12363N26Q4116 RFQ-.pdf

PDF 8 MB Posted

Attached to
Angeles National Forest Bear Divide Paving
Solicitation number
12363N26Q4116
Issued by

About this file

This is a Combined Synopsis/Solicitation (RFQ) issued by the USDA Forest Service for highway and bridge construction work on the Angeles National Forest.

The solicitation (12363N26Q4116) seeks contractors to perform paving work on Forest Service Road 3N17.7 Santa Clara Divide and at the Bear Divide Fire Station in Los Angeles County, California. The scope includes pulverizing existing road sections and replacing with 2 inches of Caltrans Hot Mix Asphalt (4 inches at the helipad area), installing drainage features and asphalt curbs, replacing guardrail sections, and replacing/relocating a gate motor and security system at the fire station. The work is categorized under NAICS 237310 (Highway, Street, and Bridge Construction) with a $45 million small business size standard. The solicitation is reserved for small businesses. Quotes are due by May 7, 2026, at 11:00 AM CST, with questions due by April 23, 2026. The original response date was May 7, 2026, with no current extension noted. The contract will be awarded on a firm fixed-price basis to the responsible offeror whose proposal represents the best value to the government, evaluated on technical capability, past performance, and cost. The projected start date is June 1, 2026, with 120 calendar days allowed for completion. Key deliverables include a project schedule, traffic control plan, materials shop drawings, and quality control plan, with the contractor responsible for all permits, labor compliance (including prevailing wage requirements per Davis-Bacon Act), and environmental controls. The contracting officer is Thomas Tran (thomas.tran2@usda.gov).

View the file

Other files

File Type Posted
12363N26Q4116 RFQ Amendment.pdf PDF
FIRE PLAN - 3N17.7 ROADS.pdf PDF
FSSS BD.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1. GENERAL INFORMATION

Document Type: Combined Synopsis/Solicitation Solicitation Number: 12363N26Q4116 Posted Date: 04/10/2026 Original Response Date: 05/07/2026 Current Response Date: N/A Product or Service Code: F099 Set Aside: Small Business NAICS Code: 237310 Highway, Street, and Bridge Construction – $45 Million

Contracting Office Address

USDA Forest Service Procurement and Property Services National Stewardship Contracting Branch 1400 Independence Ave. SW, MS-1138 Washington DC 20250-1138

This is a combined synopsis/solicitation for commercial services prepared in accordance with FAR 12. This announcement constitutes the only solicitation; offers are being requested, and a separate written solicitation will not be issued.

Solicitation number 12363N26Q4116 is issued as a Request for Quotes (RFQ) for the Angeles National Forest Bear Divide Paving.

This solicitation incorporates provisions and clauses by reference. The full text of provisions and clauses may be accessed electronically at www.acquisition.gov.

The associated North American Industrial Classification System (NAICS) code for this procurement is 237310 – Highway, Street, and Bridge Construction, with a small business size standard of $45 Million. The product service code is Z1LB. The government intends to award a Firm Fixed Price contract resulting from this combined synopsis/solicitation to the responsible offeror whose offer, conforming to the synopsis/solicitation, will be most advantageous to the government (as determined by the solicitation evaluation criteria). All responsible sources may submit a quotation which will be considered by the agency, and proposals shall be valid for 60 days after the date of receipt for the solicitation.

Points of Contact

Thomas Tran, Contracting Officer, thomas.tran2@usda.gov No organized site visit is scheduled for this project. Interested vendors are encouraged to visit the project area to familiarize themselves with the requirements.

Offerors shall quote in accordance with the SOW. Please provide your price and technical proposal separately.

Proposals that do not have a technical proposal and past performance, may not be considered.

Quotes shall be valid for a minimum of 60 calendar days after submission.

Please label file name by format below:

Company name, price or technical proposal or both and name of project Ex. USDA Price/Technical Proposal Solicitation #

12363N26Q4116 Angeles National Forest Bear Divide Paving Page 1 of 85 https://www.acquisition.gov/far-overhaul/far-part-deviation-guide/far-overhaul-part-12 http://www.acquisition.gov/ mailto:thomas.tran2@usda.gov

Payment will be made via EFT. Invoice using IPP.Gov Set Aside For: Large Small

Woman- Owned SDVOSB Hubzone 8(a)

(Please check all that apply) x

**MUST HAVE ALL INFO BELOW**

Company Name:

Vendor Rep:

Phone:

Email:

Mailing Address:

UEI SAM #

Contractor Signature: ______________________________________

**QUOTES ARE DUE BY: 05/07/2026 by 11:00AM CST**

Questions are due by COB 04/23/2026

12363N26Q4116 Angeles National Forest Bear Divide Paving Page 2 of 85

SOLICITATION, OFFER,

AND AWARD

2. TYPE OF SOLICITATION

6. PROJECT NO. 4. CONTRACT NO.

PAGE OF PAGES

7. ISSUED BY CODE 8. ADDRESS OFFER TO

SOLICITATION

(Construction, Alteration, or Repair)

3. DATE ISSUED

IMPORTANT -- The "offer" section on the reverse must be fully completed by offeror.

9.

INFORMATION

a. NAME

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder."

CALL:

FOR

SEALED BID (IFB)

NEGOTIATED (RFP)

5. REQUISITION/PURCHASE REQUEST NO.

1166400

USDA-FS STEWARDSHIP CONTRACTING BR

1400 INDEPENDENCE AVE SW

MS-1138

WASHINGTON DC 20250-1138

363N

THOMAS TRAN

b. EMAIL thomas.tran2@usda.gov

4/9/2026

1. SOLICITATION NO.

12363N26Q4116

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date)

11. The Contractor shall begin performance upon receipt of notice to proceed and shall be completed no later than September 30, 2026.

12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

negotiable. (See FAR Clause 52.211-10)

13. ADDITIONAL SOLICITATION REQUIREMENTS

a. Offers to perform the work specified in Item 10 shall be submitted by 11:00 am CDT, May 7, 2026. If this is a sealed bid solicitation, offers must be publicly opened at that time. Sealed envelopes containing bid bonds shall be marked to show the offeror’s name and address, the solicitation number, and the date and time offers are due.

is not required.is, b. An offer guarantee

c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

d. Offers providing less than

12b. CALENDAR DAYSYES NO

(If "YES", indicate within how many calendar days after award in Item 12b.) 10

NSN 7540-01-155-3212

mandatory

30 calendar days for Government acceptance after the date offers are due will not be considered and will be rejected .

STANDARD FORM 1442 (Rev. 4-85)

Prescribed by GSA

FAR(48 CFR) 53.236-1(d)

USDA-FS STEWARDSHIP CONTRACTING BR

1400 INDEPENDENCE AVE SW

MS-1138

WASHINGTON DC 20250-1138

SOLICITATION FOR PRICING AND TECHNICAL PROPOSALS

1166400 R5 CA Angeles NF Bear Divide Paving

See Schedule of Items, specific work description, supplemental specifications/terms and conditions, and attachments that apply to the work. These terms supplement the base IDIQ terms and conditions.

