-Replace Pnl Feeders-Assoc Repairs (3).pdf | ||
| SOW-Morris MN-Replace Elec Pnls-Assoc Repairsep.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Replace Electrical Panel Feeders and Associated Repairs North Central Soil Conservation Research Laboratory (NCSCRL) USDA-ARS, Morris, MN
EXIST DWG-1
Existing Drawings
EXIST DWG-2
Existing Drawings
General Notes:
1. A sketch of the building layout follows and is included as reference / resource for contractors.
2. Selected existing electrical drawings from original construction of Building 1 and Building 2 (dated 1958) follow. The drawings provide information on the location of existing electrical panels furnished in the original construction. The Contactor may use the existing drawings as a reference / resource in developing their proposal. The Contractor shall confirm all existing conditions prior to proceeding with any project activities.
File details come from the government source that posted it. Updated .