BPA Call Order Summary

This is a Request for Quote (RFQ) issued under a Land Management Integrated Resources Blanket Purchase Agreement (BPA) for botany survey work on the Plumas National Forest. The call is designated as BPA No. 12363N2_A4 with Call No. 12363N26Q4192, issued on 07/06/2026 with a due date of 07/27/2026 at 1400 PT. This is a single-award call order restricted to small businesses and will only be distributed to current BPA award holders. The contracting officer is Breanne Parker, with COR Radek Glebocki serving at the Plumas National Forest, Feather River Ranger District located in Oroville, California.

The scope of work involves conducting botanical surveys for the Healthy Forests Restoration Act Wild Urban Interface (HFRA WUI) Projects during the 2027 field season. Mandatory work items include: (1) survey plan approval (1 task); (2) botany surveys on 10,000 acres with quantity subject to funding availability; (3) up to 100 occurrence forms; (4) delineation of up to 100 occurrences measured in miles; and (5) a final report with occurrence records and GIS-approved deliverables. Optional work items include additional occurrence forms and delineations on a per-unit basis. All work uses NAICS code 115310. The period of performance extends from the date of award through 12/30/2027. Contractors must commence work within 7 calendar days of receiving the notice to proceed and submit legible inspection forms within 24 hours of completing each unit. Evaluation will occur in two steps: technical evaluation (based on technical approach, knowledge of Forest Service protocols, Northern Sierra Nevada experience, and relevant past performance from the past 3-5 years) followed by cost evaluation. Contractors scoring "Marginal" or "Unacceptable" technically will not advance to price evaluation. A post-award conference is required within 10 days of award, to be held online via teleconferencing.

View the file

Other files

File Type Posted
WD_2015-5605 Rev. 28 5.13.2026.pdf PDF
HFRA_WUI_BotanySurvey_SOW_final.pdf PDF
WD_2015-5677 Rev. 30 5.13.2026.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Land Management Integrated Resources BPA Call

Revised 04/27/2026 Page 1 of 10

Issue Date: 07/06/2026

Due Date/Time: 07/27/2026, 1400 (PT)

Contractor:

BPA No.

12363N2__A4_____ Project Name

Plumas National Forest Healthy Forests

Restoration Act WUI Botany Surveys

BPA RFQ or

Call No.

12363N26Q4192 Location

Plumas National Forest – Feather River

Ranger District

Set-Aside Small Business_x__ Unrestricted_____

This will only be sent out to the current BPA Award Holders as of Issue Date.

Contractor: Confirm business size by NAICS code below: Small___ Large___ Initial:______

NAICS Code Exception if Applicable:

Award

Information

___x___This is a single award call order. Contractor must provide pricing for all items listed under Box 20.

______This is a multi-award call order. Contractor needs to only provide pricing for all items listed under the specific award(s) they are interested in.

Contractor:

UEI:

Email:

Issuing and Billing Office:

19.

ITEM

NO.

20.

SCHEDULE OF SUPPLIES/SERVICES

NAICS

Code (per Scope of Work)

21.

ESTIMATED

QUANTITY

22.

UNIT OF

MEASURE

23.

UNIT PRICE

24.

AMOUNT

Mandatory Work Items

PRE-FIELD ACTIVITIES

1 Survey Plan approved 115310 1 Task $ $

FIELD WORK

Botany Surveys – 2027 Field Season *awarded quantity may be reduced and is subject to availability of funding

115310

10,000* Acre $ $

3 Occurrence Forms- Up to 100 115310

100 Form $ $

4 Delineation of Occurrences- Up to 100 115310

100 Mile $ $

DELIVERABLES

Final Report including Final Occurrence Records, and GIS Approved

115310

1 Task $ $

Optional Work Items (in excess of Mandatory

Work)

6 Occurrence Forms 115310 1 Form $ $

7 Delineation of Occurrences 115310 1 Mile $ $

Remarks: All clauses and provisions in the base BPA award are applicable to call orders, however clauses and/or provisions in BPA Call Orders take precedence. See Attachments for additional terms and conditions. The Period of Performance for this Call Order is from the Date of Award through 12/30/2027. Specific item due dates or deliverable due dates are mandatory, not arbitrary, and must be met accordingly, regardless of the final period of performance date.

