This solicitation is for forestry and logging services to implement a large-scale landscape treatment project on the Stanislaus National Forest. Services required include resource surveys, layout and marking of treatment areas, timber cruising, thinning, piling, mastication, road reconstruction, and product removal. Estimated quantities and unit pricing are provided for mandatory and optional work items across three treatment areas. Offerors must provide separate technical and price proposals, with pricing on all items in the schedules. The closing date for proposals is September 1st, 2023. Award will be made for the base work activities and optional items in order of priority as determined by the Contracting Officer. The period of performance is from date of award through November 30, 2029.

View the file

Other files

File Type Posted
A004 SF30 Seral G-Z.pdf PDF
A004 Attachment 9 Road Design References Mtc. Specs_Revised.pdf PDF
A004 SERALG-Z_Treatment3Map_DRAFT_202300828.pdf PDF
A004 12363NQ234169 Seral G-Z IRSC Solicitation.pdf PDF
A004 SERALG-Z_Treatment1Map_DRAFT_20230828.pdf PDF
A004 SERALG-Z_Treatment2Map_DRAFT_20230828.pdf PDF
A003 12363NQ234169 Seral G-Z IRSC Solicitation.pdf PDF
A003 SF30 Seral G-Z.pdf PDF
A002 SF30 Seral G-Z.pdf PDF
SERAL G-Z Pre Bid Tour Notes.pdf PDF
24. A001 SF30 Seral G-Z.pdf PDF
25. A001 SERALG-Z_SolictationDistribute.gdb.zip ZIP file
15. Attachment 3 - SERAL_FEIS_2022Feb.pdf PDF
8. Seral G-Z Contract Area Map Treatment 1.pdf PDF
21. Attachment 9 - Road Design References +R5 Rd Mtc. Specs.pdf PDF
3. Seral G-Z AppendixB_TreatmentArea1.pdf PDF
22. Industry Questions and Answers to the G-Z IRSC Model.pdf PDF
14. Attachment 2 - FSH & FSM.zip ZIP file
7. Seral G-Z Vicinity Map.pdf PDF
23. Seral G-Z presolicitation Q&As.pdf PDF
4. Seral G-Z AppendixB_TreatmentArea2.pdf PDF
20. Attachment 8 - Cultural Resource Contractor Standards.pdf PDF
1. 12363N23Q4169 Seral G-Z IRSC Solicitation.pdf PDF
19. Attachment 7 - Botany.gdb.zip ZIP file
9. Seral G-Z Contract Area Map Treatment 2.pdf PDF
12. DBWageRates CA20230018Mod0006.pdf PDF
18. Attachment 6 - Botany References.pdf PDF
2. Seral G-Z Appendix A Tech Specifications.pdf PDF
11. ServiceContractWD#1977-0727vs71.pdf PDF
6. Seral G-Z Appendix C Road Maintenance.pdf PDF
17. Attachment 5 - C-2 Specifications for Cadastral Surveys.pdf PDF
16. Attachment 4 -Treatment Prescriptions.zip ZIP file
13. Attachment 1 - CSE Reference.pdf PDF
5. Seral G-Z_AppendixB_TreatmentArea3.pdf PDF
10. Seral G-Z Contract Area Map Treatment 3.pdf PDF
Show all 35

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL PRODUCTS AND

SERVICES - OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30

1. REQUISITION NUMBER PAGE 1 OF

1103218 106

2. CONTRACT NO. 3. AWARD/EFFECTIVE

DATE

4. ORDER NUMBER 5. SOLICITATION NUMBER 6. SOLICIATION ISSUE

DATE

12363N23Q4169 July 25, 2023

7. FOR SOLICITATION

INFORMATION CALL:

Email Contact Preferred

a. NAME b. TELEPHONE NUMBER(No collect calls) 8. OFFER DUE DATE / LOCAL TIME

Mark T. Phillipp Mark.Phillipp@usda.gov (541) 487-1187 September 1st, 2023 4:00 p.m. PT

9. ISSUED BY CODE 363N 10. THIS ACQUISITON IS UNRESTRICTED OR SET ASIDE % FOR:

USDA-FS – Procurement & Property Services

National Procurement Operations

Stewardship Contracting Branch

Mark.Phillipp@usda.gov

Kasandra.Meyer@usda.gov

SMALL BUSINESS

WOMEN-OWNED SMALL BUSINESS

(WOSB) ELIGIBLE UNDER THE WOMAN-

OWNED SMALL BUSINESS PROGRAM

EDWOSB

NAICS:

HUBZONE SMALL BUSINESS 115310

SERVICE-DISABLED VETERAN-

OWNED SMALL BUSINESS 8(A)

SIZE STANDARD:

34 M

11. DELIVERY FOR FOB DESTINATION

UNLESS BLOCK IS MARKED

SEE SCHEDULE

12. DISCOUNT TERMS

13a. THIS CONTRACT IS A RATED

ORDER UNDER DPAS (15 CFR 700)

13b. Rating

14. METHOD OF SOLICITATION

RFQ IFB RFP

15. DELIVER TO CODE 363N 16. ADMINISTERED BY CODE 363N

Stanislaus National Forest

Summit Ranger District

1 Pinecrest Lake Rd

Pinecrest, CA 95364

USDA-FS – Procurement & Property Services

National Procurement Operations

Stewardship Contracting Branch

1400 Independence Ave. SW, MS-1138

Washington DC 20250-1138

17A. CONTRACTOR/OFFEROR CODE

FACILITY

CODE

18a. PAYMENT WILL BE MADE BY CODE 363N

Name:

Address:

Email:

Telephone No:

*Invoice Processing Platform (IPP):

All invoices must be submitted electronically through the Invoice Processing Platform via www.IPP.gov.

*All Invoices for Non-Monetary Credits must be submitted to the Forest COR via email.* SAM UEI (12 characters):

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN OFFER

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK

BELOW IS CHECKED

SEE ADDENDUM

19. 20. 21. 22. 23. 24.

ITEM N0. SCHEDULE OF SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

SERAL G-Z STEWARDSHIP IRSC

STANISLAUS NATIONAL FOREST

SUMMIT RANGER DISTRICT

REGION 5 - CALIFORNIA

See attached Schedule of items

(Use Reverse and/or Attach Additional Sheets as Necessary)

25. ACCOUNTING AND APPROPRIATION DATA

26. TOTAL AWARD AMOUNT (For Govt. Use Only)

27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1, 52.212-4. FAR 52.212-3 AND 52.212-5 ARE ATTACHED.

