Attachment_2_Drawing.pdf

PDF 567 KB Posted

Attached to
Heat Pump Replacement - Gauley Ranger District, Monongahela National Forest
Solicitation number
12343418Q0003
Issued by

About this file

Drawing

View the file

Other files

File Type Posted
Response_to_Questions___Gauley_Office_HVAC_Prequote_notes.docx DOCX document
SITE_VISIT_ATTENDANCE_SHEET.docx DOCX document
Amendment_SF30_Gauley_Heat_Pump.pdf PDF
Attachment_1_Unit_Submittal.pdf PDF
Location_maps.docx DOCX document
Pictures.docx DOCX document
Scope_of_Work_-_Gauley_District_Office_2018.docx DOCX document
RFQ_Solicitation.Gauley_Heat_Pump.rtf RTF text file
Wage_RatesWV21.txt TXT text file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

75.875 OD

5.37526.375

20.0

4.0

12.0

5.022.025.01.0

2.0

54.0 OD

13.875

3.0

1.375

SEE NOTE

6 BELOW

OA HOOD

END ACCESS DOOR

SIDE

CONTROL

PANEL END

CONDENSER

SIDE

SEE NOTE

6 BELOW

R/A

S/A

SUPPLY AIRRETURN

AIR

SHEET 1 OF 1

UNLESS OTHERWISE SPECIFIED

DIMENSIONS ARE IN INCHES.

SCALE: 1:24 WEIGHT: 186.50

REVDRAWING NO.

A

SIZE

TITLE

NAME DATE

ENG APPR.

CHECKED

DRAWN

Aladdin Metal Products, Inc.

Forest Park, GA 30297

Office:404-366-2215 Fax:404-366-9480

THIRD ANGLE PROJECTION

NOTICE: CONTAINS CONFIDENTIAL/PROPRIETARY INFORMATION. ANY

UNAUTHORIZED REPRODUCTION OR DISCLOSURE STRICTLY PROHIBITED.

REVISIONS

DESCRIPTION DATE APPROVEDREV DRAWN

M.PLOTNER

10/27/09

AAON

B-BOX SLAB MT

1. MATERIAL: 18 GA. GALVANIZED STEEL

2. FULLY WELDED.

3. HEIGHT:

4. SLOPE:

5. INSULATION: 1" FOIL FACED, TAPED SEAMS

6. CONTRACTOR MUST REMOVE CENTER FORK-LIFT RAIL

UNDER AAON UNIT DUE TO INTERFERENCE WITH SCOOP

NOTES:

jvithayapun Text Box

ATTACHMENT 2

Sheet1
Drawing View1
Drawing View2
Drawing View3

File details come from the government source that posted it.