**ALL DOCUMENTS, INCLUDING A SCANNED COPY OF THE FULLY EXECUTED BID BOND IF REQUIRED, SHALL BE SUBMITTED ELECTRONICALLY TO THOMAS TRAN AT thomas.tran2@usda.gov AND

RECEIVED BY THE DEADLINE IN BLOCK 13.

xThis performance period is x x (If total price exceeds $150,000 - see page 5) x

12363N26Q4116 Angeles National Forest Bear Divide Paving Page 3 of 85

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within ____________________ calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in item 13d. Failure to insert any number means the offeror accepts the minimum in item 13d.)

15. TELEPHONE NO. (Include area code)

16. REMITTANCE ADDRESS (Include only if different than item 14.)

CODE FACILITY CODE

AMOUNTS

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGEMENT OF AMENDMENTS

OFFER (Must be fully completed by offeror)

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE.

20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print) 20b. SIGNATURE 20c. OFFER DATE

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN

(4 copies unless otherwise specified)

ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

26. ADMINISTERED BY CODE 27. PAYMENT WILL BE MADE BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this document and return (Contractor is not required to sign this document.)

Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award.

No further contractual document is necessary.

30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print) 31a. NAME OF CONTRACTING OFFICER (Type or print)

30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. DATE

BY

14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code)

See schedule

USDA-FS STEWARDSHIP CONTRACTING BR

1400 INDEPENDENCE AVE SW

MS-1138

WASHINGTON DC 20250-1138

363N

INVOICE PROCESSING PLATFORM IPP

ALL INVOICES MUST BE SUBMITTED

ELECTRONICALLY THROUGH THE

INVOICE PROCESSING PLATFORM IPP

VIA WWW IPP GOV

THOMAS T. TRAN

28. NEGOTIATED AGREEMENT 29. AWARD

Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.

copies to issuing office.)

10 U.S.C. 2304(c) 41 U.S.C. 3304(a)x x

STANDARD FORM 1442 (REV. 8/2014) BACK

Continued...

12363N26Q4116 Angeles National Forest Bear Divide Paving Page 4 of 85

BASE

3N17.7 Bear Divide to Camp 9

Pay item Description Unit Quantity UNIT PRICE TOTAL PRICE

151.01 Mobilization LS 1

152.01 Construction Staking LS 1

154.01 Contractor Testing LS 1

157.13 Erosion Control & Pollution Control LS 1

204.02 Excavation and Embankment (Roadway Excavation, and Stockpile) CY 450

301.03b Aggregate Base, Caltrans Class 2 AB 3/4 in. max, 6 in. depth, compaction method 301.05 (As needed at drain locations) CY 300

304.01 Full Depth Reclamation with asphalt pulverization, compaction method FSSS 204.11.(a) SQ FT 469000

403.04 Hot Mix Asphalt Caltrans 1/2 in. type A, PG 64-16 No RAP (2" Thick Asphalt) Ton 5670

606.01 Corrugated Metal Spillways (24" Overside Drain, Install New, including 80' of flume per drain) EA 4

609.06 Asphlat Curb (6" HMA) LF 4705

617.01 Guardrail Post and Rail Replacement, (70 feet in two identified locations) LF 140

3N17.7 SUBTOTAL

BEAR Divide Station Pay item Description Unit Quantity UNIT PRICE TOTAL PRICE

152.01 Construction Staking LS 1

154.01 Contractor Testing LS 1

157.13 Erosion Control & Pollution Control LS 1

301.03b Aggregate Base, Caltrans Class 2 AB 3/4 in. max, 6 in. depth, compaction method 301.05 (As needed at Helipad) CY 100

303.10 Roadbed reconditioning with asphalt pulverization, compaction method FSSS 204.11.(a) SQ FT 54950

403.04 Hot Mix Asphalt Caltrans 1/2 in. type A, PG 64-16 No RAP (2" Thick Asphalt on Road/Driveway. Helipad 4" Thick) Ton 1090 634 .01 Permanent Pavement Markings (Restripe Existing Parking Stalls) LS 1 634 .01 Permanent Pavement Markings (Restripe Helipad Landing Zone) LS 1

619.01 Replace and Relocate Existing Gate Motor and Gate Traffic Loop System LS 1

STATION SUBTOTAL

Contract Total

12363N26Q4116 Angeles National Forest Bear Divide Paving Page 5 of 85

Project 3N17.7 Santa Clara Divide Road And Bear Divide Station Paving

General Information

1.0 Scope of Work

The purpose of this contract is to replace damaged pavements on 3N17.7 Santa Clara Divide Rd and at the Bear Divide Fire Station within the Los Angeles Gateway Ranger District on the Angeles National Forest.

This contract provides for equipment, labor, materials, services and permits necessary to perform work ordered by the Government, in compliance with its terms, specifications, drawings and provisions to pulverize all road sections called out and replace with HMA Caltrans ½ in. max. Type A, PG 64-16 No RAP, and to install associated in kind pavement markings. Work will also consist of replacing and relocating a gate at the Bear Divide fire station as well as two sections of guardrail on 3N17.7 Santa Clara Divide.

Santa Clara Divide Rd will be pulverized and 2” of Caltrans HMA will be paved over the new road base, except for the called-out Helipad area which will be 4” thick asphalt. The road drainages features should collect flow in a single point and discharge at the toe of the slope. Contractor may submit alternative Overside Drain Assembly drawings for consideration so long as it provides the equivalent or better drainage capacity.

2.0 Background

This project site was impacted by the atmospheric rivers in 2022 and 2023 and the road has been closed due to safety concerns since that time. This road is a key road to the forest service for recreational users as well as internal use for fire response and other programmatic activities. This contract will provided needed repairs to Forest Service Infrastructure, to reopen access to public lands.

3.0 Location

The project location is on the Angeles National Forest within the Los Angeles Gateway Ranger Districts. The terrain can be relatively flat in a few areas and moderately hilly and steep in others. Soil conditions vary as well, from soft and sandy to compacted and extremely rocky. A general Vicinity Map is included with this solicitation. Angeles National Forest maps are also available to assist in locating the individual roads and can be purchased at the Supervisors Office.

The office is open between the hours of 8:00 am and 4:30 pm, Monday through Friday. The office is located at 701 N Santa Anita Ave, Arcadia CA 91016

Project location is Forest Service Road 3N17.7, located here 34.36014476, -118.39326, with its intersection of LA County Sand Canyon Road and Little Tujunga Canyon Road.