ADDENDA

ARE ARE NOT ATTACHED

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN 1 COPY TO

Mark.Phillipp@usda.gov and Kasandra.Meyer@usda.gov

29. AWARD OF CONTRACT: REF__________________

ONE (1) COPY TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND DELIVER

OFFER DATED________________, YOUR OFFER ON SOLICITATION

____________________________ (BLOCK 5), INCLUDING ANY ADDITIONS OR

ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY CHANGES WHICH ARE SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:

ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED __________________________________________________________________

30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)

30b. NAME AND TITLE OF SIGNER (Type or print) 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER (Type or print) 31c. DATE SIGNED

AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 1449 (REV.2/2012)

PREVIOUS EDITION IS NOT USABLE Prescribed by GSA - FAR (48 CFR) 53.212 mailto:Mark.Phillipp@usda.gov mailto:Kasandra.Meyer@usda.gov http://www.ipp.gov/ mailto:Kasandra.Meyer@usda.gov

Seral G-Z Stewardship IRSC Stanislaus National Forest

Page 2 of 111 Summit Ranger District

AMENDMENT 002

Revised 10.13.2022

GENERAL INFORMATION:

Proposals shall be valid for 60 days after the date of receipt for the solicitation. If additional time is needed, an extension will be requested. Refer to Section 50 for instructions on preparing your proposal and pricing. Submit technical proposals and price proposals separately, via email, to the individual(s) shown in box 28 of page 1.

All Contractors must be actively registered in the System for Award Management (SAM) https://SAM.gov to be eligible for award under this solicitation. Registration in SAM is a free service – you do not need to pay to register in this system. If your registration is not active, you will not be considered for award.

SCHEDULE OF ITEMS

MANDATORY WORK ACTIVITIES:

ITEM

NO.

DESCRIPTION OF

MANDATORY WORK ACTIVITIES

UNIT

ESTIMATED

QUANTITY

UNIT

PRICE

TOTAL

1 Common Stand Exam (CSE) Surveys Plot 1,750 $ $

2 Landline Re-Posting/Marking Mile 18.73 $ $

3 Landline Survey & Posting/Marking Mile 5.89 $ $

4 Botany Survey and Flagging

(a) Field Survey Analysis/Plan, and

Survey Acre 11,412 $ $

(b) Flag & GPS Feet 1,084,140* $ $

5 Flag Known Cultural Sites Acre 1,050 $ $

6 Road Reconstruction Survey & Plan

(a) Treatment Area 1

(Sourgrass/Dry Meadow) Mile 43.6 $ $

(b) Treatment Area 2

(Bull Creek/Beardsley/Pedro Flat) Mile 32.9 $ $

(c) Treatment Area 3

(Campoodle/Smoothwire) Mile 29.1 $ $

7 Harvest Unit Layout, Boundary Marking, and Cruising

Acre 2,092 $ $

Acre 3,260 $ $

Acre 2,818 $ $

8 Hand Thin/Hand Pile

Acre 196 $ $ https://sam.gov/

Page 3 of 111 Summit Ranger District

Acre 322 $ $

Acre 105 $ $

(d) Treatment within Cultural Sites

(All Areas) Acre 112 $ $

9 Fuelbreak Mastication/Machine Pile

Acre 636 $ $

Acre 622 $ $

Acre 577 $ $

10 Mastication

Acre 958 $ $

Acre 592 $ $

Acre 289 $ $

Total All Mandatory Service Items $

OPTIONAL WORK ACTIVITIES:

ITEM

NO.

DESCRIPTION OF

OPTIONAL WORK ACTIVITIES

UNIT

ESTIMATED

QUANTITY

UNIT

PRICE

TOTAL

Treatment Area 1 (Sourgrass/Dry Meadow)

11 Road Reconstruction

(a) Mobilization Lump Sum

2* $

(b) Construction survey and staking, method I, tolerance B

Lump

(c) Clearing and grubbing, disposal method: limbs g, logs l, stumps f Mile 30.0* $

(d) Removal of culverts, disposal method a, compaction method 5 Each 1* $

(e) Roadway excavation and embankment, compaction placement method 2, tolerance class B

Cubic Yard

375* $

Page 4 of 111 Summit Ranger District

(f) Embankment construction, compaction placement method 2, tolerance class A

Cubic

(g) Drainage excavation, type Armored Dip, compaction placement method 2, tolerance class A

Each 2* $

(h) Drainage excavation, type Roadside Ditch, compaction placement method 2, tolerance class A

Foot 1,385* $

(i) Drainage excavation, type Rocked Swale, compaction placement

(j) Drainage excavation, type Swale, tolerance class A

Each 4*

(k) Drainage excavation, type Rolling

Each 27*

(l) Drainage excavation, type Water Bar, Driveable, compaction placement method 2, tolerance class A

Each 15* $

(m) Drainage excavation, type Lead Off

Each 4* $

(n) Drainage excavation, type Armored Low Water Crossing, compaction placement method 2, tolerance

Each 1*

(o) Linear Grading Mile 2.2*

(p) Aggregate Base, Grading C, Compaction Method C Ton 619*

(q) Subbase, grading, compaction method C Ton 24*

(r) Aggregate surface course, grading

H, compaction method C Ton 129*

(s) Ditch Reconditioning Linear Foot

8,778* $

(t) Roadbed reconditioning, compaction method 2 Mile 6.4* $

Page 5 of 111 Summit Ranger District

(u) Roadway reconditioning, Mile 4.0* $

(v) Full depth reclamation, 2 inch depth, 1 inch minus, compaction

Mile 0.3* $

(w) Aphalt Concrete, California State

DOT, 1/2 in. Type A HMA, PG 64-16 Ton 44* $

(x) Asphalt Concrete Pavement

Patching, Type 1

Square

38* $

(y) Asphalt Concrete Pavement

Patching, Type 2

Square

22* $

(z) 18 inch pipe culvert, round steel, 0.064" thick with 2 2/3" x 1/2" corrugations, compaction placement method 6

Foot 20* $

(aa) 24 inch pipe culvert, round steel, corrugations, compaction

Foot 20*

(bb) 36 inch pipe culvert, round steel, 0.064" thick with 2 2/3" x 1/2" corrugations, compaction

Foot 20*

(cc) 48 inch pipe culvert, round steel, 0.079" thick with 2 2/3" x 1/2" corrugations, compaction

(dd) 60 inch pipe culvert, round steel, 0.079" thick with 3" x 1" corrugations, compaction

(ee) 72 inch pipe culvert, round steel, 0.109" thick with 3" x 1" corrugations, compaction