Total Price-Mandatory:

Contractor: (Name, Signature, and Date)

Date:

Requested By: (Name and Signature)

Revised 04/27/2026 Page 2 of 10

COR: Radek Glebocki

Ordered By: (Name and Signature)

Breanne Parker

Contracting Officer

Revised 04/27/2026 Page 3 of 10

1. DESCRIPTION/STATEMENT OF WORK

Plumas National Forest’s Healthy Forests Restoration Act Wild Urban Interface (HFRA WUI) Projects are proposing to reduce wildfire risk to communities, watersheds, and other at-risk lands by authorizing hazardous fuels reduction projects on National Forest System lands. It also supports watershed protection, and addresses insect and disease infestations.

The resource survey work scoped under these contracts will provide data sufficient for informing management decisions and facilitate the implementation of the HFRA WUI Projects. The results of surveys will be used to identify appropriate measures to mitigate disturbance to botanical resources within the boundaries of the projects.

See attached Statements of Work for additional information.

2. SPECIFICATIONS:

See atteched Statement of Work

2.1 Key Personnel and Required Qualifications or Certifications

See atteched Statement of Work

3. PROJECT LOCATION AND DESCRIPTION

Botany surveys included in this Statement of Work are focused on the Healthy Forests Restoration Act –

Wild Urban Interface Projects (HFRA WUI) planning area on the Feather River Ranger District of the

Plumas National Forest. The attached SOW Vicinity and Project Area Maps show the scoped planning areas in relation to surrounding towns and landmarks. All contract areas are located on National Forest lands within the delineated boundaries of the Plumas National Forest. Surveys or follow-up site visits shall not be conducted on private land.

4. INSPECTION AND ACCEPTANCE:

4.1 FAR 52.246-4: INSPECTION OF SERVICES--FIXED-PRICE (AUG 1996)

a. Definition. “Services”, as used in this clause, includes services performed, workmanship, and material furnished or utilized in the performance of services.

b. The Contractor shall provide and maintain an inspection system acceptable to the Government covering the services under this contract. Complete records of all inspection work performed by the Contractor shall be maintained and made available to the Government during contract performance and for as long afterwards as the contract requires.

c. The Government has the right to inspect and test all services called for by the contract, to the extent practicable at all times and places during the term of the contract. The Government shall perform inspections and tests in a manner that will not unduly delay the work.

d. If the Government performs inspections or tests on the premises of the Contractor or a subcontractor, the

Contractor shall furnish, and shall require subcontractors to furnish, at no increase in contract price, all reasonable facilities and assistance for the safe and convenient performance of these duties.

e. If any of the services do not conform with contract requirements, the Government may require the

Contractor to perform the services again in conformity with contract requirements, at no increase in contract amount. When the defects in services cannot be corrected by reperformance, the Government may—

1) Require the Contractor to take necessary action to ensure that future performance conforms to contract requirements; and

Revised 04/27/2026 Page 4 of 10

2) Reduce the contract price to reflect the reduced value of the services performed.

f. If the Contractor fails to promptly perform the services again or to take the necessary action to ensure future performance in conformity with contract requirements, the Government may—

1) By contract or otherwise, perform the services and charge to the Contractor any cost incurred by the

Government that is directly related to the performance of such service; or

2) Terminate the contract for default.

4.2 CONTRACTOR INSPECTION PROCEDURES

(A) General Instructions

1) The Contractor shall conduct inspections of i.e., treatment units and record the results using procedures described herein. Inspections shall be maintained concurrent with contract work. Completed inspection forms shall be made available to the Government within 24 hours of completion of each i.e., treatment unit and will remain part of the permanent contract file.

2) By submission of inspection forms to the Government, the Contractor is considered to be certifying that the unit is satisfactorily completed and that the inspection forms reflect the work accomplished.

3) The Contractor shall submit legible inspection forms. Illegible and incomplete forms shall be returned to the Contractor for correction and re-submission.

4) In the event the Contractor falsifies inspection results, as determined by the Contracting Officer, the

Government may declare the Contractor to be in default of the contract. Additionally, the Government may refer such falsifications to the US Attorney’s Office for possible prosecution pursuant to 18 U.S.C. 1001

(Falsification of Government Documents) or 18 U.S.C. 287 (Fraud).

4.3 GOVERNMENT INSPECTION PROCEDURES – COMPLIANCE INSPECTION:

(A) The COR, or a designated inspector, will conduct compliance inspections while work is in progress, usually daily at first, to assure that work is proceeding satisfactorily. Compliance inspections will be accomplished by desktop and visual inspection of each treatment unit and will be based on adherence to the required specifications set forth in the SOW.

