1232SD18R0022_Amd_0001.pdf
PDF 88 KB Posted
- Attached to
- Replace Sign
- Solicitation number
- 1232SD18R0022
About this file
Responses to questions from site visit.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 1232SD18R0022_Amd_0003.pdf | ||
| Aerial_view_of_parking_lot20180703.pdf | ||
| 1232SD18R0022_Amd_0002.pdf | ||
| RFI_FORM.DOCX | DOCX document | |
| Outdoor_Sign_Mockup_Final.pdf | ||
| Calculation_of_Self_Performed_Work.xlsx | XLSX spreadsheet | |
| SOW_-_Freestanding_facility_sign.pdf | ||
| Past_Performance_Capability_Information.docx | DOCX document | |
| ars372.pdf | ||
| ars371.pdf | ||
| Contractor_Certification_Regarding_EMR.pdf | ||
| Current_CGPRS_Sign.jpg | JPG image | |
| 1232SD18R0022.pdf | ||
| Wage_Determination_CO180011_03-02-2018_CO11.pdf |
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
1232SD18R0022
x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT
THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
AKRON CO 80720
ARS-NPA-5407-01
40335 CO RD GG
CENTRAL GREAT PLAINS RES STATION
USDA ARS NPA CGPRS
USDA ARS NPA, AKRON
ARS-WBSC-0330-05-T
Peoria IL 61604 1815 N University St ARS WBSC Contracting, Acquisition, ARS WBSC Contracting, Acquisition, 06/07/20180001
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
06/07/2018
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
The purpose of this amendment is to provide answers to questions submitted as a result of the site visit.
Q.1: Which taxes will apply to the sign?
A.1: All taxes the vendor is required to pay for the purchase of supplies and materials for this project. They are to be included as your costs. There are no taxes charged directly to the government for the services provided.
Q.2: Do you want the lower portion of the sign to be externally or internally lighted?
Continued ...
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
JEFFERY A. RIDENOUR
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
NSN 7540-01-152-8070
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
2 3
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
1232SD18R0022/0001
A.2: We do not want any internal or external lighting on the main lower sign.
Q.3: Will we need to provide a computer to communicate with the electronic message center?
A.3: Our I.T Specialist, on site, said that we will supply the computer for the message center.
We would need to know what the communication specifications are needed for that.
Q.4: What matrix do you want for the LEDs in the
EMC? With the viewing distance I would recommend
16MM. 20MM units have been pretty much phased out.
A.4: We will want to go with 16MM matrix in the message center. Something that will last and be easily accessible if any replacement/repairs are need.
Q.5: Do you want the letters on the EMC to have a maximum of 12" tall?
A.5: We want the lettering to be 12" tall, plus or minus ¼".
Q.6: The EMC is self-dimming to adjust to ambient light, do you want to add a time clock to turn it off at same time during the night?
A.6: As long as the EMC is self-dimming at night.
We will not need the sign to be turned off and anytime during the night.
Q.7: The sign structure is sound; do you want to use the existing structure and replace the faces?
A.7: We would like to just replace the sign face given that will be the most cost-efficient way.
One thing that mentioned was in the SOW it does call for brick pillars up each side. I don't know if this will affect just the refacing the sign or not.
Q.8: There is a conduit exposed next to the sign, we are going to check to see if it runs to the panel in the building which would be best, please update if panel space is available, otherwise we will assume we are pulling power from the closest light pole.
Continued ...
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
3 3
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
1232SD18R0022/0001
A.8: The Conduit that is coming up through the concrete located on the north side of the sign runs from the sign to the light pole in the parking lot. There is 120v going to the light pole in the parking lot and we have located the breaker for that inside the main building breaker box.
All terms and conditions remain unchanged.