(ff) 18" Flared End Section Each 1* $

(gg) 24" Flared End Section Each 1* $

Page 6 of 111 Summit Ranger District

(hh) 36" Flared End Section Each 1* $

(ii) 48" Flared End Section Each 1* $

(jj) 60" Flared End Section Each 1* $

(kk) 72" Flared End Section Each 1* $

(ll) Inlet top, type 36" DI Lid Each 1* $

(mm) Metal Spillway, galv. sheet steel, 0.064" thick

(nn) Cleaning culverts in place Each 9* $

(oo) Enlarge catch basin Each 1* $

(pp) Gate steel tube, 16 ft Each 1* $

(qq) Gate, Powder River or equivalent

(rr) Cattle guard relocation Each 1* $

(ss) Earth and log berm Each 4* $

(tt) Erosion control blanket, open weave textile, type 3B

Square

44* $

(uu) Separation and stabilization geotextile, Class 2 Nonwoven

Square

200*

(vv) Roadside Hazardous Fuels

Mitigation – Felling of dead standing fuels (Assume 90 trees per mile and a QMD of 25”)

Mile 25.4* $

Page 7 of 111 Summit Ranger District

12 Timber/Product Removal

(a) Cut and Remove Included

Timber

Acre 2,092 N/A N/A

(b) Cut, Skid and Deck Non-Saw Timber

(i) 3.00-5.99* ccf/acre

Acre 2,092*

(ii) 6.00-8.99* ccf/acre

Acre 2,092*

(iii) 9.00-11.99* ccf/acre Acre 2,092* $ $

13 Hauling of Non-Saw Timber Ton 48,900** $ $

Item 13 will be awarded as a capped tonnage for payment. Pricing data is required to verify product is deficit. Unit Price per Ton above should reflect Removal Cost minus Delivered Value.

Removal Cost (loading/chipping and trucking): $______/ton

Delivered Value: $_______/ton

14 Transport of Surplus/Excess Products Ton N/A N/A N/A

Treatment Area 2 (Bull Creek/Beardsley/Pedro Flat)

15 Road Reconstruction

a) Mobilization

Lump Sum

3* $ $

b) Construction survey and staking, method I, tolerance B

Lump Sum

3* $ $

c) Clearing and grubbing, disposal method: limbs g, logs l, stumps f

Mile 22.4* $ $

d) Removal of culverts, disposal method a, compaction method (5)

Each 1* $ $

e) Roadway excavation and embankment, compaction placement method 2, tolerance class B

Cubic

280* $ $

f) Embankment construction, tolerance class A

Cubic Yard

2* $ $

g) Drainage excavation, type Armored Dip, compaction placement method

Each 2* $ $

Page 8 of 111 Summit Ranger District

h) Drainage excavation, type Roadside Ditch, compaction placement method 2, tolerance class A

Foot 1,035* $ $

i) Drainage excavation, type Rocked Swale, compaction placement method 2, tolerance class A

Each 1* $ $

j) Drainage excavation, type Swale, compaction placement method 2, tolerance class A

Each 3* $ $

k) Drainage excavation, type Rolling Dip, compaction placement method 2, tolerance class A

Each 20* $ $

l) Drainage excavation, type Water Bar, Driveable, compaction placement method 2, tolerance

Each 11* $ $

m) Drainage excavation, type Lead Off method 2, tolerance class A

Each 3* $ $

n) Drainage excavation, type Armored Low Water Crossing, compaction placement method 2, tolerance class A

Each 1* $ $

o) Linear Grading Mile 1.6* $ $

p) Aggregate Base, Grading C, Compaction Method (c)

Ton 463* $ $

q) Subbase, grading (), compaction method (c)

Ton 18* $ $

r) Aggregate surface course, grading

Ton 96* $ $

s) Ditch Reconditioning

Linear Foot

6,557* $ $

t) Roadbed reconditioning, compaction method 2

Mile 4.8* $ $

u) Roadway reconditioning, compaction method 2

Mile 3.0* $ $

v) Full depth reclamation, 2 inch depth, 1 inch minus, compaction method C

Mile 0.2* $ $

w) Aphalt Concrete, California State

Ton 33* $ $

Page 9 of 111 Summit Ranger District

x) Asphalt Concrete Pavement

Square

Yard 28* $ $

y) Asphalt Concrete Pavement Patching, Type 2

Square Yard

17* $ $

z) 18 inch pipe culvert, round steel, 0.064" thick with 2 2/3" x 1/2" corrugations, compaction placement method 6

Foot 20* $ $

aa) 24 inch pipe culvert, round steel, 0.064" thick with 2 2/3" x 1/2" corrugations, compaction placement method (6)

Foot 20* $ $

bb) 36 inch pipe culvert, (round steel), 0.064" thick with 2 2/3" x 1/2" corrugations, compaction placement method (6)

Foot 20* $ $

cc) 48 inch pipe culvert, round steel, 0.079" thick with 2 2/3" x 1/2" corrugations, compaction placement method (6)

Foot 20* $ $

dd) 60 inch pipe culvert, round steel, 0.079" thick with 3" x 1" corrugations, compaction placement method (6)

Foot 20* $ $

ee) 72 inch pipe culvert, round steel, 0.109" thick with 3" x 1" corrugations, compaction placement method (6)

Foot 20* $ $

ff) 18" Flared End Section Each 1* $ $

gg) 24" Flared End Section Each 1* $ $

hh) 36" Flared End Section Each 1* $ $

ii) 48" Flared End Section Each 1* $ $

jj) 60" Flared End Section Each 1* $ $

kk) 72" Flared End Section Each 1* $ $

ll) Inlet top, type 36" DI Lid Each 1* $ $

Page 10 of 111 Summit Ranger District

mm) Metal Spillway, galv. sheet

Each 1* $ $

nn) Cleaning culverts in place Each 7* $ $

oo) Enlarge catch basin Each 1* $ $

pp) Gate steel tube, 16 ft Each 1* $ $

qq) Gate, Powder River or equivalent Each 1* $ $

rr) Cattle guard relocation Each 1* $ $

ss) Earth and log berm Each 3* $ $

tt) Erosion control blanket, open weave textile, type 3B

Square Yard

33* $ $

uu) Separation and stabilization geotextile, Class 2 Nonwoven

Square Yard

149* $ $

vv) Roadside Hazardous Fuels

Mitigation – Felling of dead standing fuels (Assume 90 trees per mile and a QMD of 25”)

Mile 34.3* $ $

16 Timber/Product Removal

(a) Cut and Remove Included

Timber

Acre 3,262 N/A N/A

Acre 3,262*

Acre 3,262*

(iii) 9.00-11.99* ccf/acre Acre 3,262* $ $

17 Hauling of Non-Saw Timber Ton 76,200** $ $

Item 17 will be awarded as a capped tonnage for payment. Pricing data is required to verify product is deficit. Unit Price per Ton above should reflect Removal Cost minus Delivered Value.

