This document is Amendment 0002 to Solicitation 1232SA26Q0784, issued by the USDA Agricultural Research Service (ARS) Acquisition and Property Division in Beltsville, Maryland on July 13, 2026, with an effective date of August 4, 2026.

The solicitation is for a roof replacement project at the USDA ARS facility in Dawson, Georgia. Contractors must provide all labor, materials, equipment, supplies, supervision, and transportation necessary to complete the roof replacement in accordance with the terms, conditions, drawings, specifications, and attachments in the Purchase Order. The project completion deadline is 120 days after Notice to Proceed. This is a construction Purchase Order subject to Construction Wage Requirements, with labor rates and benefits governed by Department of Labor General Decision No. GA20260312 dated May 18, 2026. Contractors must submit payroll records for personnel working on this order; failure to provide these records will delay invoice payment. A Payment Bond (SF-25A) or Irrevocable Letter of Credit must be submitted within 10 calendar days after award and approved before on-site work commences and Notice to Proceed is issued. All invoices must be submitted electronically through the Invoice Processing Platform (IPP) at www.ipp.gov. Amendment 0002 extends the response deadline to August 11, 2026 at 1600 local time, issues a Questions and Answers document as Attachment 7, corrects attachment numbering, and adds as-built drawings. Acknowledgement of Amendment 0002 is required with quote submission. The contracting officer is Joshua A. Keadle.

View the file

Other files

Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

1232SA26Q0784

x x

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

ARS-1232SA

BELTSVILLE MD 20705

RM 3-2102

5601 SUNNYSIDE AVENUE

USDA ARS ACQUISITION AND PROPERTY D

08/04/20260002

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

07/13/2026

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Provide all labor, materials, equipment, supplies, supervision, and transportation needed to complete a roof replacement at USDA

ARS in Dawson, GA. All work shall be done in accordance with (IAW) the terms and conditions, drawings, specifications and other attachments set forth in the Purchase Order.

Department of Labor General Decision No.

GA20260312 dated 05/18/2026 is applicable to this

Purchase Order.

Continued ...

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

JOSHUA A. KEADLE

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

NAME OF OFFEROR OR CONTRACTOR

2 2

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

1232SA26Q0784/0002

Completion shall be 120 days after Notice to

Proceed.

This will be a construction Purchase Order and as such, compliance with the Construction Wage

Requirements labor rates and benefits; and providing the CO copies of payroll records

(associated with personnel working on this

Purchase Order) are required. Failure to provide these payroll records will result in delayed payment of invoices. On-site work will not be able to commence until the Payment Bond or

Irrevocable Letter of Credit is received and approved by this contracting office; these shall be submitted within 10 calendar days after award.

Your payment bonds must be submitted on Standard

Form (SF)-25A Payment Bond form. Notice to

Proceed will not be issued until these documents are received and approved by the contracting office.

Invoice Processing Platform (IPP): All invoices must be submitted electronically through the IPP via www.ipp.gov. Please see the terms and conditions for details.

1) The purpose of this amendment is to:

A) Issue a questions and answers document as attachment 7

B) Correct attachment numbering

C) Add as-built drawings

D) Extend the response time to August 11, 2026

1600 local.

2. Acknowledgement of this amendment 0002 is required with quote submission.

3. All other terms and conditions remain unchanged.

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

File details come from the government source that posted it. Updated .