Statement of Work Revised.docx
DOCX document 89 KB Posted
- Solicitation number
- 1232SA26Q1449
- Issued by
-
Department of Agriculture Forest Service
About this file
This is a Statement of Work for the installation of irrigation systems and sod at the U.S. National Poultry Research Center (USNPRC) located at 934 College Station Road, Athens, Georgia 30605. The contractor must install irrigation and sod on the east sides of Buildings B-45, B-46, and B-1, including boring 250 feet from the sidewalk in front of B-45 to valve boxes in the courtyard, adding 12 irrigation zones to an existing time clock for new and existing sodded areas, installing Zeon zoysia on the east side of B-46, providing irrigation to native wildflower planters in the B-1 courtyard with a battery timer, and irrigating exterior planter boxes on the rear of B-1. The contractor must supply all labor, materials, equipment, testing, personal protective equipment, and perform daily jobsite cleanup and weekly waste removal.
The contractor must complete all work within 45 days of notice to proceed and is required to submit a detailed proposal with cost breakdown, conduct a mandatory pre-bid site visit, maintain active SAM registration, provide daily work reports to the Contracting Officer Representative and weekly status updates to the Technical Point of Contact, and maintain a superintendent on-site during installation. Pre-construction submittals must include a project schedule, Site Specific Safety Plan, and personnel list. All work must comply with ANSI, ASME, NEC, NFPA 72, OSHA, ADA standards, ARS 242.1M Facilities Design Standards, and the International Building Code. The contractor shall provide a one-year guarantee on all work against faulty materials and workmanship, with corrections required within 24 hours of notification. The facility will remain occupied during construction, requiring work coordination with facility representatives. Key contacts include Contracting Officer (TBD), Administrative Officer Charlotte Gilman, Facilities Operation Manager Walt Dennis, and Maintenance Liaison Brandon Randall.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 1232SA26Q1449 Questions and Answers Final.docx | DOCX document | |
| Statement of Work.docx | DOCX document | |
| Wage Determination.pdf | ||
| 1232SA26Q1449 Solicitation.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work USDA, Agricultural Research Service
United States Department of Agriculture Agricultural Research Service
STATEMENT OF WORK
Install Irrigation and Sod for the East Sides of B-45, B-46, and B-1
USNPRC, B1
934 College Station Road Athens GA, 30605
Prepared by:
Brandon Randall
| Version 2.8, Page - |
| Page 10 of 10 |
Scope of Work The contractor shall provide all professional services necessary to install irrigation and sod for the East sides of B-45, B-46, and B-1. located at the USDA, ARS, USNPRC B1 on 934 College Station Road Athens GA, 30605.
The contractor shall include all services and field labor, equipment, materials, testing and personal protective equipment necessary to perform the work. No Government equipment will be available for use by the contractor.
Base Bid The contractor shall provide a detailed proposal and cost breakdown for the entire project as specified in this statement of work.
Site Visit A site visit is mandatory while escorted by a government representative to confirm locations, dimensions, and conditions of the project before a bid is submitted. The site visit shall be for the purpose of observing first‑hand any conditions relevant to the completion of this project. No consideration will be given to claims based on lack of knowledge of existing conditions, except where contract documents make definite provisions for adjustment in cost or extension due to existing conditions not readily foreseeable.
Contractor must be registered in System for Award Management, (SAM), prior to submitting a bid. Registration can be completed at www.sam.gov/portal/public/SAM
Codes and Standards Applicable Codes and Standards apply and are not limited to the following
| ANSI - | American National Standards Institute. |
| ASME - | American Society of Mechanical Engineers. |
| NEC - | National Electrical Code, NFPA 72. |
| OSHA - | Occupational Safety and Health Administration |
| ADA – | Americans with Disabilities Act |
All work must meet ARS 242.1M “ARS Facilities Design Standards” for the defined scope of this project in addition to meeting all Local, State and Federal codes, and latest International Building Code (IBC).
Project Summary The project consists of the following elements:
1. Bore from outside sidewalk in front of B-45 250ft to the valve boxes inside the courtyard to expand the irrigation to the new sodded area.
2. Add 12 zones of irrigation to the existing time clock for the new sod installed. Also, for the two areas that are already sodded.
3. Install Zeon zoysia on the East side of B-46.
4. Provide irrigation to native wildflower planters in B-1 courtyard with battery timer.
5. Provide irrigation to exterior planter boxes on rear side of B-1.
6. Test for proper function and leaks
7. Clean the jobsites thoroughly
The facility will be occupied during construction activities. All work shall be scheduled in advance and coordinated with the facility representative to minimize the disruption to daily operations and research programs.