18 Transport of Surplus/Excess Products Ton N/A N/A N/A

Page 11 of 111 Summit Ranger District

Treatment Area 3 (Campoodle/Smoothwire)

19 Road Reconstruction

a) Mobilization Lump

2* $ $

b) Construction survey and staking, method I, tolerance B

Lump

2* $ $

c) Clearing and grubbing, disposal method: limbs g, logs l, stumps f Mile 19.8* $ $

d) Removal of culverts, disposal method a, compaction method (5)

e) Roadway excavation and embankment, compaction placement method 2, tolerance class B

Cubic

248* $ $

f) Embankment construction, tolerance class A

Cubic

1* $ $

g) Drainage excavation, type Armored

h) Drainage excavation, type Roadside

Foot 915* $ $

i) Drainage excavation, type Rocked Swale, compaction placement

j) Drainage excavation, type Swale, tolerance class A

Each 2* $ $

k) Drainage excavation, type Rolling

Each 18* $ $

l) Drainage excavation, type Water Bar, Driveable, compaction placement method 2, tolerance

Each 10* $ $

m) Drainage excavation, type Lead Off

Each 3* $ $

n) Drainage excavation, type Armored Low Water Crossing, compaction placement method 2, tolerance class A

o) Linear Grading Mile 1.5* $ $

Page 12 of 111 Summit Ranger District

p) Aggregate Base, Grading C, Compaction Method (c) Ton 409* $ $

q) Subbase, grading (), compaction method (c) Ton 16* $ $

r) Aggregate surface course, grading

Ton 85* $ $

s) Ditch Reconditioning Linear Foot

5,800* $ $

t) Roadbed reconditioning, Mile 4.3* $ $

u) Roadway reconditioning, Mile 2.6* $ $

v) Full depth reclamation, 2 inch depth, 1 inch minus, compaction

Mile 0.2* $ $

w) Aphalt Concrete, California State

Ton 29* $ $

x) Asphalt Concrete Pavement

Square

25* $ $

y) Asphalt Concrete Pavement

Patching, Type 2

Square

15* $ $

z) 18 inch pipe culvert, round steel, corrugations, compaction

aa) 24 inch pipe culvert, round steel, corrugations, compaction

bb) 36 inch pipe culvert, (round steel), corrugations, compaction

cc) 48 inch pipe culvert, round steel, 0.079" thick with 2 2/3" x 1/2" corrugations, compaction

dd) 60 inch pipe culvert, round steel, 0.079" thick with 3" x 1" corrugations, compaction

ee) 72 inch pipe culvert, round steel, 0.109" thick with 3" x 1" corrugations, compaction

Page 13 of 111 Summit Ranger District

ff) 18" Flared End Section Each 1* $ $

gg) 24" Flared End Section Each 1* $ $

hh) 36" Flared End Section Each 1* $ $

ii) 48" Flared End Section Each 1* $ $

jj) 60" Flared End Section Each 1* $ $

kk) 72" Flared End Section Each 1* $ $

ll) Inlet top, type 36" DI Lid Each 1* $ $

mm) Metal Spillway, galv. sheet

Each 1* $ $

nn) Cleaning culverts in place Each 6* $ $

oo) Enlarge catch basin Each 1* $ $

pp) Gate steel tube, 16 ft Each 1* $ $

qq) Gate, Powder River or equivalent Each 1* $ $

rr) Cattle guard relocation Each 1* $ $

ss) Earth and log berm Each 2* $ $

tt) Erosion control blanket, open weave textile, type 3B

Square

29* $ $

uu) Separation and stabilization geotextile, Class 2 Nonwoven

Square

132* $ $

vv) Roadside Hazardous Fuels

Mitigation – Felling of dead standing fuels (Assume 90 trees per mile and a QMD of 25”)

Mile 25.2* $ $

20 Timber/Product Removal

(a) Cut and Remove Included

Timber

Acre 2,818 N/A N/A

Acre 2,818*

Acre 2,818*

(iii) 9.00-11.99* ccf/acre

Acre 2,818*

21 Hauling of Non-Saw Timber Ton 65,900** $ $

Page 14 of 111 Summit Ranger District

Item 21 will be awarded as a capped tonnage for payment. Pricing data is required to verify product is deficit. Unit Price per Ton above should reflect Removal Cost minus Delivered Value.

22 Transport of Surplus/Excess Products Ton N/A N/A N/A

Total All Optional Service Items $

TIMBER/PRODUCT REMOVAL PRICE SCHEDULE:

SPECIES PRODUCT QUANTITY

UNIT OF

MEASURE

MINIMUM

ACCEPTABLE

OFFER

Timber Treatment Area 1 - Sourgrass/Dry Meadow

CS Saw Actual Quantity determined

After Cruise

43,400*** Tons

TBD from Appraisal

$0.25 – 10.00***

CS Non-saw 48,900** Tons $0.01

Total Value Bid Premium – All Products Treatment Area 1**** $

Total Value – All Products Treatment Area 1 (TBD after cruise and appraisal)

N/A – TBD

Will be calculated by FS for evaluation purposes.

Timber Treatment Area 2 - Bull Creek/Beardsley/Pedro Flat

Page 15 of 111 Summit Ranger District

Enter delivered saw log value (paid by mill) to be used in determining appraised timber rates:

Product:_______________ Delivered Value: $_________/ton Location:___________

Product:_______________ Delivered Value: $_________/ton Location:___________

Product:_______________ Delivered Value: $_________/ton Location:___________

Product:_______________ Delivered Value: $_________/ton Location:___________

Firms are required to provide delivered market value prices for products planned to be delivered and to which facilities. This information provided will be used (kept internally to protect proprietary information), coupled with the variable logging cost entries obtained from logging plans produced by the contractor will be used to determine the final timber rates per Timber Treatment Area. This will not be used for evaluation purposes.

Notes: These schedules are for pricing/payment purposes. See Instructions to Offerors for business proposal requirements. Unit prices prevail. Price Proposals MUST be provided on ALL Items in

Schedules: Mandatory Work, Optional Work and Total Value Bid Premium for all Timber Products for each Treatment Area, except for Optional Item 14, 18 and 22. These Items may be negotiated and

CS Saw Actual Quantity determined

After Cruise

82,200*** Tons

TBD from Appraisal

$0.25 – 10.00***

CS Non-saw 76,200** Tons $0.01

Total Value Bid Premium – All Products Treatment Area 2**** $

Total Value – All Products Treatment Area 2 (TBD after cruise and appraisal)

N/A – TBD

Will be calculated by FS for evaluation purposes.

