1232SD18R0022_Amd_0001.pdf

PDF 88 KB Posted

Attached to
Replace Sign
Solicitation number
1232SD18R0022
Issued by

About this file

Responses to questions from site visit.

View the file

Other files

File Type Posted
1232SD18R0022_Amd_0003.pdf PDF
Aerial_view_of_parking_lot20180703.pdf PDF
1232SD18R0022_Amd_0002.pdf PDF
RFI_FORM.DOCX DOCX document
Outdoor_Sign_Mockup_Final.pdf PDF
Calculation_of_Self_Performed_Work.xlsx XLSX spreadsheet
SOW_-_Freestanding_facility_sign.pdf PDF
Past_Performance_Capability_Information.docx DOCX document
ars372.pdf PDF
ars371.pdf PDF
Contractor_Certification_Regarding_EMR.pdf PDF
Current_CGPRS_Sign.jpg JPG image
1232SD18R0022.pdf PDF
Wage_Determination_CO180011_03-02-2018_CO11.pdf PDF
Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

1232SD18R0022

x x

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT

THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

AKRON CO 80720

ARS-NPA-5407-01

40335 CO RD GG

CENTRAL GREAT PLAINS RES STATION

USDA ARS NPA CGPRS

USDA ARS NPA, AKRON

ARS-WBSC-0330-05-T

Peoria IL 61604 1815 N University St ARS WBSC Contracting, Acquisition, ARS WBSC Contracting, Acquisition, 06/07/20180001

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

06/07/2018

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

The purpose of this amendment is to provide answers to questions submitted as a result of the site visit.

Q.1: Which taxes will apply to the sign?

A.1: All taxes the vendor is required to pay for the purchase of supplies and materials for this project. They are to be included as your costs. There are no taxes charged directly to the government for the services provided.

Q.2: Do you want the lower portion of the sign to be externally or internally lighted?

Continued ...

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

JEFFERY A. RIDENOUR

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

NSN 7540-01-152-8070

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

NAME OF OFFEROR OR CONTRACTOR

2 3

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

1232SD18R0022/0001

A.2: We do not want any internal or external lighting on the main lower sign.

Q.3: Will we need to provide a computer to communicate with the electronic message center?

A.3: Our I.T Specialist, on site, said that we will supply the computer for the message center.

We would need to know what the communication specifications are needed for that.

Q.4: What matrix do you want for the LEDs in the

EMC? With the viewing distance I would recommend

16MM. 20MM units have been pretty much phased out.

A.4: We will want to go with 16MM matrix in the message center. Something that will last and be easily accessible if any replacement/repairs are need.

Q.5: Do you want the letters on the EMC to have a maximum of 12" tall?

A.5: We want the lettering to be 12" tall, plus or minus ¼".

Q.6: The EMC is self-dimming to adjust to ambient light, do you want to add a time clock to turn it off at same time during the night?

A.6: As long as the EMC is self-dimming at night.

We will not need the sign to be turned off and anytime during the night.

Q.7: The sign structure is sound; do you want to use the existing structure and replace the faces?

A.7: We would like to just replace the sign face given that will be the most cost-efficient way.

One thing that mentioned was in the SOW it does call for brick pillars up each side. I don't know if this will affect just the refacing the sign or not.

Q.8: There is a conduit exposed next to the sign, we are going to check to see if it runs to the panel in the building which would be best, please update if panel space is available, otherwise we will assume we are pulling power from the closest light pole.

Continued ...

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

NAME OF OFFEROR OR CONTRACTOR

3 3

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

1232SD18R0022/0001

A.8: The Conduit that is coming up through the concrete located on the north side of the sign runs from the sign to the light pole in the parking lot. There is 120v going to the light pole in the parking lot and we have located the breaker for that inside the main building breaker box.

All terms and conditions remain unchanged.