A04_StatementofWork_1167258 Amended.pdf

PDF 357 KB Posted

Attached to
Semi-Annual Preventative Maintenance for Security Gates Federal contract opportunity
Solicitation number
1232SA26Q1174
Issued by
Department of Agriculture Agricultural Research Service

About this file

This is a Statement of Work (SOW) for semi-annual preventative maintenance services for security gates at the USDA National Centers for Animal Health (NCAH) facility located at 1920 Dayton Ave. Ames, Iowa. The contractor shall provide comprehensive maintenance and inspection services twice annually—once in April and once in October—for 24 slide-gate style security gates comprised of two models: Lift Master SL-590-75-21-G (single operator, slide type) and Lift Master MAT-DC-BB3 (barrier type). The maintenance program must include detailed inspections and servicing of truck assemblies, drive tracks, roller wheel bolts, posts, structural components, control boards, power supplies, gearboxes, shafts, sprockets, bearings, clutch assemblies, drive belts, chains, hydraulic fluid reservoirs, and loop detection systems, along with lubrication, cleaning, and tightening of components as needed.

The work must be coordinated with the government's Point of Contact (POC) or Contracting Officer's Representative (COR). Contractors must provide a lockout/tagout program for USDA review prior to work commencement, with lockout/tagout requests submitted five working days in advance. Site access is controlled and requires contractor check-in at the main gate and Building 20 lobby each day with a government-issued photo ID to receive a contractor pass. Regular work hours are 7:00 a.m. to 5:00 p.m., Monday through Friday, excluding Federal holidays. At least two weeks' notice is required before work begins. The government will provide escorts for technicians and allow use of existing USDA utilities and public restroom facilities. The Contracting Officer's Representative will inspect completed work for approval prior to considering work complete. Travel is not applicable, and contractors should schedule a preliminary site visit by contacting Jeff Waterbury at jeff.waterbury@usda.gov.

View the file

Other files for this federal contract opportunity

Other files attached to Semi-Annual Preventative Maintenance for Security Gates, newest first.
File Type Posted
A04_StatementofWork_1167258 Amended.pdf PDF
C04a_WageDetermination_1232SA26Q1174.pdf PDF
A04_StatementofWork_1167258.pdf PDF
C04_CSS_1232SA26Q1174.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

US Department of Agriculture (USDA)

Statement of Work

Contents Project General Information

1.0 Scope of Work

2.0 Background

Contractor Requirements

3.0 Technical Requirements / Tasks

4.0 Government Furnished

5.0 Deliverables / Schedule

6.0 Travel

7.0 Contractor’s Key Personnel

8.0 Security Requirements

9.0 Data Rights

10.0 Section 508 – Electronic and Information Technology Standards Attachment

Project:

SEMI-ANNUAL PREVENTATIVE MAINTENANCE FOR SECURITY GATES

General Information

1.0 Scope of Work

Provide the USDA/NCAH with a semi-annual preventative maintenance program for the security gates throughout the campus located at 1920 Dayton Ave. Ames, Iowa.

2.0 Background: The National Centers for Animal Health is currently in need for a semi-annual preventative maintenance program for the security gates throughout the campus located at 1920 Dayton Ave. Ames, Iowa. This will include 24 slide gate style, single operator, and slide operator type. Brand and model lift master SL-590-75-21-G and lift master MAT-DC-BB3.

The National Centers for Animal Health, hereinafter referred to as NCAH, is part of the United States Department of Agriculture (USDA). NCAH houses three separate USDA entities:

National Animal Disease Center (NADC): The NADC conducts basic and applied research on selected diseases of economic importance to the U.S. livestock and poultry industry.

National Veterinary Services Laboratories (NVSL): The NVSL is responsible for diagnosis for domestic and foreign animal diseases, diagnostic support for disease control and eradication programs, import and export testing of animals, training, and laboratory certification for selected diseases.

Center for Veterinary Biologics (CVB): The CVB is responsible for implementing the Virus-Serum- Toxin Act of 1913 as amended in 1985 to ensure that veterinary biologics (Vaccines, bacterins, antisera, diagnostic kits and other products of biological origin) available for the diagnosis, prevention, and treatment of animal diseases are pure, safe, potent, and effective.

The NCAH is comprised of one large facility including approximately 520 acres.

Contractor Requirements

3.0 Technical Requirements / Tasks

The contractor shall provide all labor and skills required to perform the following PM inspections.

All work must be performed once in April and the other in Oct. all must be coordinated with the POC or COR, contact information will be provided. Listed below are the maintenance inspections needed per gate style.

