Bldg. 12 Install Building Automation Controls Mississippi State, MS Questions and Answers

1) Will the existing Johnson Controls NCE supervisory controller be removed and replaced with a new JACE system, or will the existing NCE remain in place?

Johnson NCE will be removed and a new Jace installed. Contractor will pull old points for programming from Johnson controls program.

2) The existing Johnson Controls NCE holds internal programming that may be controlling equipment. If the NCE will be removed, then the new JACE will need to be programmed with the same internal program as the NCE. Will USDA provide a sequence of operations for the required program?

Johnson NCE will be removed and a new Jace installed. Contractor will pull old points for programming from Johnson controls program.

3) How many field devices will need to be integrated into the new JACE system? This is required since a graphic page will need to be created for each piece of equipment that is integrated.

Approximately +or- 17-devices 1-boiler, 1-chiller, -2-AHU’s, and 14 vav’s.