About this file

This document is a pre-solicitation notice for the BCLH Stewardship IRSC Phase 2 project, which will be awarded under the Stewardship Authority. The objectives of this project are to reduce the risks of hazardous fuels along important access routes within the 2020 fire-affected road system. Key work requirements include cutting and removing fire-killed trees within 100 feet of roads (176 acres mandatory, 300 acres optional), falling and leaving hazard trees in special measure areas (161 acres mandatory, 332 acres optional), performing small fuels treatment within 30 feet of roads (200 acres mandatory, 257 acres optional), and road reconstruction and maintenance activities. The mandatory road reconstruction work is estimated between $1,000,000 and $5,000,000, and the optional work between $500,000 and $1,000,000. A site visit is scheduled for October 5, 2024, and the final solicitation is anticipated to be issued on or around February 21, 2025, with award planned for April 25, 2025. The resulting contract will be a firm fixed price contract using a best value source selection method.

View the file

Other files

File Type Posted
SiteVisitNotes_110424.pdf PDF
DRAFT_Phase2_Appendix A_103024.docx DOCX document
DRAFT_Phase2_Appendix B_103024.docx DOCX document
Phase2_AppendixC_DRAFT.pdf PDF
Excerpt_DRAFT_RFP_Phase2_102924.pdf PDF
DRAFT_Phase2_Construction_FSSS_102924.pdf PDF
DRAFT Phase 2 Burn Severity Map_102924.pdf PDF
DRAFT Slope Table_102924.xlsx XLSX spreadsheet
DRAFT_ConstructionTypicals_102924.pdf PDF
DRAFT Burn Severity Table_102924.xlsx XLSX spreadsheet
Attachment1_VICINITY MAPS.pdf PDF
Attachment2_ProjectAreaAccessInstructions.docx DOCX document
Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

LH-15

LH-14

LH-54

LH-66

LH-14A

LH-55

LH-64

LH-66A

LH-55A

LH-55D

LH-15D

LH-53

LH-13

LH-15C

LH-1

LH-63

LH-51

LH-55C

LH-15A

LH-75

LH-15CA LH-64A

LH-55B

LH-3A

LH-52 LH-4

LH-54D

LH-50

LH-52ALH-54C

LH-72

LH-54B

LH-15B

BC-8

LH-54A

LH-64B

LH-3B

LH-51A

LH-15E

LH-52BLH-52C

24 1 4

6 4

9 8

36 15

5 46 3

2 3 56

34 32

33 31

36323334

1012 1014

061610

505535

461 313

717 099

056 058

055J

540 513

0 70

0 225

2234 023

T 1 1 S

T 1 2 S

T 0 9 S

T 1 0 S

T 0 8 S

T 1 1 S

T 1 1 S

T 1 1 S

T 1 2 S

T 0 9 S

T 1 0 S

R 06 ER 05 ER 05 E R 05 E R 05 E

R 07 E

R 07 E R 08 E

R 05 E R 06 E R 07 E

R 04 E

W a l d o L a k e

Hwy 22

R

0 1.5 30.75 Miles

TJR - 10/28/2024

Contract Provision References C5.12# Use of Roads by Purchaser: Applies to All Roads Identified on the Contract Area Map and as Agreed to by Forest Service C2.355# Applies to All Subdivisions C6.74# Slash Treatment Requirements: Applies to All Mandatory Subdivisions

Hwy 22 Portland

BendEugene

Roseburg

§̈¦80

§̈¦5

§̈¦5 ¬«97

¬«97

¬«58

Willamette National Forest

BCLH Phase 2 DxP IRSC Project Area

¬«58

¬«22

¬«20

¬«126

Place Holder for C5.12# info

BCLH Phase 2 DxP IRSC Contract Area Map

Detroit Ranger District Willamette National Forest

Mt. Jefferson Wilderness

Mt. Jefferson Wilderness

§̈¦80

BC-8

LH-1

LH-13

LH-14

LH-14A

LH-15

LH-15A

LH-15B

LH-15C

LH-15CA

LH-15D

LH-15E

LH-3A

LH-3B

LH-4

LH-4A

LH-50

LH-51

LH-51A

LH-52

LH-52A

LH-52B

LH-52C

LH-53

LH-54

LH-54A

LH-54B

LH-54C

LH-54D

LH-55

LH-55A

LH-55B

LH-55C

LH-55D

LH-6

LH-63

LH-64

LH-64A

LH-64B

LH-66

LH-66A

LH-72

LH-75

BCLH Phase 2 DxP IRSC Boundary

Waterbody

! ! ! ! Protect Streams B6.5

PRIVATE

Wilderness

# Subdivision, C2.355#

Subdivision # B1.1

Total Tree Felling Ac.

C2.355#

Total Required

Fuels Treamtent

(0-30')

Subdivision # B1.1

Total Tree Felling Ac.

C2.355#

Total Required

Fuels Treamtent

(0-30')

BC-8 2.6 5.9 LH-13 21.6 16.9

LH-1 16.6 16 LH-14A 22.6 10.4

LH-14 51 41.8 LH-15A 7.6 9.3

LH-15 0 25.7 LH-15B 2.7 1.5

LH-51 33.7 29.3 LH-15C 18 10.2

LH-51A 1.9 1.1 LH-15CA 6.1 2.7

LH-54 35 30.8 LH-15D 11.8 7.2

LH-63 0 9.5 LH-15E 0 0.5

LH-64 0 5.7 LH-15F 0 0.7

LH-64B 0 2.2 LH-3A 30.6 33.7

LH-66 30.8 28.9 LH-3B 1.9 3

LH-75 4.8 3.3 LH-3C 0.5 1

TOTAL 176.4 200.2 LH-4 8.9 8.3

LH-4A 3.3 4.3

LH-50 6 6.9

LH-52 13 16.5

LH-52A 3.1 1.5

LH-52B 0 0.3

LH-52C 0.4 0.1

LH-53 10 8

LH-54A 1.3 3.9

LH-54B 2.6 3.5

LH-54C 9.8 9

LH-54D 0.3 4

LH-55 33 27.6

LH-55A 25.2 20.4

LH-55B 18.7 12.6

LH-55C 8.8 8.7

LH-55D 11.2 7.8

LH-6 0 0.4

LH-64A 4.9 2.5

LH-66A 10.5 7.5

LH-72 2.9 3.5

LH-74 2.9 2.6

TOTAL 300.2 257