250326 Herbarium Fire Suppression SOW (dan).pdf

PDF 133 KB Posted

Attached to
REPAIRS TO NOVEC 1230 FIRE SUPPRESSION SYSTEM, USNA ADMINISTRATION BUILDING HERBARIUM (WASHINGTON, DC)
Solicitation number
1232SA25Q0293
Issued by

About this file

This Statement of Work (SOW) details repairs for the NOVEC 1230 Fire Suppression System at the US National Arboretum Administration Building Herbarium in Washington, D.C. The project involves recharging SEVO 910lb Clean Agent discharged tanks, replacing steel flex hoses, and verifying the system panel is clear and online. The work must be completed within 30 days of the Notice to Proceed, with the buildings remaining occupied and daily operations uninterrupted during the construction phase.

Key personnel include Daniel Jewett as the Contracting Officer Representative and Facility Manager, Stefanye Washington as the Administrative Officer, and Kenneth Brown from the Safety, Health, & Environmental Management Branch. The contract is anticipated to be a Total Small Business Set-Aside under NAICS Code 238220, with a project magnitude between $100,000 and $250,000. The Request for Quotation (RFQ) 1232SA25Q0293 is expected to be issued around July 11, 2025, and will be accessible via SAM.gov.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

UNITED STATES DEPARTMENT OF AGRICULTURE

UNITED STATES NATIONAL ARBORETUM

3501 NEW YORK, AVE. N.E.

WASHINGTON, D.C. 20002

STATEMENT OF WORK AND SPECIFICATION

FOR

REPAIRS TO NOVEC 1230 FIRE SUPPRESSION SYSTEM, USNA

ADMINISTRATION BUILDING HERBARIUM

WASHINGTON, D.C.

March 26, 2025

1. PROJECT HISTORY:

The US National Arboretum Administration Building NA19 located at 3501 New York

Avenue, NE, Washington, DC 20002 is a two-story building with the Herbarium Located in the basement and on the ground level. The Fire Suppression system, NOVEC 1230, Discharged due to a faulty pull station. The pull station has been repaired and is ready for the system Clean Agent to be refilled and tanks serviced.

2. STATEMENT OF WORK (SOW) BASE CONTRACT:

The U.S. National Arboretum (USNA) requires the services of a full-service Fire Suppression contractor to repair the NOVEC 1230 Fire Suppression System located in the Administration Building Herbarium including but not limited to Recharge of SEVO 910lb Clean Agent discharged tanks, Replacement of Steel Flex Hoses, and Verify panel is clear and system is online.

3. GENERAL REQUIREMENTS:

The buildings will be occupied during the construction phase of this project and the security and daily operation of the building must be maintained at all times.

Contractor to test equipment, controls, and operation of the unit. Contractor to provide manufacturer manuals and training to USNA staff of operation and maintenance of equipment.

4. PROPOSAL:

a. Each proposal shall be broken down into the various trades and shall provide sufficient detail to indicate an understanding of the project requirements. The proposal(s) shall contain separate line items for General Conditions, Contractor’s Overhead and Profit, Insurance, and Performance Bonds.

b. The Government may elect to award Bid Options out of sequence as determined by the location’s prioritization requirements

5. PERIOD OF PERFORMANCE:

a. The Period of Performance (POP) shall be Thirty (30) days from the issuance of the Notice to Proceed (NTP).

6. KEY PERSONNEL:

Contracting Officer (CO) TBD

Contracting Officer

Representative

(EPM/COR)

Daniel Jewett

202-341-

Daniel.Jewett@usda.gov

Administrative Officer

(AO)

Stefanye

Washington

220-288-

Stefanye.Washington@usda.gov

Facility Manager (FM) Daniel

Jewett

202-341-

Daniel.jewett@usada.gov

Safety, Health, &

Environmental

Management Branch

(SHEMB)

Kenneth

Brown

240-429-

Kenneth.Brown@usda.gov mailto:Kenneth.Brown@usda.gov

File details come from the government source that posted it. Updated .