(B) The Contractor shall notify the COR when units are completed prior to his moving out of the general area.

Compliance inspections will be conducted within fourteen (14) business days of completion of treatment units and the Contractor notified of any part of the unit(s) requiring additional work or rework.

Work will be accepted on the basis of visual inspection for compliance with specifications on areas reported as completed by the Contractor.

5. COMMENCEMENT PROSECUTION, AND COMPLETION OF WORK

The Contractor shall be required to (a) commence work under this contract within 7 calendar days after the date the

Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than dates specified in the SOW.

6. POST AWARD CONFERENCE

A post award conference with the successful offeror is required. It will be scheduled within 10 days after the date of contract award. The conference will be held at online via teleconferenceing.

7. EVALUATION CRITERIA:

Contractor must send a technical capability statement briefly explaining:

Revised 04/27/2026 Page 5 of 10

How they intend to complete this contract as far as time frame, personnel, and deliverables as well as explaining experience in botany survey work. Include relevant past performance information.

Quotes will be evaluated in two steps:

STEP 1) Technical Criteria. The technical proposals will be evaluated and ranked according to the following criteria. Technical ratings will be as follows: Outstanding, Satisfactory, Marginal, Unacceptable. Ratings of ‘Marginal’ or ‘Unacceptable’ will not be evaluated further. Technical Criteria includes Technical Approach and Availability and Relevant Past Performance.

1. Technical Approach and Availability

a. Technical approach is a measure of the degree to which the Offeror presents their understanding of the requirements and the challenges of this project as well as their ability to mitigate those challenges and complete the project as specified. The technical proposal shall address the following information:

i. Quality of past performance

ii. Knowledge and experience working with Forest Service protocols in regards to botanical surveys, data collection, and reporting.

iii. Knowledge and experience working in the Northern Sierra Nevada range and flora.

iv. Suitability of time frame for work and deliverables.

2. Relevant Past Performance

Provide a list of all botany survey contracts completed or begun during the past 3-5 years. Include the following information for each contract:

a. Name of contract

b. Contract number

c. Total contract value

d. Completion date, or stage of completion if still in progress

e. Project owner's name, email address, and telephone number

f. Specific type of work, project location, size, etc.

g. Whether the project was completed within the contract timeframe

h. What the contract quality was, and if there was any work that received less than full pay or any penalties and the extent of rework conducted.

The Government will consider the relevance of past performance information obtained in relation to the scope of this procurement with respect to both similar efforts, and the length, scope, number, complexity, and diversity of contracts completed by the firm. Past performance, either positive or negative, which is considered by the Government to be more closely related to the scope of this effort will be given additional weight in the evaluation process.

Government evaluators may avail themselves of various federal, state, and local past performance databases. The Government may research offeror performance on any federal, state, local, and commercial contract performance of the offeror that is known to the Government, but not included on the submitted performance information. Additionally, the personal experience and evaluator knowledge of offeror performance may be utilized.

Revised 04/27/2026 Page 6 of 10

STEP 2) Cost/Price Evaluation Criterion

1. The degree of importance of the price will increase with the degree of equality of the proposals in relation to the other factors on which selection is to be based, or when the price is so significantly high as to diminish the value of the technical superiority to the Government.

2. The Government may award a contract on the basis of initial offers received, without discussions.

Therefore, each initial offer should contain the offeror’s best terms from a cost or price and technical standpoint. However, if considered necessary by the Contracting Officer, discussions will be conducted with only those offerors determined to have a reasonable chance for award.

3. The Government reserves the right to make an award to other than the lowest-priced offeror or to the offeror with the highest non-price evaluation if the Contracting Officer determines that to do so would result in the greatest value to the Government.

8. CONTRACTING OFFICER’S REPRESENTATIVE:

Name: Radek Glebocki

Address: Plumas National Forest, Feather River Ranger District

875 Mitchell Ave

Oroville, CA 95965

Telephone: 530-260-6723

9. LIST OF ATTACHMENTS

The following attachments are made a part of this solicitation and any resultant contract.

