PhaseIPresentation.pptx
PPTX presentation 10 MB Posted
- Solicitation number
- 123K2518R0010
About this file
Power Point Presentation - Phase I - Pre-Proposal Meeting.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| FBO Award Notice - BARC 307.pdf | ||
| Short_Listed_Offerors_Phase_II_FBO_Notice.pdf | ||
| SignInSheet.pdf | ||
| RFIForm.doc | DOC document | |
| RegistrationForm.docx | DOCX document | |
| AmendmentForm.doc | DOC document | |
| QuestionForm.doc | DOC document | |
| SFLLL.pdf | ||
| ARS242-01m-DesignStandards.pdf | ||
| ARS-371-ProgressandPaymentSchedule.pdf | ||
| SF1442.pdf | ||
| SF25-PerformanceBond.pdf | ||
| Ars372_(with_Certs)-RequestforPaymentTransmittal.xls | XLS spreadsheet | |
| SF24-BidBond.pdf | ||
| SF25A-PaymentBond.pdf | ||
| Solicitation.docx | DOCX document | |
| WageDetermination.txt | TXT text file |
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Beltsville Agricultural Research Center Building 307 Renovation and Rehabilitation Phase I pre-proposal meeting Beltsville, MD
LOCATION
BACKGROUND
BARC Building 307 was constructed in 1940 and has never been renovated or modernized.
Project Scope will include a complete gut and rebuild.
Building will contain Biological Safety Level 2 Laboratories, support spaces, and associated administrative space.
Proposed construction will be performed on an active research campus, in an unoccupied building.
This renovation project will be implemented by the Design-Build project delivery method.
REQUIREMENTS
Design-Build Services are expected for the following:
Architectural Elements (Roof, Windows, Finishes) Mechanical-Electrical-Plumbing Laboratory Systems Upgrade Site Utilities Upgrade Structual Systems Removal of HAZMAT Bridging Documents will consist of a 35% design submission. Design-Build contractor will use these documents as the basis of the design.
Procurement requires the use of biobased products. Refer to the USDA BioPreferred Program.
PROJECT ACQUISITION REQUIREMENTS
BASE:
01a – BASE ITEM – Design 01b – BASE ITEM – Construction
GENERAL ACQUISITION POINTS:
Performance Period – 800 Calendar Days from issuance of the Notice to Proceed.
Maginitude of construction is more than $10 million.
Full and open competition
OVERVIEW OF SOLICITATION PROCESS
Two-Phase Design-Build Solicitation Phase One Prepare technical proposal based on all evaluation factors Technical Evaluation Panel will review and determine a short list.
Phase Two Request for Proposal will be issued to the short list. Maximum of four.
Site Visit will be scheduled for short list contractors.
Technical Evaluation Panel will review and determine the awardee.
Award will be based on Best-Value Tradeoff Process
SITE PLAN
- BUILT IN THE 1930’S
- 60,000 SF
- 3 STORIES, PLUS A
BASEMENT AND ATTIC
- HISTORIC STRUCTURE
- MHT HAS APPROVED
THE PROPOSED WORK.
- EA IS NEARLY COMPLETE
- ABANDONED ABOUT 15
YEARS AGO
- HAZMAT INCLUDES LEAD
PAINT AND ASBESTOS
VERIZON ROOM
RESTORE EXTERIOR WINDOWS, CUPOLAS AND ENTRANCES
REAR OF BUILDING
3 FLOORS PLUS BASEMENT AND ATTIC
CUTOUT OF BUILDING
ATTIC TO INCLUDE DUCTWORK AND AHU’S
REAR OF BUILDING
BASEMENT TO INCLUDE STORAGE, ELECTRIC ROOM AND FIRE SUPPRESSION
TYPICAL FLOOR TO INCLUDE OFFICES, LABORATORIES AND CONFERENCE AREAS
SITE UTILITIES TO INCLUDE NEW STEAM PIPE, WATER, SEWER, GAS, ELECTRIC AND COMMUNICATIONS
SITE IMPROVEMENTS TO INCLUDE NEW PAVING, SIDEWALK CURB AND RESTORATION
QUESTIONS AND ANSWERS
SITE VISIT
image6.jpeg image7.png image1.jpeg image2.png image3.png image4.png image5.png image8.png image9.png image12.png image13.png image14.png image10.png image11.png image11.jpg image12.JPG image13.jpg image20.png image21.png image22.png image15.png image19.png image16.png image17.png image18.png image23.png image24.png image25.png