• Lift Master SL-590-75-21-G

• Gate style: Slide

• Single operator

• Operator type: Slide

Inspect and grease truck assembly / drive track Inspect & tighten any loose roller wheel set bolts.

Inspect Drive track for damage.

Inspect Posts for Looseness Inspect for loose or missing clamps, bolts and/or broken welds, gate mesh ties Etc… Inspect / Install If Needed "Danger Automated Gate" Sign

Control Board Operating Voltage Verified Inspect and Ensure Proper Power Supply to Gate Operator Voltage: (Check Name Plate for specific rating. Use Volt Meter.)

Inspect door / cover lock for functionality.

Inspect Gear Box for Proper Oil Levels. If Low, Add Oil Inspect shaft, sprockets, and bearings for functionality.

Inspect clutch assembly for functionality.

Inspect drive belt for functionality. Also inspect for excessive belt dust, Indicating belt wear.

Inspect operator mounting bolts for any loose bolts and tighten if needed.

Inspect door / cover for proper clearance, it should not rub on the chain.

Inspect & clean gate operator exterior.

Inspect & clean gate operator interior.

Foreign objects inside of cabinet.

Inspect timer on operator.

Check Chain for Proper Adjustment.

Check Chain for Wear.

Grease/lube chain.

Check hydraulic fluid reservoir.

Grease / lube chain drive & idler sprockets.

• Single operator

• Barrier Inspect and grease truck assembly / drive track

Inspect & tighten any loose roller wheel set bolts.

Inspect Drive track for damage.

Inspect Posts for Looseness Inspect for loose or missing clamps, bolts and/or broken welds, gate mesh ties Etc… Inspect / Install If Needed "Danger Automated Gate" Sign Control Board Operating Voltage Verified Inspect and Ensure Proper Power Supply to Gate Operator Voltage: (Check Name Plate for specific rating. Use Volt Meter.)

Inspect door / cover lock for functionality.

Inspect Gear Box for Proper Oil Levels. If Low, Add Oil Inspect shaft, sprockets, and bearings for functionality.

Inspect clutch assembly for functionality.

Inspect drive belt for functionality. Also inspect for excessive belt dust, Indicating belt wear.

Inspect operator mounting bolts for any loose bolts and tighten if needed.

Inspect door / cover for proper clearance, it should not rub on the chain.

Inspect & clean gate operator exterior.

Inspect & clean gate operator interior.

Foreign objects inside of cabinet.

Inspect timer on operator.

Check Chain for Proper Adjustment.

Check Chain for Wear.

Grease/lube chain.

Check hydraulic fluid reservoir.

Grease / lube chain drive & idler sprockets.

• Loops Inspect operation of loop Inspect for resealing of loop if needed.

Contractors are strongly encouraged to schedule a site visit to look at the elevators. Contact Jeff Waterbury via email at jeff.waterbury@usda.gov to arrange for a site visit.

Work Restrictions & Conditions

A. Site Security Access

1. Access to the site is controlled by a security fence and visitor/contractor check-in/check-out system. All contractor/subcontractor employees shall sign-in and out at the site entrance gate and always wear a contractor/visitor identification badge while on the site. The ID badges will be turned in at the end of the workday. A current government-issued identification with a picture ID is required for entry.

2. The Contractor shall use only the service roads and access routes approved by the Contracting Officer’s Representative, Michael Kuennen or as designated.

3. Additional security requirements may be imposed when the Federal Government raises the Homeland Security Alert Level. Additional directions will be provided if the situation occurs.

4. Failure to comply with access requirements shall be adequate grounds for removal of the Contractor/subcontractor employees from the site and barring further site access to individuals.

5. No “tailgating” of USDA employees through secure entrances is allowed.

6. No animals/pets are allowed to be brought on the site regardless of whether they are left in a vehicle in the parking lot or not.

B. Work Hours: Regular work hours for the site are 7:00am to 6:00pm, Monday through Friday, excluding Federal holidays.

C. Work Outside of Regular Work Hours: Is not authorized unless it is an Emergency Situation and

Contractor has been requested to Service an Elevator by the proper Federal Authority.

Quality Control Requirements

A. COR shall inspect the completed work for approval with the contractor prior to considering the work to be complete.

Temporary Facilities

A. Utilities: The existing USDA utilities at the site may be used by the Contractor for completion of the contract work at no cost to the Contractor.

B. Telephones: The Contractor shall equip all his foremen and work leaders with cell phones as necessary to coordinate the work effort. The Government will not provide any phone service for the project.