Title Pages

Botany Survey Statement of Work

Including:

1) Project Vicinity and Survey Area Maps

2) Plumas National Forest Rare Plant List

3) Plumas National Forest Invasive Species List

Wage Determinations

WD_2015-5605 Rev. 28 5.13.2026

WD_2015-5677 Rev. 30 5.13.2026

FAR Class Deviations and Updates (at end of this document) 2

Notice for Filing Agency Protests (at end of this document) 2

FAR Overhaul | FAR Companion Guide 1

Revised 04/27/2026 Page 7 of 10

March 2025 Class Deviation

This Call Order incorporates two FAR class deviations to ensure compliance with Executive Orders

14148, 14173, 14168, and 14208, issued since January 20, 2025. It also removes references to AGAR clauses and provisions that have been rescinded. These updates reflect recent policy changes and remove outdated requirements, as detailed below.

The following FAR provisions and clauses are hereby removed in their entirety from the LMIR BPA:

• 52.222-21 Prohibition of Segregated Facilities

• 52.222-26 Equal Opportunity

• 52.222-55 Minimum Wages for Contractor Workers Under Executive Order 14026/1

1/This provision was removed to comply with the Executive Order 14236 titled "Additional Rescissions of Harmful Executive Orders and Actions," dated March 14, 2025.

The following FAR clauses now include deviations to align with recent Executive Orders:

• 52.212-3 Offeror Representations and Certifications—Commercial Products and Commercial Services

(MAY 2024) (DEVIATION FEB 2025)

• 52.212-5 Contract Terms and Conditions Required To Implement Statutes or Executive Orders—

Commercial Products and Commercial Services (JAN 2025) (DEVIATION FEB 2025)

• 52.223-1 Biobased Product Certification (MAY 2024) (DEVIATION FEB 2025)

• 52.223-2 Reporting of Biobased Products Under Service and Construction Contracts (MAY 2024)

(DEVIATION FEB 2025)

Ther following references to AGAR Clauses and provisions are hereby removed to comply with AGAR

Rule 2024-22463 (89 FR 81014):

• AGAR 452.211-74 Period of Performance (FEB 1988)/2

• AGAR 452.215-73 Post Award Conference (NOV 1996) /2

• AGAR 452.219-70 Size Standard and NAICS Code Information (SEP 2001) /2

• AGAR 452.236-72 Use of Premises (NOV 1996) /2

• AGAR 452.236-77 Emergency Response (NOV 1996)

• AGAR 452.236-78 Fire Suppression and Liability (MAY 2014)

• AGAR 452.237-74 Key Personnel (FEB 1988) /2

2/AGAR clauses and provisions that were included in full text have been retained, with only the AGAR reference removed.

The following AGAR clauses is hereby included:

• AGAR 452.236-70 Emergency Response, Fire Suppression and Liability (NOV 2024)

The following FAR and AGAR clauses have been added, effective April 2026:

• FAR 52.222-90, Addressing DEI Discrimination by Federal Contractors (APR 2026).

• AGAR Clause 452.203-72 Unenforceable Supplier Terms (APR 2026)

All call orders will incorporate these changes by reference at award.

Disclaimer: System updates may lag policy updates. The System for Award Management (SAM) may

Revised 04/27/2026 Page 8 of 10 continue to require entities to complete representations based on provisions that are not included in agency solicitations. Examples include 52.222-25, Affirmative Action Compliance, and paragraph (d) of

52.212-3, Offeror Representations and Certifications—Commercial Products and Commercial Services.

Contracting officers will not consider these representations when making award decisions or enforce requirements. Entities are not required to, nor are they able to, update their entity registration to remove these representations in SAM.

In advancement of Section 2 of Executive Order 14208, the removal of requirements related to Executive

Order 14057 eliminates all non-statutory sustainability requirements or preferences in purchases of food service wares, including paper straws. In addition to removing requirements related to Executive Order

14057, the attachment also reflects recent updates to Code of Federal Regulation citations for the U.S.

Department of Agriculture’s BioPreferred® Program, a statutory purchasing preference program.

These class deviations will remain in effect until rescinded or incorporated into the FAR.

Revised 04/27/2026 Page 9 of 10

As prescribed in AGAR 433.104-4 (a)(5)(ii), the following Notice for Filing Agency Protests shall be included in every solicitation.