4.0 Estimated Start Date / Period of Performance

Projected start date: 06/01/2026

Time for completion: 120 calendar days from the issuance of the “Notice to Proceed”.

5.0 Drawings and Specifications

Drawings of the contract requirements are included in the solicitation. All specifications are referenced from FP-24. A copy of FP-24 can be found here, https://highways.dot.gov/federal-lands/specs/fp-24, and downloaded by interested contractors.

6.0 Restrictions on Work

• Work hours are limited to non-holiday weekdays, Monday – Friday, 0700 – 1900.

• In accordance with the fire plan, if included in Section J.

• When the Contracting Officer (or designated representative) determines that adverse weather has made access too dangerous or that continued vehicular travel would cause unacceptable road damage.

• For sites requiring archaeology monitoring, contractor must notify COR at least 24 hours prior to any ground disturbing activities and no ground disturbing activities may occur without a Forest Service archaeologist on site.

12363N26Q4116 Angeles National Forest Bear Divide Paving Page 6 of 85

• When the Contracting Officer or designated representative determines that work must stop due to the presence of archaeological artifacts.

• Contractor is responsible for the security of their tools and equipment at all times.

• Contractor is responsible for removal and disposal all excavated dirt and shall not leave excavated dirt scattered over the site, unless approved by the COR.

• All trash and loose materials shall be secured by the contractor daily.

• The Contractor is responsible for installing sediment control devices, such as straw wattles, to prevent sediment runoff to nearby areas. Excavation work shall not commence until sediment control devices have been installed and approved by the COR.

• The Contractor shall not use Government trash facilities without the COR’S approval.

• All construction debris remains the property of the Contractor and shall be properly disposed of off National

Forest Land.

• The contractor will be able to utilize the Forest Service Roads; however, the Contractor will be responsible for any damage to the roads due to construction activities. The contractor shall be responsible for obtaining permission to use all other roads and staging areas.

6.0 Camping and Housing

If contractor is interested in camping on the National Forest during the duration of this project, please notify the CO/COR during the Technical proposal. Contractor may request to camp at National Forest campgrounds which can be approved by the District Ranger.

7.0 Required Submittals

Contractor Schedule, shall be submitted 14 days prior to the mobilization -Schedule shall be updated as needed for significant delays of more than 7 days.

Section 040301 – Asphalt HMA Caltrans ½” Type A, PG 64-16, No RAP, Plant data and mix compliance Section 060601 – Drainage Structure Shop Drawing Submittal and Material Sheet, mill report Section 061701 – Guardrail post and rail material compliance Section 061901 – Gate Motor Submission and all Materials/Parts Section 063401 – Permanent Pavement Markings (Type H Thermoplastic) Material compliance and materials sheet All Materials Shall have plant slips and provided to COR at end of contract for quantity verifications

8.0 Gate Replacement Items

Scope of Gate Replacement Work The Angeles National Forest (ANF) urgently requires immediate support to enhance the overall security of the Bear Divide Station compound. As part of these efforts, it is critical to ensure the Employee Parking Lot remains secure while facilitating efficient access for personnel and equipment supporting the agency’s mission. The proposed solution is to furnish and install one slide gate motor operator and all its required parts, addressing the current failure of the existing gate that have been compromised by increased vehicular traffic.

12363N26Q4116 Angeles National Forest Bear Divide Paving Page 7 of 85

Summary of Equipment Needs The following items captured in the table below would be necessary in the replacement of the gate motors.

Table 1 – Summary of Equipment Needs

Work Item Item Specification 001 Furnish and Install: Heavy Duty

Sliding Gate Motor (5 Year Warranty)

One of either:

All-O-Matic SL-100-DC-FP-PRO Slide Gate Operator

LiftMaster CSL24UL-MC Slide Gate Operator

• Gate Motor must be able to operate gate up to 50’ and minimum 1,500 lbs

• Contractor should utilize existing access reader, remote control access, and key switches and program them to be compatible with the new operators. Contractor is responsible to determine if old accessories are compatible with new motor, if not contractor is responsible to replace all components

• Contractor is responsible to ensure gate installation is per manufacturers requirements and meet Underwriters Laboratory (UL) 325 compliance for safety. This includes but is not limited to photo eyes, photo edge and other necessary requirements.

002 Relocate Gate and Track Contractor will relocate Gate and Roller Track to include employee parking behind the gate secured area.

• If track is unable to be reutilize, contractor is responsible to furnish new equipment.

003 Gate Posts, Light Post, Lock and Keypad Post

Contractor responsible to relocate the Gate Closed Post, Security Light Post and Keypad Post.

• Contractor is responsible to relocate and extend all required utilities to the new gate location.

• Contractor will provide new loop sensors on either side of gate access as required by UL 325

*All items listed above are for illustrative purposes. Contractor shall provide the listed item or “approved equal” size generator/transfer switch/concrete pads meeting the demand for each site*

The Contractor shall provide all labor, materials, and equipment to complete the contract as shown on the drawings and included in the specifications. The contractor is responsible for securing all permits, fees and requirements from state

12363N26Q4116 Angeles National Forest Bear Divide Paving Page 8 of 85 and local county offices. Contractor shall follow all National Electric Code (NEC) standards for the installation of gate operators at the existing facility.

Project Location The project is located at:

Angeles National Forest Bear Divide Fire Station 21501 N Sand Canyon Rd Canyon Country, CA 91387

Contractor Requirements

9.0 Technical Requirements / Tasks

The Contractor shall furnish the necessary personnel, material, equipment, services and facilities to perform the Statement of Work/Specifications referenced below. Contractors shall be licensed to perform work in the State of California.

The Contractor shall provide equipment that is free and clear of soils, seeds, vegetative materials and other debris that could contain or hold seeds of noxious weeds. Once on-site, there will be no equipment washing requirement as this project is located within one area.

The Contractor shall minimize mechanical activity during rainy periods and the CO may shut down the operation if excessive soil disturbance and/or erosion problems occur.

The Contractor shall repair all associated damage on established roads, adjacent vegetation or other improvements caused by their operations or equipment prior to partial or final payment.

12363N26Q4116 Angeles National Forest Bear Divide Paving Page 9 of 85

The Contractor shall provide technical submittals for all materials that may be furnished on this project for Forest Service review and approval prior to installation.

The Contractor shall dispose of all project related trash and debris off of Forest lands prior to final payment.

The Contractor is responsible for contacting the Forest dispatch center to obtain the fire predicted Project Activity Level (PAL) each day and restrict their work accordingly.

The Contractor shall adhere to the pertinent requirements addressed in the Fire Plan. Fire Plan restrictions may require work to cease at 1:00 pm or not be initiated at all on a high fire activity (PAL) day.

The Contractor is responsible for traffic control and equipment staging requirements in work areas when working on National Forest System Lands.

