Sol_12405B22Q0361_Amd_0002.pdf

PDF 405 KB Posted

Attached to
Door Replacement and Concrete Pad, Stoneville, MS Federal contract opportunity
Solicitation number
12405B22Q0361
Issued by
Department of Agriculture Agricultural Research Service Field Research Implementation and Information Delivery

View the file

Other files for this federal contract opportunity

Other files attached to Door Replacement and Concrete Pad, Stoneville, MS, newest first.
File Type Posted
12405B22Q0361 Amendment 0001.pdf PDF
Attachment 1_Statement of Work.pdf PDF
Attachment 5_ARS Facilities Design Standards ARS-242.1.pdf PDF
12405B22Q0361.pdf PDF
Attachment 2_Wage Determination MS20220046.pdf PDF
Attachment 4_ARS-372.pdf PDF
Attachment 3_ARS-371.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

12405B22Q0361 x x

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

ARS-12405B

STONEVILLE MS 38776

141 EXPERIMENT STATION ROAD

USDA ARS SEA AAO ACQ/PER PROP

09/08/20220002

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

08/08/2022

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

The purpose of this amendment is to:

1) Update Section L.6 SITE VISIT CONSTRUCTION, Section L.9 INSTRUCTIONS FOR THE PREPARATION

OF OFFERS, and Section M.1 EVALUATION METHODOLOGY. Changes highlighted in yellow.

2) Add Optional Line Item 0002

3) Update SF1442 Block 13C- An offer guarantee is required. Please refer to Section L.4 of the solicitation for additional details.

4) Post final Q&As received prior to the cutoff date

5) Update Bids due date : 02-SEP-22 changed to 16-SEP-22

Note: Offerors shall provide all requested information referenced in Section L.9, Offer

Continued ...

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

VICTOR H. MCCOY

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

NAME OF OFFEROR OR CONTRACTOR

2 7

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

12405B22Q0361/0002

Submission Documents (pg. 43) of the solicitation. Failure to provide all requested information will result in the offer being found non-responsive, thus ineligible for award.

0002 Relocating of existing one (1) light switch and 1 JC one (1) fire alarm pull station device.

Contractor shall provide all equipment, labor, and materials to remove and relocate the existing light switch and fire alarm pull station as a result of the new door and frame. Contractor shall reuse the existing light switch and fire alarm pull station device. Work must be completed in accordance with the latest national fire alarm codes. Once the relocation work is completed, the contractor must test to ensure the fire alarm system in in working order.

(Option Line Item)

45 Days After Award

Product/Service Code: Z2AA

Product/Service Description: REPAIR OR ALTERATION

OF OFFICE BUILDINGS

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

(b) The copy of any protest shall be received in the office designated above within one day of filing a protest with the GAO.

(End of provision)

L.6 SITE VISIT CONSTRUCTION

(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.

(b) Attn: Scott Feutz

USDA ARS JWDSRC

141 Experiment Station Rd Stoneville, MS 38776

SITE VISIT DATE: 22 August 2022 at 2:00 PM ET

(SITE VISIT ATTENDANCE IS MANDATORY TO PROVIDE AN OFFER ON THIS SOLICATION)

If you wish to attend the site visit please send an email to osvald.rodriguez@usda.gov with the title “12405B22Q0361 Site Visit Registration” with the attendee name(s), along with company information. Contractors must be registered to attend the site visit. If Contractors are not registered they will not be permitted on the site visit.

The site visit registration deadline is August 17, 2022 at 10:00 AM ET, any registration request received after August 17, 2022 at 10:00 AM ET will not be accepted.

(End of Provision)

L.7 ALTERNATIVE FORMS OF SECURITY (AGAR 452.228-70) (NOV1996)

If furnished as security, money orders, drafts, cashier’s checks, or certified checks shall be drawn payable to:

USDA, Agricultural Research Service.

L.8 INQUIRIES (AGAR 452.204-70) (FEB 1988)

Inquiries and all correspondence concerning this solicitation should be submitted in writing to the Contracting Officer. Offerors should contact only the contracting officer issuing the solicitation about any aspect of this requirement prior to contract award.

(End of Provision)

L.9 INSTRUCTIONS FOR THE PREPARATION OF OFFERS

PROJECT INFORMATION

PROJECT TITLE: BLDG 45 Door Replacement and Concrete Pad PROJECT LOCATION: Stoneville, MS

NORTH AMERICAN INDUSTRY CLASSIFICATION SYSTEM CODE: (NAICS): 238350

SMALL BUSINESS SIZE STANDARD: $16.5M

This procurement is a solicitation competed in accordance with FAR Part 13 Simplified Acquisition Procedures and FAR Part 36 Construction Contracts, 100% Small Business set aside. Solicitation documentation and any issued amendments will be posted to SAM.gov. This is the only official location where these documents can be obtained and where updates are posted. No ‘hard copy’ solicitation materials are available.

(SITE VISIT ATTENDANCE IS MANDATORY TO PROVIDE AN OFFER ON THIS SOLICATION)

Submission shall be emailed to osvaldo.rodriguez@usda.gov with the subject line “RFQ 12405B22Q0361, BLDG 45 Door Replacement and Concrete Pad”. It is the Contractor’s responsibility to ensure the Government is in receipt of the offer by the deadline. Contractors shall not wait till the last minute and assume the email will be received by the Government before the time of closing.

Offerors shall provide all requested information referenced in this section. Failure to provide all requested information will result in the offer being found non-responsive, thus ineligible for award.

Offers shall submit required documents via email to osvaldo.rodriguez@usda.gov.

All questions must be submitted via email to osvaldo.rodriguez@usda.gov NLT 10:00 AM ET, 24 August 2022.

OFFER SUBMISSION DOCUMENTS:

1. Transmittal Summary Letter. A summary cover letter to the submission should provide at a minimum the following (i) Identification of the Point of Contact, current phone number, and email address. (ii) Unique Entity Identifier (UEI), CAGE Code, Tax Identification Number (ii) A list of the submission package contents.

2. Fully completed and Signed SF 1442. Original fully completed and signed SF 1442 Offer page, and acknowledgement of all amendments with via entering data in block 19 of the SF1442 or completing blocks 15a, 15b, and 15c of the Amendment and attaching to the SF 1442 offer page. Complete blocks 14, 15, 17, 20a, 20b and 20c. Failure to acknowledge all amendments will result in the offer to be found Non-Responsive and not eligible for award.

3. Bid Schedule Page 4. Complete page 4, B.3 Schedule of Items, filling in the Price for each CLIN.

4. SF 24 Bid Bond. Completed/signed SF 24 Bid Bond. A bid guarantee is required in an amount not less than 20 percent of the proposed price but shall not exceed $3,000,000. Failure to furnish the required bid guarantee in the proper form and amount, by the time set for opening of offers, shall require rejection of the offer in all cases except those listed in Federal Acquisition Regulation (FAR) 28.101-4. Bid Bonds must be provided using Standard Form 24 (see FAR 28.106-1) and be from a corporate surety listed in Department of Treasury Circular 570. Individual sureties have to be acceptable to the Contracting Officer (see FAR 28.203) and be accompanied by Standard Form 28 Affidavit of Individual Surety. Other forms of offer security are acceptable as denoted in solicitation provision FAR Part 28.203-2. (Original Bid Bond copy not required, reference FAR Class Deviation to Eliminate Hard Copy Originals…. dated May 19, 2020.)

5. Technical Proposal. The offeror shall describe is proposed approach through the use of narrative, in sufficient detail for the Government to understand and evaluate the nature of the approach regarding the contractor’s as required by the Statement of Work. The Technical Proposal shall incorporate the SOW timelines and the standard thresholds to ensure they understand the requirement. The offeror must clearly and concisely demonstrate the following: understanding of the tasks involved in the project; the technical and institutional elements which must be addressed; proposed systems and major pieces of equipment; and any special issues or problems likely to be encountered. The offeror shall also describe how they will manage the project to minimize errors and omissions and ensure incorporation of Government comments, concerns, and feedback.

6. Past Performance documentation- Offerors shall provide at least (2) past performance references for federally awarded contracts awarded within the past 3 years. The references must include similar construction projects at a federal facility.

End of this section awarded c r federally at a y federal facility.

SECTION M - EVALUATION FACTORS FOR AWARD

M.1 EVALUATION METHODOLOGY

The Government shall conduct a source selection using Lowest Priced Technically Acceptable (LPTA). The Government shall award a contract to the responsible offeror who offers the lowest priced that is found to be technically acceptable, as set forth in the solicitation. In order to be considered acceptable, an offeror must conform to the material terms of the solicitation (e.g. contract clauses, specifications, etc). The Government shall not award any contract that does not propose a fair and reasonable price.

The Government intends to select a single contractor; however it reserves the right to award no contract at all, depending on availability of funds and other extenuating circumstances. Award shall be made on an all or none basis. Offerors proposing deviations or alternatives to the solicitation requirements shall be considered non-compliant and not considered for award.

Offer Compliance: Offers will be reviewed for timeliness. If the offer is received after the closing date and does not meet the criteria for “late submissions” in the solicitation, the offer will not be evaluated. The offer will be reviewed for compliance to the solicitation (i.e. submitted all documents required in Section L.9). If the offer is not compliant to the solicitation it will not be evaluated, and the offeror will be notified that they are found to be not-responsible.

1. Timely and compliant offers will be placed in order from lowest to highest price. A technical evaluation is then performed on lowest priced offeror. If the offeror is technically acceptable award is made, if the offeror is not technically acceptable then the next lowest is evaluated. This process is worked until the LPTA offeror is identified.

Offers that are priced higher than the LPTA offer will not be evaluated.

2. A “Technically Acceptable” evaluation will be conducted.

Technically Acceptable offer is defined as:

a. Meeting all requirements as defined in the solicitation, to include offer submission documents referenced in Section L.9 (Including required Bid Guarantee/Bond). Failure to submit ANY of the required document listed in Section L will render your quote non-responsive and thus not eligible for award. Failure to acknowledge any and all amendments will render your quote non-responsive and thus not eligible for award.

b. The Contractor shall provide a plan that address all the aspects identified in Submission Document #5 Technical Proposal. Offerors that fail to address any aspects or the proposed solution is not compatible with the SOW or laws will be found unacceptable. Offers that do not provide a technical proposal that is sufficient to convey to the Government complete understanding, will be found unacceptable. Offers that do not provide details and breakouts of their proposed har barn solution will be rated unacceptable.

c. Site Visit Attendance. Offerors shall attend the Government organized site visit of the construction site. Offerors that do not attend the site visit will be found non-responsive. Offerors must ensure they understand the orientation and layout of the construction site to ensure the offer is generated within reason and context of the worksite.

d. Acceptable rating in “Past Performance”.

Past Performance will be rated on an “acceptable” or “unacceptable” basis. The apparent successful, prospective contractor must have acceptable past performance. System for Award Management (SAM.gov) exclusions list, Federal Awardee Performance and Integrity Information System, and Contractor Performance Assessment Reporting System (CPARS) shall be considered as part of the past performance evaluation process. Any past performance that is found to be “negative”, shall result in the entire Past Performance rating as “Unacceptable”.

“Negative” is defined as any CPARS past performance evaluation rated less than “Satisfactory” for any rating category, any Terminations for Default/Cause, or any negative performance references will be rated as ‘Unacceptable’. Note: In the case of an offeror without a record of relevant past performance or for whom information on past performance is not available or so sparse that no meaningful past performance rating can be reasonably assigned, the offeror may not be evaluated favorably or unfavorably on past performance. Therefore, the

c. Site Visit Attendance. Offerors shall attend the Government organized site visit of the construction site. Offerors g that do not attend the site visit will be found non-responsive. Offerors must ensure they understand the orientation p y and layout of the construction site to ensure the offer is generated within reason and context of the worksite.

offeror shall be determined to have unknown past performance. In the context of acceptability/unacceptability, “unknown” shall be considered “acceptable.” The Past Performance submitted under offer submission document L.9 (6) shall be similar to the requirements of this project in terms of type of work performed and level of complexity. Offers that do not meet this threshold for past performance will be rated “Unacceptable” in Past Performance.

The Government reserves the right to use past performance information obtained from sources other than those identified by the offeror, including but not limited to past performance information located in the Contractor Performance Assessment Reporting System (CPARS). Past performance is a measure of the degree to which an offeror satisfied its customers in the past, complied with contract schedule, and adherence to the contract specifications. Past performance is also a measure of the risk of performance associated with the offeror. The Government will assess the offeror’s record of past performance on similar contracts as an indicator of success under this requirement.

An individual evaluation rating of “Unacceptable” for any of the factors shall result in an overall “Unacceptable” rating for Technical Acceptability.

Price. The Government shall evaluate this factor for all CLINS to assess the offeror’s proposed price submitted in the Schedule B. (ROUND OFFER PRICE FOR EACH CLIN TO THE NEAREST DOLLAR AMOUNT, DO NOT PROVIDE CENTS). Price will not be assigned an adjectival rating. The Government will award a contract to an offeror whose technically acceptable offer represents the lowest price to the Government. The Government shall not award a contract that does not propose a fair and reasonable price.

End of this section

Questions and Answers

Question 1: “There is an existing light switch and fire alarm pull station device on the wall where the new exterior door is to be installed. Will Stoneville Maintenance take care of locating these items?”

Answer 1:

At this time it is undetermined whether or not Stoneville Maintenance will relocate the existing light switch and fire alarm pull station device. Line Item 0002 has been added as an option for the work.

Question 2: “Are there any specifications for the replacement doors for the cooler. Scope of work states: "Insulated Exterior Grade Doors"? Gauge: ___? R Value of Insulation___? Reuse all existing hardware?”

Answer 2:

The gauge must be 16 and the R Value must be industry Standard of R5 or R6