NOTICE FOR FILING AGENCY PROTESTS

United States Department of Agriculture (USDA) Ombudsman Program

The USDA is committed to issuing solicitations and awarding contracts in a fair and prompt manner. The

Ombudsman Program for Agency Protests (OPAP) was established to address protest issues within the agency, providing an alternative to costly and time-consuming litigation. Operating independently, OPAP offers relief comparable to that granted by the Government Accountability Office (GAO). Interested parties are encouraged to resolve concerns through USDA’s internal Alternative Dispute Resolution

(ADR) process before pursuing external forums such as the GAO. Concerns may be addressed informally or through a formal agency protest filed with either the Contracting Officer or the Ombudsman.

Informal Forum with the Ombudsman

1. Initial Point of Contact: Interested parties who believe a specific USDA procurement is unfair or otherwise defective should first direct their concerns to the applicable Contracting Officer.

2. Escalation: If the Contracting Officer is unable to address their concerns, interested parties are encouraged to contact the USDA Ombudsman for Agency Protests. Under this informal process, the agency is not required to suspend contract award performance. Utilization of the informal forum does not suspend any time requirement for filing a formal protest with the agency or other forums.

3. Required Information: To ensure a timely response, interested parties should provide the following information to the Ombudsman: solicitation/contract number, contracting office, Contracting Officer, and solicitation closing date (if applicable).

Formal Agency Protest with the Ombudsman

1. Effort to Resolve: Prior to submitting a formal agency protest, protesters must first use their best efforts to resolve their concerns with the Contracting Officer through open and frank discussions.

2. Independent Review: If the protester’s concerns remain unresolved, an Independent Review is available by the Ombudsman. The protester may file a formal agency protest with either the

Contracting Officer or, alternatively, with the Ombudsman under the OPAP program. Contract awards or performance will be suspended during the protest period unless justified in writing for urgent and compelling reasons or determined in writing to be in the best interest of the

Government.

3. Resolution Timeline: The agency’s goal is to resolve protests within 35 calendar days from the date of filing.

4. Required Information: Protests shall include the information set forth in FAR

33.104(a)(3). Failure to submit the required information may result in a delay or dismissal of the protest.

5. Timeliness: Protests must be filed within the timeframes specified in FAR 33.104.

6. Submission: Formal protests under the OPAP program should be submitted electronically to SPE.inquiry@usda.gov and the Contracting Officer.

Election of Forum. By initiating a protest with the USDA, the protester agrees not to pursue the same matter with the Government Accountability Office (GAO) or any other external forum while the agency protest is pending. If a protest is filed externally, the agency protest will be dismissed.

Page last modified on October 15, 2025 mailto:SPE.inquiry@usda.gov

Revised 04/27/2026 Page 10 of 10

FAR Overhaul | FAR Companion Guide

Oct 30, 2025

The Federal Acquisition Regulatory Council has released an update to the FAR Companion as part of the ongoing Revolutionary FAR Overhaul (RFO) Initiative, in accordance with Executive Order

14275 and OMB Memorandum M-25-26.

The following RFO update was posted on October 30, 2025:

• FAR Companion, Version 2.0, includes the initial release of FAR Companion (FC) parts 2, 3, 7, 13, 14, 15, 16, 17, 19, 20, 21, 22, 23, 24, 25, 27, 30, 32, 37, 41, 42, 44, 45, 47, 48, 52, and 53.

• Version 2.0 also includes updates to previously released content: update to FC 8.104 pertaining to

“required use” contracts and providing more information and resources on Category Management, including beta version content of the Category Management Buying Guide; update to FC 8.401 pertaining to evaluation factors; updates to FC 8.401(b) and FC 12.301 removing references to debriefings; new annotation under FC 8.401(b) related to sole source justification content for FSS orders; new annotation under FC 12.001 related to contracting methods for commercial construction; update to FC 11.204 to clarify brand name or equal as distinct from brand name justifications under FAR 6.104; updates to thresholds referenced due to the October 1, 2025 inflation adjustment rule; various citation corrections throughout; and changed “Reserved” to “No additional guidance” when the FAR Companion does not provide any practice recommendations for that associated FAR part.

• FAR Companion, Version 2 is posted on www.acquisition.gov/far-overhaul.

To view the FAR Companion, Version 2.0. inclusive of all parts and updates, visit: https://www.acquisition.gov/sites/default/files/page_file_uploads/far-companion.pdf

To view all available rewritten FAR Parts and agency deviations, visit: https://www.acquisition.gov/far-overhaul/far-part-deviation-guide.