Utilization of Bio-Based Products
The contractor shall utilize products and material based from bio- based materials as applicable, (e.g. bio-based greases; bio-based hydraulic fluids, bio-based absorbents), to the maximum extent possible without jeopardizing the intended end use of detracting from the overall quality delivered to the end user. All supplies and materials shall be of a type and quality that conform to the applicable Federal Specifications and Standards. All supplies and materials to be used in the performance of work described herein are subject to the approval of the Contracting Officer Representative (COR). Products can be found at: www.biopreferred.gov
Safety The contractor will submit a Site Safety Specific Plan (SSSP)/Accident Prevention Plan in industry recognizable format to the Contracting Officer within 14 days of contract award. The Government shall review the SSSP prior to the start any construction activities.
Safety and health matters, as they relate to the work, are the exclusive responsibility of the contractor. The contractor shall furnish, erect, and maintain barricades, warning lights, signs, guards, or take other precautions that may be required by law or local authorities for the protection and security of the grounds, facilities, and personnel. Contractor shall coordinate with Lab Personnel and strictly always follow all Covid related precautions and procedures.
Contractor Requirements The contractor shall provide a complete and functional installation, including all labor, supervision, tools, materials, equipment, apparatus, transportation, rigging and other equipment and services necessary to accomplish the work in accordance with the intent and meaning of this statement of work.
The project work shall be performed per the following guidelines:
1) Contractor will verify all dimensions and existing site conditions prior to beginning work.
2) The contractor shall always be responsible for protecting his work and ensuring the safety of his crew and ARS employees.
3) Contractor shall remove and dispose of all construction related materials from all work areas daily and remove these waste materials from the site on a weekly basis.
4) Contractor is required to manage the project and consult with the Government prior to beginning all work phases.
5) Contractor shall perform work in a manner that minimizes the impact to daily operations of the facility and its workers. The building will be occupied during construction work.
6) Contractor will provide daily reports of work performed to the COR and weekly status updates to the TPOC.
7) Contractor must have a superintendent on the jobsite when crews are performing the installation work.
8) Contractor will provide their own restroom facility.
9) All Contractor personnel will be required to show a valid Federal or State ID to enter the property.
10) Contractor will abide by all USDA Biosecurity protocols relevant to this project.
All work is to be performed according with building codes, ordinances and laws of the Authority having jurisdiction on the project. When the requirements of the building codes, ordinances, and laws conflict with any other part of the building codes, ordinances and laws, the most restrictive requirement shall prevail. The Contractor is responsible for obtaining all permits and construction approvals necessary to successfully complete the project.
Documentation Requirements
Material Submittals The contractor shall submit for approval all documents/samples necessary to ensure requirements of project will be satisfied. Electronic submittals on all equipment and materials used on this project shall be submitted to the TPOC noted in this document.
Pre-Construction Submittals Prior to construction activities beginning the following submittals must be provided to the CO and TPOC for approval.
1. Project Schedule (including daily work start/stop time)
2. Site Specific Safety Plan (SSSP) / Accident Prevention Plan
3. List of contract personnel of the general and subcontractors
General Requirements
Damage to Property:
The Contractor shall protect the work, the site, and all existing property and structures within the limits of the construction activities or that may be affected thereby until acceptance of the work. Any damage to property shall be repaired to pre-damaged condition to the satisfaction of the TPOC.
Inspection and Acceptance A government representative shall inspect and approve the work performed on this project. The Contractor shall schedule inspection a minimum of 2 days in advance with the TPOC.
Period of Performance The completion of this project shall not exceed 45 days from date of notice to proceed. A request for time extension must be submitted to the Contracting Specialist in writing. Each request must include specific and detailed reasons in support of the schedule alteration.
Work Hours:
Contractor work hours shall be Monday through Friday, 7:00 A.M. to 4:30 P.M. except on Government holidays. Any changes to work schedule shall be submitted to Contacting Officer for written approval prior to schedule change.
Guaranty The contractor shall provide and submit a single guarantee stating that all portions of the work are in accordance with Contract requirements. Guarantee all work against faulty and improper material and workmanship for a period not less than one (1) year from date of final acceptance by the USDA, except where manufacturer guarantees or warranties are for longer terms. The contractor shall correct any deficiencies which occur during the guarantee period within 24 hours after notification.
Project Contacts
Contracting Officer (CO):
TBD
Administrative Officer (AO):
Charlotte Gilman 934 College Station Road Charlotte.Gilman@usda.gov Athens GA, 30605 Phone: 706-546-3029
Facilities Operation Manager (TPOC):
| Walt Dennis | Walt.Dennis@usda.gov |
| 934 College Station Rd | Phone: 706-546-3715 x5222 |
Athens, GA 30605
Maintenance Liaison (TPOC/COR):
| Brandon Randall | brandon.randall@usda.gov |
| 934 College Station Rd | Phone: C 706-340-1818 |
Athens, GA 30605 image1.jpg
File details come from the government source that posted it. Updated .