The Contractor shall provide clean equipment for the project prior to driving on Forest and between project areas to prevent the introduction of invasive weeds to the Forest.

10.0 Government Furnished

There is no government furnished materials included in this contract.

11.0 Deliverables / Schedule

Key Deliverables

Item No. Deliverable Objective Due 1 Project Schedule See “Reporting Requirements” below 14 days prior to prework meeting

2 Traffic Control Plan Traffic Control Plan or Request for Temporary Closure- Letter to Forest Supervisor.

14 days prior to prework meeting

Materials Shop Drawings/Data Sheet on Drains

Ensure Materials are in accordance with Specs/Drawings 14 days prior to prework meeting

4 Quality Control Plan Provide information to ensure work meets the contract requirements Due with RFP

Reporting Requirements: Contractor is responsible to submit a project schedule as part of their proposal. Once selected the Government will share comments on the project schedule to be addressed by the Contractor for resubmission.

Contractor will submit updated project schedule 14 days prior to prework meeting to be approved by the Government.

Attachment Evaluation Criteria is attached.

12363N26Q4116 Angeles National Forest Bear Divide Paving Page 10 of 85

Evaluation documentation must clearly summarize and justify evaluation results. Ensure that the documentation can lead to a logical best value decision. Including a cost/price factor is a requirement of FAR 15.304. If using a trade-off process, describe the evaluation factors and their relationship to the goals of the procurement.

Section 1: Evaluation Factors

The factors to evaluate contract award will be Technical Capability, Past Performance, and Cost/Price.

The award decision is based on evaluation factors and significant subfactors that are tailored to the acquisition.

Evaluation factors and significant subfactors must:

1. Represent the key areas of importance and emphasis that directly relate to the purpose or objective of the acquisition; and

2. Support meaningful comparison and discrimination between and among competing proposals.

Select whether all evaluation factors other than cost or price, when combined, are:

1. Significantly more important than cost or price; or

2. Approximately equal to cost or price; or

3. Significantly less important than cost or price.

State whether the evaluation factors are:

1. “In ascending order of importance” (increasing in importance); or

2. “In descending order of importance” (decreasing in importance), or

3. “All of equal importance”

All factors are of equal importance. Under Technical Capability, the subfactors will be Technical Approach, Key Personnel, and Schedule. All subfactors are of equal importance.

1.1 Factor 1 Technical Capability

1.1.1 Subfactor 1 Technical Approach and Key Personnel

Submission Requirements:

What USDA will use to evaluate this subfactor Brief explanation of capability to perform the work highlighting areas like subcontractors, specific equipment to be used, and potential changes to the design or construction methods that will be to the benefit to the government’s budget or operation of the area. Information provided to identify personnel or subcontractors in key positions that will lead to the success of the project with relevant technical knowledge and skills.

Evaluation Criteria/Methodology:

Adjectival Rating, Go/No Go and/or Confidence Ratings, and the relationship between the methodology. For example: The adjectival rating and the confidence rating are of equal importance.

Adjectival Rating.

1.1.2 Subfactor 2 Schedule

Submission Requirements:

Construction schedule and narrative description.

What USDA will use to evaluate this subfactor Submission demonstrates (1) clear and efficient critical path and logical sequencing; (2) account for procurement lead time; and (3) demonstrate risk mitigation and successful completion with the period of performance.

Evaluation Criteria/Methodology:

Adjectival Rating, Go/No Go and/or Confidence Ratings, and the relationship between the methodology. For example: The adjectival rating and the confidence rating are of equal importance.

Technical Confidence Rating.

12363N26Q4116 Angeles National Forest Bear Divide Paving Page 11 of 85

1.2 Factor 2: Past Performance

1.2.1 Past Performance

Submission Requirements:

Provide examples of projects/work within the prior three (3) years which involve water system rehabilitation and road work. Examples that are more relevant to the requirements of this solicitation will be given more weight in the overall past performance rating. Examples should show capability to successful complete relevant projects of similar scope and magnitude.

Evaluation Criteria/Methodology:

Ratings will be based on: Relevancy, Recency (to be defined in each solicitation, not using FAR terms and definitions), Quality defined in: FAR 42.1503.

Performance Confidence Assessment.

1.3 Factor 3: Cost/Price

1.3.1 Contract Cost/Price

Submission Requirements:

Completed schedule of items. Proposed pricing will be evaluated for fairness and reasonableness. Reasonableness will be determined considering comparisons to the competitive pricing and the independent government cost estimate.

Proposed pricing that differs significantly from the competition or IGE will be reviewed to assess potential performance risk and the offeror’s understanding of contract requirements. If multiple contract line items are included in the price schedule, prices will be evaluated to determine whether any line items are unbalanced. Another component of the rating will be pricing completeness so bidders are strongly urged to bid on all base and option items with a detailed breakdown of cost for each line item in the schedule of items.

Evaluation Criteria/Methodology:

Adjectival Ranking.

12363N26Q4116 Angeles National Forest Bear Divide Paving Page 12 of 85

Section 2: Definitions

2.1 Adjectival Ratings

Adjectival Rating Definition Exceptional Quote/Offer contains no deficiencies and fully addresses all aspects of the criteria and demonstrates an excellent approach/solution and understanding of the requirements. Many strengths exist, far outweighing any weaknesses. The highest quality of contract performance is anticipated with very low risk.

Very Good Quote/Offer contains no deficiencies; fully addresses all aspects of the criteria and demonstrates a very effective approach/solution and understanding of the requirements. Some weaknesses may exist; however, the weaknesses, if any, are outweighed by strengths. A high quality of contract performance is anticipated with low risk.

Satisfactory Quote/Offer contains no deficiencies; addresses all aspects of the criteria and demonstrates an adequate approach/solution and understanding of the requirements. Strengths and weaknesses are offsetting or will have little or no impact on contract performance. A quality contract performance is anticipated with an acceptable amount of risk.

Marginal Quote/Offer may contain deficiencies; fails to address all of the criteria and does not demonstrate an adequate approach/solution or understanding of the requirements. One or more weaknesses exist which are not offset by strengths.

Contract performance is anticipated with high risk.

Unsatisfactory Quote/Offer contains many deficiencies and does not address all aspects of the criteria and/or does not present evidence demonstrating an adequate approach/solution and understanding of the requirements. Many weaknesses and/or omissions exist creating an unacceptable risk.

2.2 Technical Confidence Rating

Confidence Rating Definition

High Confidence (Low Risk)

The Government has high confidence the vendor understands the requirement, proposes a sound approach, and will be successful in performing the contract with little or no Government intervention.

Some Confidence (Moderate Risk)

The Government has some confidence the vendor understands the requirement, proposes a sound approach, and will be successful in performing the contract with some Government intervention.

Low Confidence (High Risk)

The Government has low confidence the vendor understands the requirement, proposes a sound approach, or will be successful in performing the contract even with Government intervention.

