This is Addendum No. 1 to a Request for Proposal (RFP 2025-SWB-10) issued by the Sewerage & Water Board of New Orleans for Drainage System Cleaning and Inspection Services. The proposals are due on February 21, 2025, at 11:00 a.m. CST. The contract requires completion of 95% of the work within 275 calendar days. The scope includes requirements for vacuum truck debris handling, water usage tracking, and utility service arrangements. The proposer must provide appropriate backflow prevention assemblies and metered devices for filling combination cleaning vacuum trucks.

The addendum specifies liquidated damages of $1,000 per day for late completion. The proposer must complete a minimum of 51% of the contract work with their own forces. The Economically Disadvantaged Business Participation Sheet and EDBP Acknowledgement of Negotiated Terms Form must be submitted with the Cost Proposal in a separate envelope. A pre-proposal meeting was held on February 7, 2025, with attendance from multiple contractors including CMG Pipelines, Atakapa Services, W&T Contracting Corporation, HK Solutions Group, Blue Flash, Wallace C Drennan, and Compliance EnviroSystems, LLC.

View the file

Other files

File Type Posted
123460-2025-SWB-10-3.pdf PDF
123460-2025-SWB-10.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

“RE-BUILDING THE CITY’S WATER SYSTEMS FOR THE 21ST CENTURY”

Sewerage & Water Board OF NEW ORLEANS

625 ST. JOSEPH STREET

NEW ORLEANS, LA 70165 504-529-2837 OR 52-WATER

www.swbno.org

Addendum No. _1__

Date: 2/12/2025

Your reference is directed to the Request for Proposal for 2025-SWB-10 Drainage System Cleaning and Inspection Services for the Sewerage and Water Board of New Orleans proposals that are due on February 21, 2025, at 11:00 a.m. (CST).

This addendum provides for the following:

1) Revisions to Bid Document

2) Questions Answered

3) Pre-Bid Attendance

1. Replace Part II, Section III, Paragraph IV with:

a. “It shall be the responsibility of the proposer to adequately decant the combination vacuum trucks debris body to ensure the maximum amount of solids and minimum amount of water is disposed of at the appropriate disposal facilities. Should disposed debris be observed to be overly saturated with water, a percentage deduction to the disposal bid item of 10% shall be applied.”

2. Add Part II, Section IV – Special Project Requirements, Execution of the work requirements:

a. K. It is the responsibility of the Proposer to make all necessary arrangements for the provision of water, electricity, drainage, sanitary sewage disposal, gas, compressed air, and any other utility service required to prosecute the work of this contract. Water used by the Proposer for this contract will be furnished by the Board at no cost to the Proposer, if conditions permit. Costs of all other services shall be borne by the Proposer. The proposer will be responsible for providing appropriate backflow prevention assemblies to fill the combination cleaning vacuum truck tanks and may be required to use metered devices.

Proposer will be required to keep track of water usage and provide those numbers to SWBNO for accounting purposes.

3. Add Part II, Section IV – Special Project Requirements, Between Execution of the work requirements and Construction Photographs And Documentation Of The Work:

a. Working days

i. The proposer will have 275 calendar days to complete the scope of work to a minimum of 95% completion.

b. Liquidated damages

i. Should the proposer fail to complete the work within the specified time as provided in these specifications, the Proposer shall pay to the SWBNO, not as a penalty, but as acknowledged liquidated damages, the sum per day in the amount of $1,000 for each day the proposer is delinquent. This amount will be reported to the SWBNO’s Chief Financial Officer, who will deduct the same amount from any balance then due or which may become due to the Proposer. The SWBNO will not ask the Proposer to waive “notice of default”.

4. Add Part II, 2.13 Subcontractor, at end of paragraph:

a. The proposer shall complete with its own forces a minimum of 51% of the contract work.

5. I notice that fee schedules are to be turned in via separate envelope. However, the required DBE correspondence includes negotiated terms and rates. I wanted to confirm that including these rates in the bid package would not be grounds for disqualification? Or should these terms and rates be included in the separate price schedule envelope?

The Economically Disadvantaged Business Participation Sheet and EDBP Acknowledgement of Negotiated Terms Form shall be turned in with the Cost Proposal.

6. What kind of reports are required from the sonar inspection? Debris levels, etc.?

Please refer to Part II, Secon II, Sonar Inspection on page 13.

The above revisions shall be incorporated in and take precedence over any conflicting part of the original proposal documents. This addendum is hereby officially made a part of the referenced proposal.

This addendum consists of four (4) pages.

*** END OF ADDENDUM ***

Please write legibly

NAME COMPANY EMAIL

Connor Metcalf SWBNO Cmetcalf@Swbno.org

Xavier Chavez‐Reyes SWBNO xchavez‐reyes@swbno.org

Michael Frazier, Jr SWBNO mfrazier2@swbno.org

Kevin Smith SWBNO ksmith6@swbno.org

Angel Johnson SWBNO Ajohnson4@swbno.org

Austin Wolfson CMG Pipelines austin@cmgpipelines.com

Hayden Case Atakapa Services hcase@atakapaservices.com

Mahmuud Thomas W&T Contracting Corporation mahmuudthomas@wtccontractingcorp.com

Tameka Kueser HK Solutions Group tkueser@hksolutionsgroup.com

Kelly Cazaux Blue Flash office@blueflash.net

Tim Morgan Wallace C Drennan Estimating@wallacecdrennan.com

SEWERAGE & WATER BOARD OF NEW ORLEANS

ATTENDANCE SHEET

MEETING DATE: February 7, 2025. 11:00 A.M.

FACILITATOR: Connor Metcalf, Procurement AnalystPLACE/ROOM: Support Services Conference Room

PROJECT: Pre‐Proposal Meeting: 2025‐SWB‐10

Please write legibly

NAME COMPANY EMAIL

SEWERAGE & WATER BOARD OF NEW ORLEANS

ATTENDANCE SHEET

MEETING DATE: February 7, 2025. 11:00 A.M.

FACILITATOR: Connor Metcalf, Procurement AnalystPLACE/ROOM: Support Services Conference Room

PROJECT: Pre‐Proposal Meeting: 2025‐SWB‐10

Josh Mackles Atakapa Services jmackles@atakapaservices.com

Josh Graham Compliance EnviroSystems, LLC jgraham@ces‐sses.com

File details come from the government source that posted it. Updated .