Timber Treatment Area 3 - Campoodle/Smoothwire

CS Saw Actual Quantity determined

After Cruise

71,000*** Tons

TBD from Appraisal

$0.25 – $10.00***

CS Non-saw 65,900** Tons $0.01

Total Value Bid Premium – All Products Treatment Area 3**** $

Total Value – All Products Treatment Area 3 (TBD after cruise and appraisal)

N/A – TBD

Will be calculated by FS for evaluation purposes.

Page 16 of 111 Summit Ranger District populated via modification if product is found to be in surplus. Option Item 14, 18 and 22 allows contractors to market surplus wood products outside the local area.

Contractors are required to submit a primary proposal for all work as shown in the SOI on 4

Treatment Areas. Contractors proposing to complete work in less than 4 Treatment Areas or that have an alternative plan must submit a second Alternative price proposal and Alternative technical proposal.

*Total quantities are unknown and shown as estimated gross quantity. Completion and acceptance of

Item 4a will determine true needed quantities for Item 4b, and completion of Items 6a-c, and 7a-c will determine true needed quantities for all other Items. The use of “Stepladder Pricing” enables the

Government to establish Firm-Fixed Pricing at time of award for all Items based on differing complexity. Contractor shall provide a fixed price per Item based on the estimated quantity shown and the complexity level as described in Appendix A. Awarded Firm-Fixed unit prices prevail and

WILL NOT be renegotiated or changed in future modifications to adjust quantities once known.

**Total tons of non-saw products awarded to be removed shall be negotiated and populated via modification after cruise is completed for each Timber Treatment Area. Awards made for non-saw product removal will be set as a capped tonnage for payment per Treatment Area.

***The gross acres of commercial sawtimber for each Treatment area were determined using GIS.

Gross sawtimber volume was calculated assuming 4.0 MBF/acre. Gross sawtimber volume for each

Treatment Area is for evaluation purposes. Final commercial timber acres may be more or less than the estimated amount per Treatment Area based on contractor proposals for number of Timber

Treatment areas (1 area up to the 3 areas as shown in the Schedule of Items).

Advertised timber rates, specific to economically viable (non-deficit) sawtimber, from the past three years for sawtimber on the Stanislaus National Forest have a range of $0.25 – $10.00/ton. When Final

Cruise for each Timber Treatment Area has been completed and accepted, the FS will complete an independent Timber Sale Appraisal to determine the Advertised Timber Rate and Bid Premiums to be collected. Harvest Layout Cards once accepted from Item 7 WILL be used for appraisal data entries to calculate logging costs. Commercial material will not be removed from Service Only areas, unless proposed by the Contractor as Timber Subject to Agreement. Low volume/value/quality treatment units should not be analyzed as commercial timber removal units, these should be proposed as service only units.

****Contractors shall provide a Total Value Bid Premium for all products per treatment area

≥$0.00. The Total Value Bid Premium for each Treatment Area will be distributed evenly over all final awarded products (non-saw and saw timber) per treatment area to have one combined rate for all products per Treatment Area. This will allow maximum flexibility to contractors in marketing all products. To reduce risk to both parties due to over/under-run of products, cruising standards have been increased to “Tree Measurement” maximum allowed error. Timber products will be scaled due to the use of Designation by Prescription.

Page 17 of 111 Summit Ranger District

If the final appraised Timber Rate for Saw timber are between $0.25/ton and $10.00/ton, Total Value

Bid Premiums shall be binding and applied in full. If appraised timber rate is greater than

$10.00/ton, Bid Premiums shall be lowered incrementally until not applicable. Appraised Timber

Rates below $0.25/ton, potentially indicating deficit conditions, will either prompt reassessment of treatment units (move uneconomical unit acres from Timber Removal Item to Service only treatment) for that Treatment Area to bring appraised Rates above $0.25 or Bid Premiums will be waived.

For evaluation of price proposals, FS will calculate the Total Value of all products per Treatment

Area based on the assumptions shown in the Timber Removal Price Schedule and the Total Value

Bid Premium offer. The following calculation will be used for both evaluation of proposals as well as when determining final single timber rate per Treatment Area:

[(Saw Volume * Saw Minimum Rate) + (Non-saw volume * $0.01) + Total Value Bid Premium] = Total Value of all products

(Saw Volume + Non-saw Volume)

Bid Guarantee is not required for the Re-construction Items.

Payment and Performance Bonds are required for Re-construction greater than $150,000.00. See

FAR 52.228-15 Performance and Payment Bonds -- Construction (JUN 2020) (DEVIATION APR

2020) and FAR 52.228-1 Bid Guarantee (SEP 1996) (DEVIATION MAY 2020). Payment and

Performance Bonds are required 10 days after the optional re-construction items are awarded. Not at time of contract award.

The estimated average culvert length is 20’ and contractor shall provide culverts as part of their bid if replacement is required and awarded.

A Site Visit has been scheduled for Wednesday, August 2nd, 2023, with a meeting time of 9:00 AM

PT, at the Summit Ranger Station in Pinecrest, CA.

PERIOD OF PERFORMANCE IS FROM DATE OF AWARD THROUGH NOVEMBER 30, 2029

LAND MANAGEMENT ACTIVITIES.

Performance of land management activities shall be in accordance with Project Description and Work

Specifications. Payment for Land Management Work Activities in Schedule of Items will be made in

Stewardship Credits and Appropriated Funds.

All Base Work Activities (Mandatory) shall be performed. Optional activities are listed in order of planned priority. Award may be made for optional items in any order that the Contracting Officer determines is in the best interest of the Government.

Page 18 of 111 Summit Ranger District

1. FAR 52.212-4 CONTRACT TERMS AND CONDITIONS - COMMERCIAL PRODUCTS AND

COMMERCIAL SERVICES (NOV 2021)

(a) Inspection/Acceptance. The Contractor shall only tender for acceptance those items that conform to the requirements of this contract. The Government reserves the right to inspect or test any supplies or services that have been tendered for acceptance. The Government may require repair or replacement of nonconforming supplies or reperformance of nonconforming services at no increase in contract price. If repair/replacement or reperformance will not correct the defects or is not possible, the Government may seek an equitable price reduction or adequate consideration for acceptance of nonconforming supplies or services. The Government must exercise its post-acceptance rights-

(1) Within a reasonable time after the defect was discovered or should have been discovered; and

(2) Before any substantial change occurs in the condition of the item, unless the change is due to the defect in the item.

(b) Assignment. The Contractor or its assignee may assign its rights to receive payment due as a result of performance of this contract to a bank, trust company, or other financing institution, including any Federal lending agency in accordance with the Assignment of Claims Act (31 U.S.C. 3727). However, when a third party makes payment (e.g., use of the Government wide commercial purchase card), the Contractor may not assign its rights to receive payment under this contract.