2.3 Performance Confidence Assessment

Rating Description

Substantial Confidence Based on the offeror’s performance record, the government has a high expectation that the offeror will successfully perform the required effort.

Satisfactory Confidence Based on the offeror’s performance record, the government has an expectation that the offeror will successfully perform the required effort.

12363N26Q4116 Angeles National Forest Bear Divide Paving Page 13 of 85

Limited Confidence Based on the offeror’s performance record, the government has a low expectation that the offeror will successfully perform the required effort.

No Confidence Based on the offeror’s performance record, the government has no expectation that the offeror will be able to successfully perform the required effort.

Unknown Confidence No performance record is identifiable, or the offeror’s performance record is so sparse that no confidence assessment rating can be reasonably assigned.

12363N26Q4116 Angeles National Forest Bear Divide Paving Page 14 of 85

U.S. FOREST SERVICE

PACIFIC SOUTHWEST REGION, REGION 5

ANGELES NATIONAL FOREST

SUPERVISOR’S OFFICE GATE MOTOR

REPLACEMENT BEAR DIVIDE

CONTRACT DRAWINGS

MARCH 2026

The requirements contained in these specifications are hereby made a part of this solicitation and any resultant contract

12363N26Q4116 Angeles National Forest Bear Divide Paving Page 15 of 85

Gate Pictures and Current Conditions

PRIMARY GATE:

12363N26Q4116 Angeles National Forest Bear Divide Paving Page 16 of 85

12363N26Q4116 Angeles National Forest Bear Divide Paving Page 17 of 85

PRIMARY GATE OPERATOR:

12363N26Q4116 Angeles National Forest Bear Divide Paving Page 18 of 85

PRIMARY GATE ACCESSORIES AND CONTROLS:

12363N26Q4116 Angeles National Forest Bear Divide Paving Page 19 of 85

PROPOSED NEW GATE LOCATION

EXISTING GATE LOCATION

EMPLOYEE

PARKING

12363N26Q4116 Angeles National Forest Bear Divide Paving Page 20 of 85

FOREST LOCATION MAP

TRAVEL DIRECTIONS:

SHEET OF

United States Department of Agriculture Forest Service

FOREST SERVICE ROAD 3N17.7 SANTA CLARA DIVIDE

FROM INTERSTATE 210, EXIT OF AT EXIT 8 OSBORNE ST / FOOTHILL BLVD. TURN RIGHT ONTO FOOTHILL BLVD AND IN 0.1 MILES TURN LEFT ONTO OSBORNE ST. CONTINUE 11.3 MILES ON LITTLE TUJUNGA CANYON ROAD/SAND CANYON ROAD. DESTINATION WILL BE ON YOUR LEFT, BEAR DIVIDE

PICNIC VISTA.

FROM CALIFORNIA-14, TAKE EXIT 3 FOR PLACERITA CANYON ROAD. HEAD EAST ON PLACERITA CANYON ROAD FOR 4.9 MILES, THEN TURN RIGHT (SOUTH) ONTO SAND CANYON ROAD. CONTINUE ON SAND CANYON ROAD FOR 3.0 MILES, DESTINATION WILL BE ON YOUR RIGHT. BEAR DIVIDE PICNIC

VISTA.

GREAT DIVIDE DISTRICT OFFICE

22223 STATE HIGHWAY 13

GLIDDEN, WI 54527

AND BEAR DIVIDE STATION ROAD IMPROVEMENTS

3/2 /26

2:

Z

AC

HA

RY

BI

NV

ER

SI

E

C:

\U

SE

RS

\Z

AC

HA

RY

BI

NV

ER

SI

E\

ON

ED

RI

VE

US

DA

\D

ES

KT

OP

\3N

S

TO

RM

D

AM

AG

E

CO

NT

RA

CT

\3N

B

D

TO

C

AM

P 9 A

SP

HA

LT

.D

W T;

CALIFORNIA

LOS ANGELES COUNTY

(R05) PACIFIC SOUTHWEST

ANGELES NATIONAL FOREST

LOS ANGELES GATEWAY RANGER DISTRICT

INDEX OF SHEETS

SHEET SHEET TITLE DATE

G-01 COVERSHEET

A-01 SITE OVERVIEW

B-01 PAVING AND DRAIN LOCATIONS 1

B-02 PAVING AND DRAIN LOCATIONS 2

B-03 PAVING AND DRAIN LOCATIONS 3

B-04 PAVING AND DRAIN LOCATIONS 4

B-05 PAVING AND DRAIN LOCATIONS 5

B-06 GUARDRAIL LOCATIONS

C-01 TYPICAL SECTIONS 1

C-02 TYPICAL SECTIONS 2

C-03 ROAD DETAILS 1

C-04 ROAD DETAILS 2

C-05 ROAD DETAILS 3

C-06 ROAD DETAILS 4

C-07 ROAD DETAILS 5

C-08 ROAD DETAILS 6

12363N26Q4116 Angeles National Forest Bear Divide Paving Page 21 of 85

H

BEAR DIVIDE ELEV. 3409'

PROPOSED GATE

RELOCATION

EXISTING GATE LOCATION

204.02 450 CY ROADWAY EXCAVATION

DRAWN

DESIGNER

STAMPS, LOGOS, AND SEALS

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.DATE

PROJECT NO.

DRAWING SHEET NO.

DATENO.

REVISION / ISSUE

OFSHEET

United States Department of Agriculture Forest Service

3/2 /26

:5

9 Z

AC

HA

RY

BI

NV

ER

SI

E C:

\U

SE

RS

\Z

AC

HA

RY

BI

NV

ER

SI

E\

ON

ED

RI

VE

US

DA

\D

ES

KT

OP

\3N

S

TO

RM

D

AM

AG

E

CO

NT

RA

CT

\3N

B D

TO

C

AM

P

9 A

SP

HA

LT

.D W

T;

(R05)

PACIFIC SOUTHWEST

BEAR DIVIDE

PAVING

ANGELES NATIONAL

FOREST

LOS ANGELES GATEWAY DISTRICT

SITE OVERVIEW

03/02/2026

Z.BINVERSIE

A-01 002 016

12363N26Q4116 Angeles National Forest Bear Divide Paving Page 22 of 85

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

AutoCAD SHX Text E

H

BEAR DIVIDE ELEV. 3409'

X

X

PROPOSED GATE

RELOCATION

EXISTING GATE LOCATION

DRAWN

DESIGNER

STAMPS, LOGOS, AND SEALS

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.DATE

PROJECT NO.

DRAWING SHEET NO.

DATENO.

