This document is an amendment (Amendment 0002) to a solicitation (Solicitation 12363N24Q4195) for road maintenance services for the Custer-Gallatin National Forest - Beartooth Ranger District. The amendment makes the following key changes:

  1. Changes the Product/Service Code (PSC) from Y1LB to F018 and the NAICS Code from 237310 to 115310.
  2. Provides responses to 3 vendor inquiries, including details on compaction requirements for grading and spot surfacing.
  3. Removes solicitation language related to the Prosecution of Work, Physical Data, and other unspecified sections.

The solicitation is a 100% small business set-aside, with an estimated period of performance from July 8, 2024 to October 22, 2024. The work is located in Carbon and Stillwater Counties, Montana, and the contracting agency is the USDA Forest Service. Contractors must acknowledge receipt of this amendment when submitting their offers.

View the file

Other files

File Type Posted
Pryors Location Maplabeled.pdf PDF
QandA - 4.pdf PDF
Beartooth Location Maplabeled.pdf PDF
Beartooth Eastlabeledrev.pdf PDF
SF30-Amendment 0001.pdf PDF
QandA - 1.pdf PDF
CGNF RD MAINT SPECS.pdf PDF
Pryors Location Map.pdf PDF
Rock Creek Map.pdf PDF
SF-1449 12363N24Q4195.pdf PDF
BRD_Rd Maint FY24 Plans.pdf PDF
Beartooth East Map.pdf PDF
Beartooth Location Map.pdf PDF
Rosebud Map.pdf PDF
Wage Determinations 1976-1342.pdf PDF
Pryors Map.pdf PDF
GENERAL FIRE SAFETY REQUIREMENTS.pdf PDF
Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

12363N24Q4195 x x copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

363N

WASHINGTON DC 20250-1138

MS-1138

1400 INDEPENDENCE AVE SW

USDA-FS STEWARDSHIP CONTRACTING BR

06/07/20240002

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

05/22/2024

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

The purpose of Amendment 0002 is to provide the following:

1. Change the Product/Service Code (PSC) from Y1LB to F018.

2. Change the NAICS Code from 237310 to 115310.

3. Provide response(s) to Vendor Inquiries (Q&A - 3).

4. Removal of solicitation language in the following sections: Statement of Work:

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

SONYA R. JONES

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

Previous edition unusable

(5) Prosecution of Work (f)

(11) Physical Data (a)

There are no other changes.

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

Solicitation 12363N24Q4195

R1: Custer-Gallatin NF/ Beartooth Ranger District Road Maintenance

Questions & Answers (3):

Question 1:

I am looking for and thus far unable to find compaction requirements. Are there any?

Answer:

Compaction for Grading is found on page 29 of the CGNF Maintenance Specifications under Grading under Section 2 Maintenance Requirements under Subsection 7. c. Compaction “Unless otherwise specified, all traveled ways requiring compaction shall be compacted by breaking track while operating equipment on the traveled way”.

Compaction for spot surfacing is found in the CGNF RD Maintenance Specifications under Spot Surfacing Section under Item 4 Mixing and Placing subsection b. page 36. “Compaction of the surfacing shall be accomplished by breaking track while operating haul and spreading equipment over the full width of each layer”.

Question 2:

Question 2:

Can you please verify the magnitude of construction for this pursuit?

Answer:

• This requirement is for a service. There is no magnitude of construction to be provided for this solicitation.