(c) Changes. Changes in the terms and conditions of this contract may be made only by written agreement of the parties.

(d) Disputes. This contract is subject to 41 U.S.C. chapter 71, Contract Disputes. Failure of the parties to this contract to reach agreement on any request for equitable adjustment, claim, appeal or action arising under or relating to this contract shall be a dispute to be resolved in accordance with the clause at Federal Acquisition

Regulation (FAR) 52.233-1, Disputes, which is incorporated herein by reference. The Contractor shall proceed diligently with performance of this contract, pending final resolution of any dispute arising under the contract.

(e) Definitions. The clause at FAR 52.202-1, Definitions, is incorporated herein by reference.

(f) Excusable delays. The Contractor shall be liable for default unless nonperformance is caused by an occurrence beyond the reasonable control of the Contractor and without its fault or negligence such as, acts of

God or the public enemy, acts of the Government in either its sovereign or contractual capacity, fires, floods, epidemics, quarantine restrictions, strikes, unusually severe weather, and delays of common carriers. The

Contractor shall notify the Contracting Officer in writing as soon as it is reasonably possible after the commencement of any excusable delay, setting forth the full particulars in connection therewith, shall remedy such occurrence with all reasonable dispatch, and shall promptly give written notice to the Contracting Officer of the cessation of such occurrence.

(g) Invoice. (Using IPP now) See #42.

(1) The Contractor shall submit an original invoice and three copies (or electronic invoice, if authorized) to the address designated in the contract to receive invoices. An invoice must include-

(i) Name and address of the Contractor;

(ii) Invoice date and number;

(iii) Contract number, line item number and, if applicable, the order number;

(iv) Description, quantity, unit of measure, unit price and extended price of the items delivered;

(v) Shipping number and date of shipment, including the bill of lading number and weight of shipment if shipped on Government bill of lading;

(vi) Terms of any discount for prompt payment offered;

(vii) Name and address of official to whom payment is to be sent;

http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.acquisition.gov/far/52.233-1#FAR_52_233_1 https://www.acquisition.gov/far/52.202-1#FAR_52_202_1

Page 19 of 111 Summit Ranger District

(viii) Name, title, and phone number of person to notify in event of defective invoice; and

(ix) Taxpayer Identification Number (TIN). The Contractor shall include its TIN on the invoice only if required elsewhere in this contract.

(x) Electronic funds transfer (EFT) banking information.

(A) The Contractor shall include EFT banking information on the invoice only if required elsewhere in this contract.

(B) If EFT banking information is not required to be on the invoice, in order for the invoice to be a proper invoice, the Contractor shall have submitted correct EFT banking information in accordance with the applicable solicitation provision, contract clause (e.g., 52.232-33, Payment by Electronic Funds Transfer-

System for Award Management, or 52.232-34, Payment by Electronic Funds Transfer-Other Than System for

Award Management), or applicable agency procedures.

(C) EFT banking information is not required if the Government waived the requirement to pay by EFT.

(2) Invoices will be handled in accordance with the Prompt Payment Act (31 U.S.C.3903) and Office of Management and Budget (OMB) prompt payment regulations at 5 CFR Part 1315.

(h) Patent indemnity. The Contractor shall indemnify the Government and its officers, employees and agents against liability, including costs, for actual or alleged direct or contributory infringement of, or inducement to infringe, any United States or foreign patent, trademark or copyright, arising out of the performance of this contract, provided the Contractor is reasonably notified of such claims and proceedings.

(i) Payment.-

(1) Items accepted. Payment shall be made for items accepted by the Government that have been delivered to the delivery destinations set forth in this contract.

(2) Prompt payment. The Government will make payment in accordance with the Prompt Payment Act

(31 U.S.C.3903) and prompt payment regulations at 5 CFR Part 1315.

(3) Electronic Funds Transfer (EFT). If the Government makes payment by EFT, see 52.212-5(b) for the appropriate EFT clause.

(4) Discount. In connection with any discount offered for early payment, time shall be computed from the date of the invoice. For the purpose of computing the discount earned, payment shall be considered to have been made on the date which appears on the payment check or the specified payment date if an electronic funds transfer payment is made.

(5) Overpayments. If the Contractor becomes aware of a duplicate contract financing or invoice payment or that the Government has otherwise overpaid on a contract financing or invoice payment, the

Contractor shall-

(i) Remit the overpayment amount to the payment office cited in the contract along with a description of the overpayment including the-

(A) Circumstances of the overpayment (e.g., duplicate payment, erroneous payment, liquidation errors, date(s) of overpayment);

(B) Affected contract number and delivery order number, if applicable;

(C) Affected line item or subline item, if applicable; and

(D) Contractor point of contact.

(ii) Provide a copy of the remittance and supporting documentation to the Contracting Officer.

(6) Interest.

(i) All amounts that become payable by the Contractor to the Government under this contract shall bear simple interest from the date due until paid unless paid within 30 days of becoming due. The interest rate shall be the interest rate established by the Secretary of the Treasury as provided in 41 U.S.C. 7109, which is https://www.acquisition.gov/far/52.232-33#FAR_52_232_33 https://www.acquisition.gov/far/52.232-34#FAR_52_232_34 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.acquisition.gov/far/52.212-5#FAR_52_212_5 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3

Page 20 of 111 Summit Ranger District applicable to the period in which the amount becomes due, as provided in (i)(6)(v) of this clause, and then at the rate applicable for each six-month period as fixed by the Secretary until the amount is paid.

(ii) The Government may issue a demand for payment to the Contractor upon finding a debt is due under the contract.

(iii) Final decisions. The Contracting Officer will issue a final decision as required by 33.211 if–

(A) The Contracting Officer and the Contractor are unable to reach agreement on the existence or amount of a debt within 30 days;

(B) The Contractor fails to liquidate a debt previously demanded by the Contracting Officer within the timeline specified in the demand for payment unless the amounts were not repaid because the

Contractor has requested an installment payment agreement; or

(C) The Contractor requests a deferment of collection on a debt previously demanded by the

Contracting Officer (see 32.607-2).

(iv) If a demand for payment was previously issued for the debt, the demand for payment included in the final decision shall identify the same due date as the original demand for payment.

(v) Amounts shall be due at the earliest of the following dates:

(A) The date fixed under this contract.

(B) The date of the first written demand for payment, including any demand for payment resulting from a default termination.