C. Toilet Facilities: The Contractor is allowed to use Public Toilet Facilities within Building 20.

mailto:jeff.waterbury@usda.gov

D. Smoking is only allowed in the outdoor smoking building located at the northwest corner of Building 20. The contractor will need to check in and out at the South Guard Desk of Building 20 to use the smoking location, no propping of doors is allowed.

1.01 Lock-out/Tag-out Program for the Contractor shall be provided for USDA review prior to starting work.

Lockout/tagout requests shall be submitted to the COR 5 working days prior to starting the

Work.

Insert Technical Requirements / Tasks Here

4.0 Government Furnished

NCAH will provide escorts for technicians

5.0 Deliverables / Schedule

Key Deliverables

Item

Deliverable

Objective

Due

Lift master SL-590-75- 21-G/single operator (Slide)

Inspection Grease truck assemble/drive track Semi-annually

Inspection Tighten any loose roller wheel set bolts

Semi-annually

Inspection Drive track for damage Semi-annually Inspection Posts for looseness Semi-annually Inspection Loose or missing clamps, bolts, and/or broken welds, gate mesh ties etc…

Semi-annually

Inspection/install If needed “Danger Automated Gate” sign

Semi-annually

Check Voltage on control board Semi-annually Inspect/ensure Proper power supply to gate operator Semi-annually

Check/voltage Check name plate for specific rating. Use voltmeter.

Semi-annually

Inspection Door and cover lock for functionality

Semi-annually

Inspection Gear level for proper oil levels, add if needed

Semi-annually

Inspection Shaft, sprockets, and bearings for functionality

Semi-annually

Inspection Drive belt for functionality, also inspect for excessive belt dust, indication belt wear

Semi-annually

Inspection Operating mounting bolts for any loose bolts and tighten if needed

Semi-annually

Inspection Door/cover for proper clearance, it should not rub on the chain

Semi-annually

Inspection/clean Gate operator exterior Semi-annually

Inspection/clean Gate operator interior Semi-annually Inspection Timer on operator Semi-annually Inspection Chain for proper adjustment Semi-annually Inspection Chain for wear Semi-annually Inspection Hydraulic fluid reservoir Semi-annually Grease/lube Chain drive/idler sprockets Semi-annually Single operator (Barrier)

Inspection Tighten any loose roller wheel set bolts

Semi-annually

Inspection Drive track for damage Semi-annually Inspection Posts for looseness Semi-annually Inspection Loose or missing clamps, bolts, and/or broken welds, gate mesh ties etc…

Semi-annually

Inspection Grease truck assemble/drive track Semi-annually Inspection/install If needed “Danger Automated

Gate” sign Semi-annually

Check Voltage on control board Semi-annually Inspect/ensure Proper power supply to gate operator Semi-annually

Check/voltage Check name plate for specific rating. Use voltmeter.

Semi-annually

Inspection Door and cover lock for functionality

Semi-annually

Inspection Gear level for proper oil levels, add if needed

Semi-annually

Inspection Shaft, sprockets, and bearings for functionality

Semi-annually

Inspection Drive belt for functionality, also inspect for excessive belt dust, indication belt wear

Semi-annually

Inspection Door/cover for proper clearance, it should not rub on the chain

Semi-annually

Inspection Operating mounting bolts for any loose bolts and tighten if needed

Semi-annually

Inspection/clean Gate operator exterior Semi-annually Inspection/clean Gate operator interior Semi-annually Inspection Timer on operator Semi-annually Inspection Chain for proper adjustment Semi-annually Inspection Chain for wear Semi-annually Inspection Hydraulic fluid reservoir Semi-annually Grease/lube Chain drive/idler sprockets Semi-annually Loops Inspection Operation of loop Semi-annually Inspection For resealing of loop if needed Semi-annually

6.0 Travel

Not applicable

7.0 Contractor’s Key Personnel

8.0 Security Requirements

At least a 2-week notice needs to be given before work is to begin.

All contractors must check-in at main gate and main desk at lobby Southwest entrance to building 20 each day to receive contractor pass (driver’s license will be needed.) Working hours are between 7:00 am and 5:00 pm daily.

9.0 Data Rights

10.0 Section 508 – Electronic and Information Technology Standards

Attachment

Project:
General Information
1.0 Scope of Work
3.0 Technical Requirements / Tasks
4.0 Government Furnished
5.0 Deliverables / Schedule
6.0 Travel
7.0 Contractor’s Key Personnel
8.0 Security Requirements
9.0 Data Rights
10.0 Section 508 – Electronic and Information Technology Standards
Attachment