REVISION / ISSUE

OFSHEET

United States Department of Agriculture Forest Service

3/2 /26

:0

2 Z

AC

HA

RY

BI

NV

ER

SI

E C:

\U

SE

RS

\Z

AC

HA

RY

BI

NV

ER

SI

E\

ON

ED

RI

VE

US

DA

\D

ES

KT

OP

\3N

S

TO

RM

D

AM

AG

E

CO

NT

RA

CT

\3N

B D

TO

C

AM

P

9 A

SP

HA

LT

.D W

T;

(R05)

PACIFIC SOUTHWEST

BEAR DIVIDE

PAVING

ANGELES NATIONAL

FOREST

LOS ANGELES GATEWAY DISTRICT

PAVING AND DRAIN

LOACTIONS 1

03/02/2026

Z.BINVERSIE

B-01 003 016

X X

XX

X X

XX

EXISTING OVERSIDE DRAIN

INSTALL NEW ASPHALT CURB

INSTALL NEW OVERSIDE DRAIN

EXISTING GATE LOCATION

REPLACEMENT GATE RELOCATION

HELIPAD STRIPING AND MARKINGS

(TYPE H THERMOPLASTIC WITH

GLASS BEADS)

BEAR DIVIDE ELEV.

3409'

BEGIN 4' THICK ASPHALT FOR HELIPAD

BEGIN BEAR DIVIDE STATION BASE OPTION

204.02 EXCAVATION STOCKPILE LOCATION

12363N26Q4116 Angeles National Forest Bear Divide Paving Page 23 of 85

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

204.02 450 CY ROADWAY EXCAVATION

DRAWN

DESIGNER

STAMPS, LOGOS, AND SEALS

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.DATE

PROJECT NO.

DRAWING SHEET NO.

DATENO.

REVISION / ISSUE

OFSHEET

United States Department of Agriculture Forest Service

3/2 /26

:0

2 Z

AC

HA

RY

BI

NV

ER

SI

E C:

\U

SE

RS

\Z

AC

HA

RY

BI

NV

ER

SI

E\

ON

ED

RI

VE

US

DA

\D

ES

KT

OP

\3N

S

TO

RM

D

AM

AG

E

CO

NT

RA

CT

\3N

B D

TO

C

AM

P

9 A

SP

HA

LT

.D W

T;

(R05)

PACIFIC SOUTHWEST

BEAR DIVIDE

PAVING

ANGELES NATIONAL

FOREST

LOS ANGELES GATEWAY DISTRICT

PAVING AND DRAIN

LOACTIONS 2

03/02/2026

Z.BINVERSIE

B-02 004 016

X X

XX

X X

XX

EXISTING OVERSIDE DRAIN

INSTALL NEW ASPHALT CURB

INSTALL NEW OVERSIDE DRAIN

EXISTING GATE LOCATION

REPLACEMENT GATE RELOCATION

HELIPAD STRIPING AND MARKINGS

(TYPE H THERMOPLASTIC WITH

GLASS BEADS)

BEAR DIVIDE ELEV.

3409'

12363N26Q4116 Angeles National Forest Bear Divide Paving Page 24 of 85

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

204.02 450 CY ROADWAY EXCAVATION

DESIGNER

STAMPS, LOGOS, AND SEALS

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.DATE

PROJECT NO.

DRAWING SHEET NO.

DATENO.

REVISION / ISSUE

OFSHEET

United States Department of Agriculture Forest Service

3/2 /26

:0

2 Z

AC

HA

RY

BI

NV

ER

SI

E C:

\U

SE

RS

\Z

AC

HA

RY

BI

NV

ER

SI

E\

ON

ED

RI

VE

US

DA

\D

ES

KT

OP

\3N

S

TO

RM

D

AM

AG

E

CO

NT

RA

CT

\3N

B D

TO

C

AM

P

9 A

SP

HA

LT

.D W

T;

(R05)

PACIFIC SOUTHWEST

BEAR DIVIDE

PAVING

ANGELES NATIONAL

FOREST

LOS ANGELES GATEWAY DISTRICT

PAVING AND DRAIN

LOACTIONS 3

03/02/2026

Z.BINVERSIE

B-03 005 016

X X

XX

X X

XX

EXISTING OVERSIDE DRAIN

INSTALL NEW ASPHALT CURB

INSTALL NEW OVERSIDE DRAIN

EXISTING GATE LOCATION

REPLACEMENT GATE RELOCATION

HELIPAD STRIPING AND MARKINGS

(TYPE H THERMOPLASTIC WITH

GLASS BEADS)

BEAR DIVIDE ELEV. 3409'

12363N26Q4116 Angeles National Forest Bear Divide Paving Page 25 of 85

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

DESIGNER

STAMPS, LOGOS, AND SEALS

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.DATE

PROJECT NO.

DRAWING SHEET NO.

DATENO.

REVISION / ISSUE

OFSHEET

United States Department of Agriculture Forest Service

3/2 /26

:0

2 Z

AC

HA

RY

BI

NV

ER

SI

E C:

\U

SE

RS

\Z

AC

HA

RY

BI

NV

ER

SI

E\

ON

ED

RI

VE

US

DA

\D

ES

KT

OP

\3N

S

TO

RM

D

AM

AG

E

CO

NT

RA

CT

\3N

B D

TO

C

AM

P

9 A

SP

HA

LT

.D W

T;

(R05)

PACIFIC SOUTHWEST

BEAR DIVIDE

PAVING

ANGELES NATIONAL

FOREST

LOS ANGELES GATEWAY DISTRICT

PAVING AND DRAIN

LOACTIONS 4

03/02/2026

Z.BINVERSIE

B-04 006 016

X X

XX

X X

XX

EXISTING OVERSIDE DRAIN

INSTALL NEW ASPHALT CURB

INSTALL NEW OVERSIDE DRAIN

EXISTING GATE LOCATION

REPLACEMENT GATE RELOCATION

HELIPAD STRIPING AND MARKINGS

(TYPE H THERMOPLASTIC WITH

GLASS BEADS)

BEAR DIVIDE ELEV. 3409'

12363N26Q4116 Angeles National Forest Bear Divide Paving Page 26 of 85

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

STAMPS, LOGOS, AND SEALS

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.DATE

PROJECT NO.

DRAWING SHEET NO.

DATENO.