(vi) The interest charge shall be computed for the actual number of calendar days involved beginning on the due date and ending on-

(A) The date on which the designated office receives payment from the Contractor;

(B) The date of issuance of a Government check to the Contractor from which an amount otherwise payable has been withheld as a credit against the contract debt; or

(C) The date on which an amount withheld and applied to the contract debt would otherwise have become payable to the Contractor.

(vii) The interest charge made under this clause may be reduced under the procedures prescribed in

FAR 32.608-2 in effect on the date of this contract.

(j) Risk of loss. Unless the contract specifically provides otherwise, risk of loss or damage to the supplies provided under this contract shall remain with the Contractor until, and shall pass to the Government upon:

(1) Delivery of the supplies to a carrier, if transportation is f.o.b. origin; or

(2) Delivery of the supplies to the Government at the destination specified in the contract, if transportation is f.o.b. destination.

(k) Taxes. The contract price includes all applicable Federal, State, and local taxes and duties.

(l) Termination for the Government’s convenience. The Government reserves the right to terminate this contract, or any part hereof, for its sole convenience. In the event of such termination, the Contractor shall immediately stop all work hereunder and shall immediately cause any and all of its suppliers and subcontractors to cease work. Subject to the terms of this contract, the Contractor shall be paid a percentage of the contract price reflecting the percentage of the work performed prior to the notice of termination, plus reasonable charges the Contractor can demonstrate to the satisfaction of the Government using its standard record keeping system, have resulted from the termination. The Contractor shall not be required to comply with the cost accounting standards or contract cost principles for this purpose. This paragraph does not give the Government any right to audit the Contractor’s records. The Contractor shall not be paid for any work performed or costs incurred which reasonably could have been avoided.

(m) Termination for cause. The Government may terminate this contract, or any part hereof, for cause in the event of any default by the Contractor, or if the Contractor fails to comply with any contract terms and https://www.acquisition.gov/far/33.211#FAR_33_211 https://www.acquisition.gov/far/32.607-2#FAR_32_607_2 https://www.acquisition.gov/far/32.608-2#FAR_32_608_2

Page 21 of 111 Summit Ranger District conditions, or fails to provide the Government, upon request, with adequate assurances of future performance.

In the event of termination for cause, the Government shall not be liable to the Contractor for any amount for supplies or services not accepted, and the Contractor shall be liable to the Government for any and all rights and remedies provided by law. If it is determined that the Government improperly terminated this contract for default, such termination shall be deemed a termination for convenience.

(n) Title. Unless specified elsewhere in this contract, title to items furnished under this contract shall pass to the Government upon acceptance, regardless of when or where the Government takes physical possession.

(o) Warranty. The Contractor warrants and implies that the items delivered hereunder are merchantable and fit for use for the particular purpose described in this contract.

(p) Limitation of liability. Except as otherwise provided by an express warranty, the Contractor will not be liable to the Government for consequential damages resulting from any defect or deficiencies in accepted items.

(q) Other compliances. The Contractor shall comply with all applicable Federal, State and local laws, executive orders, rules and regulations applicable to its performance under this contract.

(r) Compliance with laws unique to Government contracts. The Contractor agrees to comply with 31

U.S.C. 1352 relating to limitations on the use of appropriated funds to influence certain Federal contracts; 18

U.S.C. 431 relating to officials not to benefit; 40 U.S.C. chapter 37, Contract Work Hours and Safety

Standards; 41 U.S.C. chapter 87, Kickbacks; 41 U.S.C. 4712 and 10 U.S.C. 2409 relating to whistleblower protections; 49 U.S.C. 40118, Fly American; and 41 U.S.C. chapter 21 relating to procurement integrity.

(s) Order of precedence. Any inconsistencies in this solicitation or contract shall be resolved by giving precedence in the following order:

(1) The schedule of supplies/services.

(2) The Assignments, Disputes, Payments, Invoice, Other Compliances, Compliance with Laws

Unique to Government Contracts, and Unauthorized Obligations paragraphs of this clause;

(3) The clause at 52.212-5.

(4) Addenda to this solicitation or contract, including any license agreements for computer software.

(5) Solicitation provisions if this is a solicitation.

(6) Other paragraphs of this clause.

(7) The Standard Form 1449.

(8) Other documents, exhibits, and attachments.

(9) The specification.

(t) [Reserved]

(u) Unauthorized Obligations.

(1) Except as stated in paragraph (u)(2) of this clause, when any supply or service acquired under this contract is subject to any End User License Agreement (EULA), Terms of Service (TOS), or similar legal instrument or agreement, that includes any clause requiring the Government to indemnify the Contractor or any person or entity for damages, costs, fees, or any other loss or liability that would create an Anti-Deficiency Act violation (31 U.S.C. 1341), the following shall govern:

(i) Any such clause is unenforceable against the Government.

(ii) Neither the Government nor any Government authorized end user shall be deemed to have agreed to such clause by virtue of it appearing in the EULA, TOS, or similar legal instrument or agreement. If the EULA, TOS, or similar legal instrument or agreement is invoked through an "I agree" click box or other comparable mechanism (e.g., "click-wrap" or "browse-wrap" agreements), execution does not bind the

Government or any Government authorized end user to such clause.

http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.acquisition.gov/far/52.212-5#FAR_52_212_5 https://www.gsa.gov/forms-library/solicitationcontractorder-commercial-items

Page 22 of 111 Summit Ranger District

(iii) Any such clause is deemed to be stricken from the EULA, TOS, or similar legal instrument or agreement.

(2) Paragraph (u)(1) of this clause does not apply to indemnification by the Government that is expressly authorized by statute and specifically authorized under applicable agency regulations and procedures.

(v) Incorporation by reference. The Contractor’s representations and certifications, including those completed electronically via the System for Award Management (SAM), are incorporated by reference into the contract.