Stay informed. View the latest FAR Overhaul news and announcements at: https://www.acquisition.gov/far-overhaul.

https://links-2.govdelivery.com/CL0/https:%2F%2Flinks-2.govdelivery.com%2FCL0%2Fhttps:%252F%252Fwww.whitehouse.gov%252Fpresidential-actions%252F2025%252F04%252Frestoring-common-sense-to-federal-procurement%252F%2F1%2F0101019a2c554a32-f0246afd-e2b4-418c-817b-e6a76b6d073a-000000%2FUX8vjw5CHuC8f77RXf4Fu_Fb-_GNv8DPn3ftoPjCF5w=428/1/0101019a2c60554d-c2540c50-6d63-472c-95dc-38b51df370df-000000/iQRSADqlGWrqB7R_fB5Wg3JNajtZsj28p5OVudC_BNc=428 https://links-2.govdelivery.com/CL0/https:%2F%2Flinks-2.govdelivery.com%2FCL0%2Fhttps:%252F%252Fwww.whitehouse.gov%252Fpresidential-actions%252F2025%252F04%252Frestoring-common-sense-to-federal-procurement%252F%2F1%2F0101019a2c554a32-f0246afd-e2b4-418c-817b-e6a76b6d073a-000000%2FUX8vjw5CHuC8f77RXf4Fu_Fb-_GNv8DPn3ftoPjCF5w=428/1/0101019a2c60554d-c2540c50-6d63-472c-95dc-38b51df370df-000000/iQRSADqlGWrqB7R_fB5Wg3JNajtZsj28p5OVudC_BNc=428 https://links-2.govdelivery.com/CL0/https:%2F%2Flinks-2.govdelivery.com%2FCL0%2Fhttps:%252F%252Fwww.acquisition.gov%252Fsites%252Fdefault%252Ffiles%252Fpage_file_uploads%252FM-25-26-Overhauling-the-Federal-Acquisition-Regulation-002.pdf%2F1%2F0101019a2c554a32-f0246afd-e2b4-418c-817b-e6a76b6d073a-000000%2FV2fElIf9f7QdG6m5Ww5jhArdcb1aIH_aeS4ElUjVmc4=428/1/0101019a2c60554d-c2540c50-6d63-472c-95dc-38b51df370df-000000/xV7YtpptB-6N9VpzH2pxYTGN8LdN8SNn64No6C5amvE=428 http://www.acquisition.gov/far-overhaul https://www.acquisition.gov/sites/default/files/page_file_uploads/far-companion.pdf https://links-2.govdelivery.com/CL0/https:%2F%2Flinks-2.govdelivery.com%2FCL0%2Fhttps:%252F%252Fwww.acquisition.gov%252Ffar-overhaul%252Ffar-part-deviation-guide%2F1%2F0101019a2c554a32-f0246afd-e2b4-418c-817b-e6a76b6d073a-000000%2F5uwlAI9fF6_-jn5dDrAJ48p0ONjbyVaveJ8mw6NFErg=428/1/0101019a2c60554d-c2540c50-6d63-472c-95dc-38b51df370df-000000/hKblUJZVwmanVmACgNxzdtGcTCp_8oeUkYIXHQ6RvZg=428 https://links-2.govdelivery.com/CL0/https:%2F%2Flinks-2.govdelivery.com%2FCL0%2Fhttps:%252F%252Fwww.acquisition.gov%252Ffar-overhaul%252Ffar-part-deviation-guide%2F1%2F0101019a2c554a32-f0246afd-e2b4-418c-817b-e6a76b6d073a-000000%2F5uwlAI9fF6_-jn5dDrAJ48p0ONjbyVaveJ8mw6NFErg=428/1/0101019a2c60554d-c2540c50-6d63-472c-95dc-38b51df370df-000000/hKblUJZVwmanVmACgNxzdtGcTCp_8oeUkYIXHQ6RvZg=428 https://links-2.govdelivery.com/CL0/https:%2F%2Flinks-2.govdelivery.com%2FCL0%2Fhttps:%252F%252Fwww.acquisition.gov%252Ffar-overhaul%2F1%2F0101019a2c554a32-f0246afd-e2b4-418c-817b-e6a76b6d073a-000000%2FukMJUCl7XyhWDI2ryQDSaDkjAdvpP13mSWTjRrsTJgw=428/1/0101019a2c60554d-c2540c50-6d63-472c-95dc-38b51df370df-000000/swhJC4pXT7o0UtFbXNL-dK3Q6ehR3wIq3ZsJ5q7R3-s=428

File details come from the government source that posted it. Updated .