REVISION / ISSUE

OFSHEET

United States Department of Agriculture Forest Service

3/2 /26

:0

2 Z

AC

HA

RY

BI

NV

ER

SI

E C:

\U

SE

RS

\Z

AC

HA

RY

BI

NV

ER

SI

E\

ON

ED

RI

VE

US

DA

\D

ES

KT

OP

\3N

S

TO

RM

D

AM

AG

E

CO

NT

RA

CT

\3N

B D

TO

C

AM

P

9 A

SP

HA

LT

.D W

T;

(R05)

PACIFIC SOUTHWEST

BEAR DIVIDE

PAVING

ANGELES NATIONAL

FOREST

LOS ANGELES GATEWAY DISTRICT

PAVING AND DRAIN

LOACTIONS 5

03/02/2026

Z.BINVERSIE

B-05 007 016

X X

XX

X X

XX

EXISTING OVERSIDE DRAIN

INSTALL NEW ASPHALT CURB

INSTALL NEW OVERSIDE DRAIN

EXISTING GATE LOCATION

REPLACEMENT GATE RELOCATION

HELIPAD STRIPING AND MARKINGS

(TYPE H THERMOPLASTIC WITH

GLASS BEADS)

BEAR DIVIDE ELEV. 3409'

12363N26Q4116 Angeles National Forest Bear Divide Paving Page 27 of 85

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

STAMPS, LOGOS, AND SEALS

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.DATE

PROJECT NO.

DRAWING SHEET NO.

DATENO.

REVISION / ISSUE

OFSHEET

United States Department of Agriculture Forest Service

3/2 /26

:0

2 Z

AC

HA

RY

BI

NV

ER

SI

E C:

\U

SE

RS

\Z

AC

HA

RY

BI

NV

ER

SI

E\

ON

ED

RI

VE

US

DA

\D

ES

KT

OP

\3N

S

TO

RM

D

AM

AG

E

CO

NT

RA

CT

\3N

B D

TO

C

AM

P

9 A

SP

HA

LT

.D W

T;

(RXX)

REGION NAME

PROJECT NAME

FOREST NAME

DISTRICT NAME

GUARDRAIL LOCATIONS

03/02/2026

Z.BINVERSIE

B-06 008 016

GUARDRAIL REPLACEMENT LOCATIONS

12363N26Q4116 Angeles National Forest Bear Divide Paving Page 28 of 85

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

18' TYP. WIDTH

EXISTING PAVED SURFACE AVERAGE 2"

EXISTING SLOPE VARIABLE

CONSTRUCTION LIMITS IF DITCH RECONSTRUCTION REQUIRED

TYPICAL EXISTING SECTION (N.T.S.)

VARIES

MAINTAIN EXISTING

INSLOPE CONFIGURATION

EXISTING SLOPE VARIES

CONSTRUCTION LIMITS TYP.

NEW ASPHALT OVERLAY 2"

PROPOSED TYPICAL SECTION

EXISTING DITCH

(N.T.S.)

CROSS SLOPE VARIES

EXISTING BASE VARIES 0 - 4"

EXISTING SLOPE VARIABLE

EXISTING SLOPE VARIABLE

COMPACT PULVERIZED ASPHALT BASE

OR EXISTING SUBGRADE TO 95% MAX

DENSITY

DRAWN

DESIGNER

STAMPS, LOGOS, AND SEALS

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.DATE

PROJECT NO.

DRAWING SHEET NO.

DATENO.

REVISION / ISSUE

OFSHEET

United States Department of Agriculture Forest Service

3/2 /26

:0

2 Z

AC

HA

RY

BI

NV

ER

SI

E C:

\U

SE

RS

\Z

AC

HA

RY

BI

NV

ER

SI

E\

ON

ED

RI

VE

US

DA

\D

ES

KT

OP

\3N

S

TO

RM

D

AM

AG

E

CO

NT

RA

CT

\3N

B D

TO

C

AM

P

9 A

SP

HA

LT

.D W

T;

(R05)

PACIFIC SOUTHWEST

BEAR DIVIDE

PAVING

ANGELES NATIONAL

FOREST

LOS ANGELES GATEWAY DISTRICT

TYPICAL SECTIONS 1

03/02/2026

Z.BINVERSIE

C-01 009 016

12363N26Q4116 Angeles National Forest Bear Divide Paving Page 29 of 85

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

MAINTAIN EXISTING

INSLOPE CONFIGURATION

NEW ASPHALT OVERLAY 4"

PROPOSED HELIPAD

TYPICAL SECTION

EXISTING DITCH

(N.T.S.)

EXISTING SLOPE VARIABLE

EXISTING SLOPE VARIABLE

COMPACT PULVERIZED ASPHALT BASE

OR EXISTING SUBGRADE TO 95% MAX

DENSITY

H

BEAR DIVIDE ELEV. 3409'

BOUNDARY LINE TO BE 12" WIDE LINES

50' X 50' SQUARE

H SYMBOL AND TRIANGLE TO BE 16" WIDE LINES

TRIANGLE TO BE 30' SIDES EQUAL LENGTH

HELIPAD NAME AND ELEVATION TO BE

FHWA/DOT 96" TEXT

PROPOSED HELIPAD MARKINGS AND LETTERING

DRAWN

DESIGNER

STAMPS, LOGOS, AND SEALS

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.DATE

PROJECT NO.

DRAWING SHEET NO.

DATENO.

REVISION / ISSUE

OFSHEET

United States Department of Agriculture Forest Service

3/2 /26

:0

2 Z

AC

HA

RY

BI

NV

ER

SI

E C:

\U

SE

RS

\Z

AC

HA

RY

BI

NV

ER

SI

E\

ON

ED

RI

VE

US

DA

\D

ES

KT

OP

\3N

S

TO

RM

D

AM

AG

E

CO

NT

RA

CT

\3N

B D

TO

C

AM

P

9 A

SP

HA

LT

.D W

T;

(R05)

PACIFIC SOUTHWEST

BEAR DIVIDE

PAVING

ANGELES NATIONAL

FOREST

LOS ANGELES GATEWAY DISTRICT

TYPICAL SECTIONS 2

03/02/2026

Z.BINVERSIE

C-02 010 016

12363N26Q4116 Angeles National Forest Bear Divide Paving Page 30 of 85

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

ADJACENT ROADBED.

(2) BERM NOT REQUIRED WHEN DIP EMPTIES ONTO

NATURAL GROUND OR IN INSLOPED ROADS.

B EC

G H

(SEE SCHEDULE)

SKEWED

AS STAKED

DOWN GRADE BREAK WITH

GRADE CROSS SLOPECROSS SLOPE

BERM OR DIKE

12" MIN. HEIGHT

PLAN VIEW

% OF GRADE UNDER 5 8 9 10 1276

"A" LENGTH 45' 50' 55' 60' 65' 70' 80

2.8' 3.0'2.6'2.5'2.3'2.2'2.1'"D" DEPTH

DIMENSION SCHEDULE

PROFILE B.C.E.

PROFILE F.G.H

NOTES:

(1) MATERIAL EXCAVATED SHALL BE PLACED

BY COMPACTION METHOD SPECIFIED FOR

H

F

G D

1/2"/D

B

C E

VARIES VARIES

10' MIN. VERT. CURVES

"A"20'

VARIES "A"

(SEE SCHEDULE)

F

PERSPECTIVE VIEW DRAWN

DESIGNER

STAMPS, LOGOS, AND SEALS

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.DATE

PROJECT NO.