ADDENDUM TO FAR 52.212-4 The following clauses are hereby incorporated by reference or full text as appropriate:

NUMBER TITLE DATE

52.219-9 SMALL BUSINESS SUBCONTRACTING PLAN OCT 2022

52.236-2 DIFFERING SITE CONDITIONS APR 1984

52.236-3 SITE INVESTIGATION AND CONDITIONS AFFECTING THE WORK APR 1984

52.236-5 MATERIAL AND WORKMANSHIP APR 1984

52.236-6 SUPERINTENDENCE BY THE CONTRACTOR APR 1984

52.236-7 PERMITS AND RESPONSIBILITIES NOV 1991

52.236-8 OTHER CONTRACTS APR 1984

52.236-9 PROTECTION OF EXISTING VEGETATION, STRUCTURES, EQUIPMENT, UTILITIES, AND IMPROVEMENT S APR 1984

52.236-10 OPERATIONS AND STORAGE AREAS APR 1984

52.236-11 USE AND POSSESSION PRIOR TO COMPLETION APR 1984

52.236-12 CLEANING UP APR 1984

52.236-13 ACCIDENT PREVENTION (ALTERNATE I) NOV 1991

52.236-17 LAYOUT OF WORK APR 1984

52.236-21 SPECIFICATIONS AND DRAWINGS FOR CONSTRUCTION FEB 1997

52.236-26 PRECONSTRUCTION CONFERENCE FEB 1995

52.242-14 SUSPENSION OF WORK APR 1984

52.245-1 GOVERNMENT PROPERTY SEP 2021

52.246-12 INSPECTION OF CONSTRUCTION AUG 1996

452.236-71 PROHIBITION AGAINST THE USE OF LEAD-PAINT NOV 1996

452.236-73 ARCHEOLOGICAL OR HISTORIC SITES FEB 1988

452.236-76 SAMPLES AND CERTIFICATES FEB 1988

2. FAR 52.217-7 – Option for Increased Quantity – Separately Priced Line Item

The Government may require the delivery of the numbered line item, identified in the Schedule as an option item, in the quantity and at the price stated in the Schedule. The Contracting Officer may exercise the option by written notice to the Contractor within the period of performance prior to contract expiration. Delivery of added items shall continue at the same rate that like items are called for under the contract, unless the parties otherwise agree.

Page 23 of 111 Summit Ranger District

3. PROJECT DESCRIPTION

(a) Description of Work- The intent of the project is to dramatically increase the pace and scale of forest restoration treatment to mitigate risk of catastrophic wildfire. The project will obtain forestry and logging related services to implement a large-scale landscape treatment. The objective of this project is for the contractor to complete the end-results from planned treatment handoff through final completion of the project including removal of forest products and other on-the-ground service work. Contractor shall complete required resource survey work in each treatment area prior to completing on-the-ground timber/product removal and service work. After the initial resource survey marking and flagging has been accepted and approved, contractors will then layout and mark boundaries for timber/product removal, including marking of designated openings, and complete timber cruises for each treatment area. Upon acceptance and approval of layout and timber cruising Forest Service will appraise included sawtimber to determine contractors bid premium for included timber/product prior to exercising the optional item for on-the-ground timber/product removal.

(b) Resulting Contract – Any resultant contract will be a commercial services contract with requirements for timber removal.

(c) Project Location- T4N, R16E, Sec 23-13. T4N, R17E, Sec 1-18 & 19-20. T4N, R18E, Sec 4-9 &

17-19. T5N, R17E, Sec 1-3, 10-15, 22-27, & 32-35. T5N, R18E, Sec 18-21 & 28-33. MDBM.

4. SPECIFICATIONS

General specifications for each Contract Activity individually described by an item number in the Schedule of

Service Items can be found in Appendix A. Specifications for timber removal can be found in Appendix B and associated road plans and specifications in Appendix C for Stewardship related projects. Incidental construction or reconstruction specified road work plans, drawings, exhibits, and specifications can be found in Appendix D.

5. CONTRACTOR QUALITY CONTROL INSPECTION SYSTEM

The Contractor shall identify the quality control inspection system it will use to ensure that contract specifications will be achieved. At no time shall the contractor rely upon Government inspections to provide notification of unsatisfactory performance. The Contractor shall produce written inspection records in a format and at times and places satisfactory to the Contracting Officer. Inspection records shall be made available upon request of the Contracting Officer and be maintained until the date of contract closure. The Contracting Officer may observe the Contractor's inspection at any time and shall otherwise have unlimited access to the inspection data.

6. ACCEPTANCE

The Forest Service shall perform an inspection upon Contractor’s written request and assurance that work has been completed. Request shall be for a reasonable portion of work. Acceptance may be made for all or portions of work.

Page 24 of 111 Summit Ranger District

7. GOVERNMENT QUALITY ASSURANCE SURVEILLANCE PLAN

Quality assurance plans specific to individual items will be found in Appendix A.

8. FAR 52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR

1984)

The Contractor shall be required to (a) commence work under this contract within 10 calendar days after receipt of Notice to Proceed or Order for specific work items, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than November 30, 2029. The time stated for completion shall include final cleanup of the premises.

Performance shall be made only as authorized by orders issued in accordance with the Ordering clauses. Except as this contract otherwise provides, the Government shall order all services within the scope that are required by

Government activities specified in the Schedule only with the vendor holding this contract for the specified services. Timber Removal activities shall be scheduled and carried out in accordance with the Timber Removal

Specifications in Appendix B and/or C and as approved by the Contracting Officer.

9. AGAR 452.211-74 PERIOD OF PERFORMANCE (FEB 1988)

The period of performance of this contract is from date of award through November 30, 2029.

The following is the Forest Services desired schedule and will be used to determine/track if contractor will successfully complete all work on time. Failure to meet the following timelines may result in Optional work Items not being awarded. Continued failure to meet the desired schedule below may result in

Termination for Cause for failure to perform.

Items 1, 2, 3, 4, and 5 Completed by October 31, 2024

Treatment Area 1 (Dry Meadow/Sourgrass):

Items 6 and 7 Completed by October 31, 2025

Items 11 Completed by October 31, 2026

Item 8, 9, 10, 12, and 13 Completed by October 31, 2027

Treatment Area 2(Bull Creek/Beardsley/Pedro Flat):

Item 6 and 7 Completed by October 31, 2026

Item 14 Completed by October 31, 2027

Item 8, 9, 10, 15, and 16 Completed by October 31, 2028

Treatment Area 3 (Campoodle/Smoothwire):

Item 6 and 7 Completed by October 31, 2027

Item 17 Completed by October 31, 2028

Item 8, 9, 10, 18, and 19 Completed by October 31, 2029

Page 25 of 111 Summit Ranger District

10. SCHEDULES AND REPORTS

Pursuant to contract requirements, the following submittals are required within 10 days after issuance of a

Notice to Proceed for review and/or approval, unless stated elsewhere in the specifications or otherwise mutually agreed:

ITEM DESCRIPTION

Proposed progress schedule showing starting and completion dates of planned treatment areas and various phases of the work.

List of proposed sub-contractors and their intended work. Sub-contractors must have Contracting

Officers Written approval prior to starting work on the project. Large businesses must submit a Small

Business Sub-Contracting Plan as required per FAR 52.209-9. Plan shall be submitted after award.

Fire Plan

Equipment Load Limitations List

Designation of Contractor personnel describing responsibilities and authorities

Operator Identification Number from the County Agricultural Commissioner or Pest Control Business

License

All schedules and reports shall be submitted to the COR.

11. PAYMENT

It is anticipated that funds will…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .