Questions & Answers

Solicitation 12405B22Q0275

REPLACE ROOFS - B57, B38, B35, B23, & B14- USDA, ARS, Miami, Florida

1. Would you possibly have the measurements for all of these roofs and buildings?

Response: The measurements of the buildings are shown on the last pages of the SoW. This is the only information being made available.

2. The metal roof system did not describe which materials will be used; please clarify.

Response: Standard Gauge of 24, Standard Color of White, 12” Coverage per panel, Panel profile to be selected by Site Personnel to match existing as close as possible. Full 10 year labor warranty and 30 year roofing system warranty as standard.

Quoted from the SoW:

The project consists of the following elements:

Scope of Work Specifics - Sloped Roofs (B57, B38, B35, & B23)

• Remove existing roof system down to wood sheathing

• Remove all debris from site

• Replace rotten wood sheathing as necessary.

• Prep and clean roof sections

• Furnish and install 3x3 drip edge, valleys, vents and flashings

• Seal flashing penetrations

• Install new #30 ASTM Tamko base sheet and mechanically fasten

• Apply GASF Versashield fire resistant roof deck protection

• Install standing seam metal roof (standard color white)

Scope of Work Specifics -Flat Roof (B14 only)

• Seal flashing penetrations

• Install GAF fire resistant TPO underlayment

• Install GAF ¼” Polyiso insulation adhered to deck

• Install GAF single ply 60 mil TPO membrane (white)

• Seal all laps/seams with heat weld.

3. On Page 5 of the solicitation document, the services are - to replace fifteen hydronic unit heaters, install twelve horizontal airflow fans, install/modify three intake louvers, and replace three doors throughout three greenhouses and one headhouse.

Response: Page 5 description of work should read to supply and install a new roof to current code requirements on Buildings - B57, B38, B35, B23, & B14 at the USDA, ARS, Subtropical Horticulture Research Center, 13601 Old Cutler Road, Miami, Florida 33158. This correction will be posted in a Q&A document.

4. SOW Addendum added to the Solicitation #12405B22Q0275 on 08/10/22. As such, I request arborist information as we were informed that we cannot touch any fruit located on the grounds of the Subtropical Horticultural Research Station without being ejected from the property. Given the sensitivity of the research and possibility of infecting other local trees, we feel that any trimming / removal needs to be done by a recommended arborist.

Response: This area is not an issue of concern. An arborist is not needed/required. More information regarding the fruit on the property will be discussed with the contract awardee.

5. Can an additional site visit be scheduled for the referenced solicitation?

Response: The location is not hosting an additional site visit. Site visits are recommended but not required.

6. Will there be an area set up, on site for contractor to store equipment and supplies?

Response: Yes, there will be a set up area designated for this project. Please note that this will be an open area that is not covered, and items left on our property are entirely the responsibility of the vendor.