DRAWING SHEET NO.

DATENO.

REVISION / ISSUE

OFSHEET

United States Department of Agriculture Forest Service

3/2 /26

:0

2 Z

AC

HA

RY

BI

NV

ER

SI

E C:

\U

SE

RS

\Z

AC

HA

RY

BI

NV

ER

SI

E\

ON

ED

RI

VE

US

DA

\D

ES

KT

OP

\3N

S

TO

RM

D

AM

AG

E

CO

NT

RA

CT

\3N

B D

TO

C

AM

P

9 A

SP

HA

LT

.D W

T;

(R05)

PACIFIC SOUTHWEST

BEAR DIVIDE

PAVING

ANGELES NATIONAL

FOREST

LOS ANGELES GATEWAY DISTRICT

ROAD DETAILS

03/02/2026

Z.BINVERSIE

C-03 011 016

12363N26Q4116 Angeles National Forest Bear Divide Paving Page 31 of 85

AutoCAD SHX Text C

AutoCAD SHX Text C

AutoCAD SHX Text C

AutoCAD SHX Text G

AutoCAD SHX Text

DOWN GRADE

AutoCAD SHX Text C

AutoCAD SHX Text L

AutoCAD SHX Text

ORIGINAL SLOPE LINE

AutoCAD SHX Text

ORIGINAL

AutoCAD SHX Text

GRADE LINE

AutoCAD SHX Text B

AutoCAD SHX Text E

AutoCAD SHX Text F

AutoCAD SHX Text H

AutoCAD SHX Text

20' MIN

AutoCAD SHX Text 10'

AutoCAD SHX Text

(MIN)

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text Slope to drain

HMA CURB

RIPRAP PLAN VIEW SECTION B-B

NOTES:

INLET ASSEMBLY PLAN

SPILLWAY INLET ASSEMBLY &

FLUME INSTALLATION - TYP.

24" FLUME BOLTHOLE PLAN

SECTION A-A

DRAWN

DESIGNER

STAMPS, LOGOS, AND SEALS

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.DATE

PROJECT NO.

DRAWING SHEET NO.

DATENO.

REVISION / ISSUE

OFSHEET

United States Department of Agriculture Forest Service

3/2 /26

:0

2 Z

AC

HA

RY

BI

NV

ER

SI

E C:

\U

SE

RS

\Z

AC

HA

RY

BI

NV

ER

SI

E\

ON

ED

RI

VE

US

DA

\D

ES

KT

OP

\3N

S

TO

RM

D

AM

AG

E

CO

NT

RA

CT

\3N

B D

TO

C

AM

P

9 A

SP

HA

LT

.D W

T;

(R05)

PACIFIC SOUTHWEST

BEAR DIVIDE

PAVING

ANGELES NATIONAL

FOREST

LOS ANGELES GATEWAY DISTRICT

ROAD DETAILS 2

03/02/2026

Z.BINVERSIE

C-04 012 016

12363N26Q4116 Angeles National Forest Bear Divide Paving Page 32 of 85

AutoCAD SHX Text N.T.S.

AutoCAD SHX Text N.T.S.

AutoCAD SHX Text

1. ADJOINMENT OF INLET, STARTER, AND FLUME SECTIONS SHALL

AutoCAD SHX Text BE MADE WITH 1/2"x2" BOLTS, 1/2" NUTS AND LOCK WASHERS.

AutoCAD SHX Text

INSTALL WITH BOLT HEAD ON THE INSIDE. ALL HARDWARE SHALL

AutoCAD SHX Text

BE HOT-DIPPED GALVANIZED.

AutoCAD SHX Text

2. FIELD PUNCHED HOLES SHALL BE DEBURRED. EXPOSED METAL

AutoCAD SHX Text

SHALL BE COATED WITH ZINC DUST-ZINC OXIDE AND EXTERIOR

AutoCAD SHX Text

ALUMINUM PAINT.

AutoCAD SHX Text

3. ANCHOR STAKES SHALL BE ATTACHED WITH NO. 9 SINGLE STRAND

AutoCAD SHX Text

MULTIPLE TIE GALVANIZED. STEEL WIRE THROUGH TWO FIELD

AutoCAD SHX Text

HOLES, 2" APART, LOCATED EACH SIDE OF ANCHOR STAKE.

AutoCAD SHX Text

4. EROSION PROTECTION AND RIP-RAP TO BE INSTALLED WHERE

AutoCAD SHX Text

FEASIBLE. IF PROTECTION WHERE SOIL IS NOT FEASIBLE, MATERIAL

AutoCAD SHX Text

MATERIAL AT OUTLET TO BE OPENED AND FLARED TO ALLOW

AutoCAD SHX Text

DRAINAGE. USE NATIVE ROCK IF NO SEPARATE PAY ITEM

AutoCAD SHX Text 3"

AutoCAD SHX Text

2:1 LAYBACK

AutoCAD SHX Text

TIEWIRE (TYP.)

AutoCAD SHX Text

RECTANGULAR

AutoCAD SHX Text

ATTACHMENT

AutoCAD SHX Text

(BOTH SIDES)

AutoCAD SHX Text N.T.S.

AutoCAD SHX Text

EDGE OF TRAVELED WAY

AutoCAD SHX Text

TOP OF EARTH BERM

AutoCAD SHX Text

STARTER SECTION

AutoCAD SHX Text

SPILLWAY INLET ASSEMBLY

AutoCAD SHX Text

2:1 LAYBACK

AutoCAD SHX Text

EA. SIDE OF

AutoCAD SHX Text

FLUME

AutoCAD SHX Text

INLET SECTION

AutoCAD SHX Text

SPILLWAY INLET

AutoCAD SHX Text

NATURAL GROUND

AutoCAD SHX Text

OR FILL SLOPE

AutoCAD SHX Text

10 FT. STANDARD LENGTH

AutoCAD SHX Text

2'-4"(12"SIZE) 3'-6"(24"SIZE)

AutoCAD SHX Text

BUILT-UP EARTH BERM

AutoCAD SHX Text 1'

AutoCAD SHX Text 2'±

AutoCAD SHX Text

EDGE OF TRAVELED WAY

AutoCAD SHX Text

BLEND TOP OF STANDARD EARTH BERM TO TOP OF INLET SECTION WING. SEE NOTE #5.

AutoCAD SHX Text

FIELD PUNCH 1/2" HOLES

AutoCAD SHX Text

OVERLAP 4"± AT ALL JOINTS, UPPER SECTION INSIDE

AutoCAD SHX Text

NATURAL GROUND OR FILL SLOPE

AutoCAD SHX Text

USE NATIVE ROCK MATERIAL IF NO SEPARATE PAY ITEM. SEE NOTE #4.

AutoCAD SHX Text

%%USTARTER SECTION

A…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .