DesignIntent.pptx
PPTX presentation 3 MB Posted
- Solicitation number
- 123K2518R0006
About this file
A-E Design Intent Presentation from the Pre-Proposal Conference
View the file
Other files
| File | Type | Posted |
|---|---|---|
| FBO_Award_Notice_-_Ames_Modernization.docx | DOCX document | |
| SSDMemorandum.pdf | ||
| SignInSheet.pdf | ||
| Visio-parking_at_NLAE.pdf | ||
| DesignIntentNarrative.docx | DOCX document | |
| SF-1442.pdf | ||
| Solicitation.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
USDA NLAE Scope of Work
Description of Work
| Construction/Modernization Items | Description of Work | ||
| 1. | Base Bid | Lab Casework Replacement | Scope includes casework, lab tops, & fixtures demolition & installation of new steel casework and lab tops with fixtures configured to individual laboratory needs. Contractor can offer an option to remove and reuse the existing lab tops if it provides a cost credit. |
| 2. | Base Bid | Lab Fume Hood Replacement | Install new 6ft FHs in laboratories where indicated on dwgs (count reduced by ~8). |
FHs to be set-up VAV to be connected to new exhaust fans.
| 3. | Base Bid | Lab Doors ADA Modifications | Install electric operators on all laboratory/workroom doors for accessibility and improved cart access. |
| 4. | Base Bid | Lab Floor Recoating | Scope is to cover laboratory renovation areas where flooring would need to be patched following casework removal or reconfiguration. Floor to match existing. |
| 5. | Base Bid | Lab Ceiling Replacement | Scope is replace ceilings in the laboratory renovation areas & corridor areas. |
| 6. | Base Bid | ADA Toilet Rooms | Convert existing Janitor closets on Floors 2 & 3, and reconfigure Restrooms on 1st floor and in Basement to be compliant with ADA standards. |
| 7. | Base Bid | ADA Improvements to Stairs | Upgrade three stairways to comply with current ADA standards. |
| Construction/Modernization Items | Description of Work | |||
| 8. | Base Bid | Lobby Renovations | ||
| (Security compliance) | Required for Agency Security compliance. Reconfigure south entrance lobby with secure waiting space and reception/guard sign-in counter. | |||
| 9. | Base Bid | ADA Signage Parking Lot Stripe | Update Building parking spaces for compliance with ADA standards. | |
| 10. | Base Bid | Sprinkler Piping Replacement | Replace sprinkler piping with significant exterior corrosion (3 existing lab spaces). | |
| 11. | Base Bid | Domestic Water System Replacement | Demo & replace existing valves in the piping distribution system. |
Replace strainers and other fittings.
| 12. | Base Bid | Domestic Water Heater Replacement | Demo & replace 2 existing hot water generators & circulating pumps. | |
| 13. | Base Bid | Water Softener | Provide a new water softener to serve the water heater and the Rhizotron emergency cooling water. | |
| 14. | Base Bid | Emergency Shower/ | ||
| Eye Wash Replacement | Install new barrier-free eye/facewash & emergency shower in all labs with fume hoods. Install eye/face wash stations in dusty workrooms. |
| Construction/Modernization Items | Description of Work | ||
| 15. | Base Bid | Domestic Water Backflow Preventer | Add backflow preventer on incoming water service as required for code compliance. |
| 16. | Base Bid | AHU Drain Pan Modifications | Refinish/rebuild existing AHU bottoms/drain pans. |
| 17. | Base Bid | Exhaust Fan Replacement | New exhaust fans for the acid-rinse bath fume hoods. |
| 18. | Base Bid | JCI (BAS) DDC Conversion | Replace existing pneumatic controls with JCI BAS including ~1,000 points, hardware, software, thermostats, valve & damper actuators, & sensors. Large pneumatic actuators for the CW & steam services to the basement AHU valves will remain and new CA lines from the existing Control Air Compressor system will be replaced. |
| 19. | Base Bid | VAV Box Replacement | VAV & TAB replacement (~28 dampers & ~121 boxes) Including labs (mech chases) & offices (corridors) with re-balancing. |
| 20. | Base Bid | Attic Ventilation Rework | Extend duct bldg ventilation exhaust to exterior (remove discharge from penthouse interior). Add ventilation fans to penthouse enclosure. |
| 21. | Base Bid | Heating Water Piping Replacement | Demo & replace existing valves and fittings in the piping distribution system as noted on the drawings. |
| Construction/Modernization Items | Description of Work | |||
| 22. | Base Bid | ADA Improvements | ||
| Fire Alarm | Upgrade fire alarm annunciation devices to be compliant with ADA standards. | |||
| 23. | Base Bid | Oxygen Depletion Alarms | Add Oxygen Depletion alarms to 2 laboratories using large containers of Liquid Nitrogen. | |
| 24. | Base Bid | Eliminate Alcoves in | ||
| 3 Corner Labs | Remove 2nd laboratory door and entrance into 3 smaller corner laboratory rooms (135, 337 & 341). Rework walls to eliminate alcoves. | |||
| 25. | Base Bid | Heat Recovery Piping & Pumps Replacement | Demo & replace existing valves and fittings in the piping distribution system and the circulating pump sets as noted on the drawings. | |
| 26. | Base Bid | FH Exhaust Fan Manifolding | Manifold fume hoods with EF redundancy in VAV configuration. | |
| 27. | Base Bid | Chilled Water to Domestic Water Changeover Controls | Automate the transfer from CW to domestic water cooling for the Rhizotrons, |
walk-in coolers, and growth chambers.
28. Base Bid Update Building Interior Signage Update room signage to be compliant with ADA standards.
| Construction/Modernization Items | Description of Work | ||
| 1. | Option 1 | Lab Casework Replacement (131, 141, 225) | Replace the floor-mounted casework and work tables in 3 workroom/labs. |
| 2. | Option 2 | Replace Computer Room CRAC Cooling Unit | Resize and replace existing CRAC cooling unit for computer server room & convert adjacent rooms to bldg ventilation system. |
| 3. | Option 3 | Lab Air Compressor Replacement | Replace existing water-cooled air compressors for laboratory compressed air with |
air-cooled units.
| 4. | Option 4 | Lab Vacuum Pump Replacement | Replace existing water-cooled vacuum compressors for laboratory vacuum system with air-cooled units. |
| 5. | Option 5 | Upgrade Conviron Growth Chamber (GC) Controllers & Replace 2 GCs | Replace two existing Growth Chambers and upgrade controls on all the laboratory Conviron growth chambers in Rm B014 and replace 2 GC units. |